All construction in the City shall comply with the requirements of Sections 319.200 through 319.207, RSMo., and any amendments thereto, relating to earthquakes and seismic construction requirements.
[Ord. No. 179 §§2 — 3, 12-2-1980; Ord. No. 337 §§1 — 3, 10-3-2000; Ord. No. 2005-05 §1, 12-6-2005; Ord. No. 2017-009, 9-12-2017; Res. 9-12-2017[1]; Ord. No. 2018-010, 6-12-2018; Ord. No. 2019-009, 7-3-2019]
A. 
The Board of Aldermen does hereby adopt a Development Application and Building Permit Fee Schedules to be in effective until amended by the Board.
Development Application And Building Permit Fee Schedules
Type of Application
Fees
Rezoning
$250.00
Special Use Permit
$100.00
Development Plan Applications:
Minor Development Plan
$100.00
Preliminary Development Plan
$100.00
Final Development Plan
$100.00
Change of Use Permit
$100.00
Vacation (Vacating of Land)
$100.00
Variance (BZA)
(City does not presently have a variance plan)
$100.00
Appeals (BZA)
(City does not presently have a variance plan)
$100.00
Sign and Billboard Permits:
Sign Permit
$100.00
Billboard Sign Permit
No Fee - Business License issued for 1 year $1,000.00
Digital Billboard Permit
$2,000.00
Fireworks Signs
1 free/$50.00 per each additional sign over 6 sq. ft. (2 ft. by 3 ft.)
Temporary Sign Permit
$50.00
Cell Tower Permit/License/Communication
$1,500.00
Cell Tower Repair/Upgrade
$250.00
Fence Permit
(drawing/description required) $75.00
Building Permits:
New Home Plans
(7 inspections - deck is an additional charge)
$950.00
Room Addition
$450.00
(Structural – additional permits needed for electrical, mechanical/HVAC, plumbing)
Remodeling
$250.00
Decks
$250.00
Roofs
No fees
Fence Permit
(Height 6 feet front, 48 inches back)
No fee
(If different – drawing/description required)
$75.00
Tenant Finish
$250.00
Detached Garage
$450.00
Sheds over 200 sq. ft.
$250.00
New Commercial Building
Up to 10,000 sq. ft = $1,500.00
+ additional 1,000 sq. ft. = $50.00
Mechanical, Electrical and Plumbing
Commercial Building
$100.00
Residential
$100.00
Demolition Permit (liability insurance, appropriate safety measures and debris cleaning required)
$250.00
Right-of-Way Permit
$20.00
Court Reporter and transcript fees
Down payment $300.00
plus balance of actual fees incurred
[1]
Editor's Note: Ord. No. 2017-009 set out the provisions in Ch. 415 and repealed this Section, previously titled Fees, and Resolution dated 9-12-2017 added the regulations regarding Development Application and Building Permit Fee Schedules. At the City's direction we have placed these regulations in the Code as an updated Section 500.020.