This chapter regulating the location, construction, alteration,
use and supervision of individual and semipublic water supplies, requiring
certain permits, providing for the inspection of such supplies, the
fixing of fees and prescribing penalties for violation is hereby adopted
pursuant to N.J.S.A. 26:3-69.1 to 3-69.6. A copy of the state statutes
is incorporated by reference and made a part hereof.
This chapter established and adopted is commonly known as "Standards
for the Construction of Public Noncommunity and Nonpublic Water Systems,"
which standards are set forth in Chapter 7:10-12.1 through 7:10-12.43
of the New Jersey Administrative Code and the supplements and additions
thereto pursuant to N.J.S.A. 58:11-23 et seq. and N.J.S.A. 58:12A-1
et seq. and the amendments and supplements thereto.
Three copies of N.J.A.C. 7:10-12.1 et seq., Standards for the
Construction of Public Noncommunity and Nonpublic Water Systems, shall
be placed on file in the offices of the Secretary of the Board of
Health and the Township Clerk for use and examination by the public.
No person shall locate, construct or alter any water supply
system until a permit for the location, construction or alteration
of such water supply is issued by the Board of Health.
The Board of Health may issue a water supply permit if an application
therefor is accompanied by a certificate made by an engineer licensed
to practice professional engineering in the State of New Jersey or
a New-Jersey-State-licensed well driller stating that the design of
the water supply as proposed is in compliance with all applicable
laws. In the case of a replacement well for a building or facility
already served by an individual water supply system, a New-Jersey-licensed
well driller may make such application and certification in lieu of
an engineer.
[Amended 9-18-2019 by BOH Ord. No. 2019-01]
A. For the filing of an application and plans for the issuance of a permit to locate and construct a new water supply system as defined in §
192-1.1, the fee shall be $200. The permit shall be valid for two years from the date of issuance, but may be renewed upon payment of an annual renewal fee of $50. No permit may be renewed more than four times.
B. For the filing of an application and plans for the issuance of a
permit to alter an existing water supply system, the fee shall be
$50. The permit shall be valid for two years from the date of issuance,
but may be renewed upon payment of an annual renewal fee of $20. No
permit may be renewed more than four times.
C. A reinspection fee shall be $75.
The following requirements are to be met prior to the issuance
of a well drilling permit:
A. Payment of the required fee to the Board of Health as provided in
§ 193-6.
B. Prior to the issuance of a well drilling permit for new construction as defined in §
192-1.1, a bond in the amount of $3,000 shall be posted with the Board of Health. The bond shall be in the form of cash, certified check, bank check, letter of credit issued by a banking institution licensed in the State of New Jersey, or a surety bond issued by an insurance company authorized to do business in the State of New Jersey. The form of the letter of credit or bond shall be subject to the prior approval of the Attorney for the Board of Health.
C. Except for wells to be installed in the classification exception area (CEA), if a building permit is not applied for within three months of the well being drilled, the well shall be closed pursuant to New Jersey Department of Environmental Protection well closing regulations. The well shall be closed within 14 days of the end of the three-month period. If the well is not sealed within the fourteen-day period, the Board of Health may use the bond to close the well. The applicant shall be responsible for paying the Board for any closure costs that exceed the amount of the bond. Payment shall be made within 10 days of the demand for payment. Wells installed in the CEA shall conform to the requirements of and be tested as required by §
197-12 and be tested as required by §
197-14. No building permit shall be issued for a property in the CEA unless all the requirements of §
197-11 through §
197-16 have been satisfied. If a well in the CEA does not meet the standards of §
197-11 through §
197-16, the well shall be closed as provided herein.
D. The bond shall remain in effect throughout the period a building
permit is valid. If a permit lapses or is revoked, the well shall
be closed within 14 days of such lapse or revocation date. If the
well is not sealed within 14 days of the lapse or revocation date,
the Board of Health may use the bond to close the well.
E. The bond shall be returned within 30 days after the issuance of a
permanent certificate of occupancy by the Township of Chester.
New water supplies shall not be placed in operation, nor shall
new dwellings or buildings or additions thereto be sold or occupied
which rely on such a supply for water, until the Board of Health has
issued a certificate indicating that the water supply has been located
and constructed in compliance with the terms of the permit issued
and the requirements of this chapter. Issuance of such certificate
shall not be required for alteration to an existing water supply.
If any application for a certificate required by this chapter
is denied by the Board of Health, a hearing shall be held thereon
before the Board within 15 days after request is made for a hearing
by the applicant. Upon such hearing the Board of Health shall affirm,
alter or rescind its previous determination and take action accordingly
within 15 days thereafter.
The Board of Health may order all further work in and about
any water supply which is being erected or installed in violation
of this chapter to be stopped forthwith, except such work as shall
be necessary to remedy such violation, and thereafter the work continued
without any violation of any of the provisions of the code. After
issuance of any such order and the service of a copy thereof upon
any person connected with or working in and about the erection or
installation of such water supply or any part thereof, no further
work shall be done thereon except as aforesaid.
The following amendments, for the purpose of upgrading and establishing specific criteria for individual water systems to protect the health of the Township residents, are made to the Standards for the Construction of Public Noncommunity and Nonpublic Water Systems, incorporated by reference herein. This section shall apply to all new water wells, which will supply new homes and/or buildings as defined in §
192-1.1.
A. Minimum well yields.
(1) Definitions. As used in this article, the following terms shall have
the meanings indicated:
MAXIMUM PUMPING LEVEL
The elevation of water in a well when pumping is in progress,
which must be maintained at a minimum of 10 feet above the bottom
of a well.
PEAK LOAD
The amount of water used during periods of the day when demand
is highest.
PEAK LOAD TIME
The length of time during which the peak load is to be delivered.
PNEUMATIC TANK STORAGE
Volume of water stored between the minimum and maximum pressure
settings in pressure tanks with a two-hundred-twenty-gallon maximum
size.
WELL FLOW
Initial maximum sustainable pumping rate of water (well yield)
at the wellhead in gallons per minute reduced by a decremental factor
of 10%.
WELL STORAGE
The volume of water stored in the well between the static
water level and the maximum pumping level.
(2) All new water wells drilled within the Township of Chester which
are intended to be used as potable water supply for new residential
and/or commercial use shall yield not less than two gallons per minute
at the tap.
(3) Any residential well shall produce at peak load time a well flow
and well storage which, when combined with pneumatic tank storage,
exceeds the peak load. Compliance with this requirement shall be determined
in accordance with the following formulas:
(a)
(Well flow x peak load time) + well storage + pneumatic tank
storage greater than peak load.
(b)
Well flow = 0.9 x (initial well yield).
(c)
Peak load time = 75 minutes x (number of bedrooms) divided by
three x (number of bathrooms).
(d)
Well storage = 3.14 x r2 (well depth - static water level -
10).
(e)
Peak load = 75 gallons x (number of bedrooms).
B. The yield shall be determined through the use of a minimum four-hour
pumping test. The test shall show static level drawdown during pumping
test and recovery time to static level following cessation of pumping.
C. The well driller/pump installer shall:
(1) Perform the pumping test described in Subsection
B of this section.
(2) Supply the Department of Health of the Township of Chester with detailed
information regarding the pump test and shall certify the same to
the Board of Health of the Township of Chester on forms supplied by
said Department.
D. The well shall be installed and pump tested before any other construction
permits are issued.
E. The builder or property owner of new construction as defined in §
192-1.1 shall be responsible for the quality of the water produced by the individual water supply system until the issuance of a certificate of occupancy. The builder or property owner shall arrange for an initial water test in accordance with the requirements of the Private Well Testing Act, N.J.A.C. 7:9E, including the herein following parameters as soon as the water is available within the dwelling. The sample for this initial test must be raw untreated groundwater that is collected upstream of any treatment system. Prior to signing an application for a certificate of occupancy, the Department of Health of the Township of Chester shall confirm that all parameters listed are in compliance with applicable standards as indicated. Treatment systems installed to correct for parameters which fail the initial test will be required. Retesting for failing parameters after treatment will be required to ensure compliance with the specifically enumerated standards as follows:
|
Substance/Condition
|
Concentration Maximum
|
---|
|
Corrosivity
|
Within plus/minus 1.0 LSI units as defined by the Langelier
Index
|
|
pH
|
Within 6.5 to 8.5 pH units
|
|
Arsenic
|
0.01 mg/L
|
|
Total coliform bacteria
|
0/negative
|
|
Copper
|
1.3 mg/L action level
|
|
Fluoride
|
2.0 mg/L
|
|
Iron
|
0.3 mg/L
|
|
Lead
|
0.015 mg/L action level
|
|
Mercury
|
0.002 mg/L
|
|
Manganese
|
0.05 mg/L
|
|
Nitrates
|
10 mg/L
|
|
Volatile organics
|
MCLs established under the Safe Drinking Water Act, N.J.S.A.
58:12A-1 et seq., and implementing rules, N.J.A.C. 7:10.
|
F. When it is necessary to install a water treatment device or system
to treat the quality of water on any potable water supply system in
the Township of Chester, it shall be the obligation of the owner or
builder of said system to install the appropriate water treatment
device.
G. The builder or owner shall provide the Health Department with the
list of water treatment devices installed on the water supply (if
applicable), and list the reasons for the installation.
H. Wells drilled to service existing dwellings must be sampled in accordance
with the Private Well Testing Act, N.J.A.C. 7:9E, for the following
parameters: pH, arsenic, total coliform bacteria, iron, manganese,
nitrates, volatile organics, copper and lead. Compliance for those
parameters for which there is a primary standard will be required.
The Environmental Protection Agency (EPA)/New Jersey Department
of Environmental Protection (NJDEP) proposed boundaries for the existing
CEA shall include the following block and lot numbers: Block 17, Lots,
2, 3, 4, 5, 6, 7, 7.01, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20,
21, 22, 22.01, 22.02, 22.03, 22.04, 24, 25, 28, 31.01, 33, 41, 42,
43, 44, 44.01, 44.02, 45 and 50, subject to any further amendments
by the EPA/NJDEP, which amendments would thereby add additional lots
to the CEA.
In addition to all other tests required, the dwelling must have
final plumbing approval before obtaining a potable water sample, which
shall be taken from the kitchen sink and analyzed by a laboratory
duly licensed by the NJDEP. A chain of custody and sample results
shall be provided. The sample must comply with the well standards.
All well permits requested in the CEA will require the requisite.
It shall be the responsibility of the homeowner and all subsequent
homeowners to advise prospective purchasers of the property of the
original water test results obtained for the certificate of occupancy.
Additionally, prospective purchasers shall also be advised of the
necessary treatment equipment required to meet appropriate drinking
water standards.
Any person who violates any provision of this chapter shall
be subject to a fine of not more than $500 per day for each violation.
Each day's continued violation shall constitute a separate offense.
A duly authorized representative of the Board of Health may
make inspections during the construction of an individual water supply
system to determine compliance with the terms of the certificate of
compliance, location and design issued therefore. The Board of Health
shall be notified at least 72 hours prior to the commencement of the
construction of any such system.