[R.O. 2009 §5-36; Ord. No. 1002 §3, 11-28-2000; Ord. No. 1161 §§1 — 3, 9-22-2010]
A.
That certain document, being marked and designated as The International Building Code, 2006 Edition, as published by the International Code Council, and as further adopted, amended and revised as provided in this Section, be and is hereby adopted as the Building Code of the City of Cool Valley for the control of buildings and structures as herein provided; providing for the issuance of permits and collection of fees therefore; and each and all of the regulations, provisions, conditions and terms of said Building Code are hereby referenced to, adopted and made a part hereof, as if fully set out in this Section, with the additions, insertions, deletions and changes prescribed in this Section.
B.
Violations — Penalty. Persons who shall violate any provision of the code adopted by this Article, fail to comply with any of the requirements thereof, or erect, install, alter or repair work in violation of the approved construction documents or direction of the applicable Code Official, or of a permit or certificate issued under the provisions of the code adopted by this Article shall be guilty of an ordinance violation, punishable as provided in Section 500.085 of the City of Cool Valley Municipal Code. Each day that a violation continues after due notice has been served shall be deemed a separate offense.
C.
Revisions. The following Sections are hereby revised:
1.
101.1 Title: Insert in the space provided: "the City of Cool Valley, Missouri". Wherever the term "Name of Jurisdiction" or "Local Jurisdiction" appears, it shall be deemed to mean the City of Cool Valley, Missouri.
2.
101.2.1 Appendices: Delete text and add the following: Appendix Sections A, B, C and I shall hereby be adopted as referenced in this Section.
3.
105.1.1 Annual Permit: Delete in entirety.
4.
105.1.2 Annual Permit Records: Delete in entirety.
5.
105.7 Integrated Permits: The building code official may issue integrated building, plumbing, mechanical, electrical and occupancy permits as one unit.
6.
108.4 Work Commencing Before Permit Issuance: Delete in entirety and insert: Any person who commences any work on a building, structure, electrical, gas, mechanical or plumbing system before obtaining the necessary permits shall be subject to a maximum fine of five hundred dollars ($500.00) per day per occurrence continues. This fine shall be in addition to any fees established for the permit sought.
7.
110 Certificate of Occupancy: Delete in entirety.
8.
112.4 Filing Fee: The filing fee for an application to appeal the Board of Appeals shall be two hundred dollars ($200.00).
9.
113.4 Violation Penalties: Delete in entirety.
10.
114.3 Unlawful Continuance: Delete in entirety and insert the following: Any person who shall continue any work after having been served with a stop work order, except such work as that person is directed to perform to remove a violation or unsafe condition, shall be subject to an administrative fine of five hundred dollars ($500.00) per consecutive calendar day, per occurrence as ordered by the Building Commissioner or duly appointed representative of the City of Cool Valley.
D.
Additions. The following Sections are hereby added:
SECTION 116
1.
116.1 Workmanship: Add text: All work shall be executed in a workmanlike and skilled manner so that, for example, floors are level, walls are plumb and square, windows and doors are plumb, square and easily operable, exterior building envelopes are weather-tight and exclude the elements, building materials are undamaged and surfaces are unmarred. Materials and workmanship are subject to inspection by the City. Unless specified elsewhere in this code, all materials shall be installed in accordance with the manufacturer's recommendation.
2.
Table 508.3.3(F) Required Separation: The minimum fire separation between all tenants and occupants shall be one hour. Exception: Incidental use areas shall be separated per Table 508.2.
3.
910.1.1 Smoke and Heat Vents, Where Required: Smoke and heat vents shall be installed in the roofs of all one-story buildings of unlimited area in Type II, III or IV construction and as required in Section 910.2.
4.
910.2.4 Group M or B: Buildings and portions there of used as a Group M or B occupancy. Exception: Buildings that are subdivided to 5,000 square feet or less with walls containing a fire separation of 1 hour or more that are extended to the underside of the roof deck.
5.
1612.3 Establishment of Flood Hazard Areas: Delete in entirety. Insert text: Established flood hazard areas shall be designated per planning and zoning regulations and shall be shown on all site plans submitted for permit.
6.
2901.1 Scope: Delete last sentence and insert: Private sewage and disposal systems shall conform to the laws and ordinances in Chapter 113 — Gravity Sewers, Lift Station Force Mains and S.T.E.P. System and Chapter 117 — General Pretreatment Program Regulating Use of Sewers.
7.
2902.2 (2) Separate Facilities: Delete " 15 or less" and insert "35 or less".
8.
3410.2 Applicability: Insert in the space provided: Effective Date of this Ordinance.
E.
Fees And Charges.
1.
Building permit fees. Building permit fees shall be applied as referenced in the currently adopted Building Code. Permit fees shall be calculated using the estimated construction cost table as published by the International Code Council based upon the estimated cost of construction. Estimated construction costs which exceed the calculated table amount will be charged according to the fee multiplier. The building permit fee multiplier shall be applied at a rate of 0.0039.
2.
Miscellaneous permit fees.
a.
Miscellaneous permit fees shall include permits to alter, repair, demolish, relocate or construct pools, decks, fences, signs, finished basements, room additions, electrical, plumbing or mechanical.
b.
Miscellaneous permit fees will be charged a minimum of thirty-five dollars ($35.00) for the first nine thousand dollars ($9,000.00) worth of work for residential buildings and fifty dollars ($50.00) for commercial buildings. Additional fees will be calculated based upon the estimated cost of construction multiplied by 0.0039.
c.
Exception: Work of a minor nature in residential occupancies such as the replacement of faucets or light fixtures is not required to be permitted or charged a fee in accordance with the adopted Building Code.
3.
Minimum permit fee. The minimum permit fee charged for any Building Department permit shall be thirty-five dollars ($35.00).
4.
Commercial plan review fee. All commercial projects to be reviewed within the City shall require a minimum plan review fee of fifty dollars ($50.00). Projects forwarded to a third party for review will be charged according to Subsection (A) of this Section plus the additional fees from the contracted party. Commercial projects suspended, voided or canceled prior to permit issuance shall be responsible for the minimum permit fee and/or any related charges from a third party for plan review.
5.
Extra inspection fee. Extra inspection fees will be applied at a rate of fifty dollars ($50.00) when a third (3rd) re-inspection is required. Additional inspection fees may also be applied to projects that have been scheduled for inspection but are not ready or are inaccessible for inspection.
6.
Unlawful continuance. Any person who shall continue any work in or about the structure after having been served with a stop work order or a structure posted as uninhabitable, except such work as that person is directed to perform to remove a violation or unsafe condition, shall be subject to penalties as set forth in Section 500.085 of the City of Cool Valley Municipal Code. Each day that a violation continues after due notice has been served shall be deemed a separate offense.