The driveway shall be graded in accordance with §
325-5.1 and a wearing surface applied in accordance with §
325-5.2C(1), unless a lesser thickness is approved by the Planning Board, to a width of at least 15 feet and to the edge of the roadway right-of-way.
For the purpose of protecting the safety, convenience and welfare of the Town's inhabitants; for the provision of adequate access to all of the lots in a subdivision by ways that will be safe and convenient for travel; for reducing the danger to life and limb in the operation of motor vehicles; for securing safety in the case of fire, flood, panic and other emergencies; under the authority of MGL c. 41, § 81M, as amended, the applicant or his successor shall provide for the proper maintenance and repair of improvements under this section or the rules and regulations during the construction and for the period of 18 months after the completion of the construction of said improvements and the release of security or until the Town votes to accept such improvements, whichever comes first [see §
325-3.4N(2)]. Such maintenance shall include snow removal beginning at the time of occupancy of an individual owner or tenant other than the developer.