[HISTORY: Adopted by the Tribal Council of the Nottawaseppi Huron Band of the Potawatomi 3-18-2000 by Ord. No. 03-1800-00 (Title VI, Ch. 2, of the Tribal Code). Amendments noted where applicable.]
A. 
During the construction process, soil is highly vulnerable to erosion by wind and water. Eroded soil endangers water resources by impairing water quality and causing the siltation of aquatic habitat for fish and other desirable species. Eroded soil also necessitates repair of sewers and ditches and the dredging of lakes. In addition, clearing and grading during construction cause the loss of native vegetation necessary for terrestrial and aquatic habitat.
B. 
As a result, the purpose of this tribal regulation is to safeguard persons, protect property, and prevent damage to the environment within areas of Nottawaseppi Huron Band of Potawatomi (NHBP) jurisdiction. This chapter will also promote the public welfare by guiding; regulating, and controlling the design, construction, use, and maintenance of any development or other activity that disturbs or breaks the topsoil or results in the movement of earth on land within areas of Nottawaseppi Huron Band of the Potawatomi jurisdiction.
As used in this chapter, the following terms shall have the meanings indicated:
CERTIFIED CONTRACTOR
A person who has received training and is licensed by the Tribe and/or a federal agency (US Army Corps, EPA, BIA, etc.) to inspect and maintain erosion and sediment control practices.
CLEARING
Any activity that removes the vegetative surface cover.
CRITICAL EROSION AREAS
Includes sites with one or more of the following characteristics: areas with slopes of 30% (10 feet horizontal to three feet vertical) or more. Areas with heavy clay soils (commonly termed hardpan clay) and/or silt and/or soils classified in the hydrological group D in the NRCS of the USDA soil survey.
DRAINAGEWAY
Any channel that conveys surface runoff through or within the site.
EARTH CHANGE
A human-made change in the natural cover or topography of the land, including cut and fill activities, which may result in or contribute to soil erosion or sedimentation of the waters of tribal lands. The term "earth change," as used in this chapter, shall not apply to the practice of plowing and tilling soil for the purpose of crop production.
EROSION AND SEDIMENT CONTROL PLAN
A plan prepared by or under the direction of a licensed professional engineer indicating the specific measures and sequencing to be used to control sediment and erosion on a development site during and after construction.
EROSION CONTROL
A measure that prevents and/or reduces erosion.
GRADING
Excavation or till of material, including the resulting conditions thereof.
PERIMETER CONTROL
A barrier that prevents sediment from leaving a site by filtering sediment-laden runoff or diverting it to a sediment trap or basin.
PHASING
Clearing a parcel of land in distinct phases, with the stabilization of each phase completed before the clearing of the next.
SEDIMENT CONTROL
Measures that prevent or reduce eroded sediment from leaving the site.
SITE
A parcel of land or a contiguous combination thereof, where grading work is performed as a single unified operation.
SITE DEVELOPMENT PERMIT
A permit issued by the municipality for the construction or alteration of ground improvements and structures for the control of erosion, runoff, and grading.
STABILIZATION
The use of practices that prevent exposed soil from eroding.
START OF CONSTRUCTION
The first land-disturbing activity associated with a development, including land preparation such as clearing, grading, and filling; installation of streets and walkways; excavation for basements, footings, piers, or foundations; erection of temporary forms; and installation of accessory buildings such as garages.
STREAM
A river, stream or creek, which has definite banks, a bed, and visible evidence of a continued flow or continued occurrence of water.
VEGETATIVE COVER
Grasses, shrubs, trees, and other vegetation which hold and stabilize soils.
WATERCOURSE
Any body of water, including but not limited to lakes, ponds, wetland, rivers, streams, and bodies of water delineated by Nottawaseppi Huron Band of the Potawatomi.
WATERWAY
A channel that directs surface runoff to a watercourse or to the public storm drain.
WETLAND
Land characterized by the presence of water at a frequency and duration sufficient to support, and that under normal circumstances does support, wetland vegetation or aquatic life, and is commonly referred to as a bog, swamp, or marsh. A wetland will contain a predominance, not just an occurrence, of wetland vegetation, hydrology, or hydric soil.
A. 
A permit shall be required for any earth change activities that disturb and/or uncover 25,000 or more square feet or disturb and/or uncover any critical erosion areas or are within 500 feet of a watercourse.
B. 
Exemptions.
(1) 
No site development permit is required for the following activities:
(a) 
Any emergency activity that is immediately necessary for the protection of life, property, or natural resources.
(b) 
Existing nursery and agricultural operations conducted as a permitted main or accessory use.
(c) 
Any earth change that disturbs and/or uncovers less than 25,000 square feet.
(2) 
Activities not requiring permits are still required to implement soil erosion and sediment control measures.
C. 
Application submittal.
(1) 
All permit applications shall be submitted to the NHBP Environmental Department.
(2) 
Each application shall bear the name(s) and address(es) of the owner and developer of the site, and of any consulting firm retained by the applicant, together with the name of the applicant's principal contact at such firm, location and size of the earth change, description of the earth change, project starting and ending dates and shall be accompanied by appropriate filing fee [see Subsection C(3) of this section]. Additionally the application must be accompanied by a soil erosion and sedimentation control plan and that a certified contractor shall be on site on all days when construction or grading activity takes place.
(3) 
Application fees.
(a) 
Permits for earth changes disturbing and/or uncovering less than 50,000 square feet shall be accompanied by an application fee of $50.
(b) 
Permits for earth changes disturbing and/or uncovering 50,000 square feet to 100,000 square feet shall be accompanied by an application fee of $100.
(c) 
Permits for earth changes disturbing and/or uncovering more than 100,000 square feet shall be accompanied by an application fee of $250.
(4) 
Application for a permit shall be made forty-five (45) days prior to the start of any earth change. No earth change, clearing, grading or construction of access roads and/or driveways may commence prior to the issuance of a permit. Permit approval shall be given prior to the initiation of any work activity. Any unauthorized work shall be considered a violation of these procedures regardless of any later actions toward compliance. Soil test borings, vegetative cutting for land surveys, percolation tests and normal maintenance shall not be considered a start of work under these regulations.
A. 
The erosion and sediment control plan shall include the following:
(1) 
A natural resources map identifying soils, land use cover, elevation contours, slope, drainage patterns, and resources protected under other chapters of this Code. The map, at a minimum, shall have slopes of the site grouped into ranges of steepness and marked on the map. The map should have a scale no smaller than one inch equals 100 feet.
(2) 
A sequence of construction of the development site, including stripping and clearing; rough grading; construction of utilities, infrastructure, and buildings; and final grading, stabilization and landscaping. Sequencing shall identify the expected date on which clearing will begin, the estimated duration of exposure of cleared areas, areas of clearing, installation of temporary erosion and sediment control measures, and establishment of permanent vegetation.
(3) 
All erosion and sediment control measures necessary to meet the objectives of the local regulation throughout all phases of construction and after completion of development of the site. Depending upon the complexity of the project, the drafting of intermediate plans may be required at the close of each season.
(4) 
A distinction between temporary control measures and permanent control measures.
(5) 
Seeding mixtures and rates, types of sod, method of seedbed preparation, expected seeding dates, type and rate of lime and fertilizer application, and kind and quantity of mulching for both temporary and permanent vegetative control measures.
(6) 
Provisions for maintenance of control facilities, including easements and estimates of the cost of maintenance.
B. 
Modifications to the plan shall be processed and approved or disapproved in the same manner as § 6.2-5 of this chapter, may be authorized by NHBP Environmental Department by written authorization to the permittee, and shall include:
(1) 
Major amendments of the erosion and sediment control plan submitted to NHBP Environmental Department.
(2) 
Field modifications of a minor nature.
A. 
NHBP Environmental Department will review each application for a site development permit to determine its conformance with the provisions of this regulation. Within thirty (30) days after receiving a complete application, NHBP Environmental Department shall, in writing:
(1) 
Approve the permit application; or
(2) 
Approve the permit application subject to such reasonable conditions as may be necessary to secure substantially the objectives of this regulation, and issue the permit subject to these conditions; or
(3) 
Disapprove the permit application, indicating the reason(s) and procedure for submitting a revised application and/or submission.
B. 
Failure of the NHBP Environmental Department to act on an original or revised application within thirty (30) days of receipt shall authorize the applicant to proceed in accordance with the plans as filed unless such time is extended by agreement between the applicant and NHBP Environmental Department. Pending preparation and approval of a revised plan, development activities shall be allowed to proceed in accordance with conditions established by NHBP Environmental Department.
A. 
NHBP Environmental Department designated agent shall make inspections as hereinafter required and either shall approve that portion of the work completed or shall notify the permittee wherein the work fails to comply with the erosion and sediment control plan as approved. Plans for grading, stripping, excavating, and filling work bearing the stamp of approval of the NHBP Environmental Department shall be maintained at the site during the progress of the work. To obtain inspections, the permittee shall notify NHBP Environmental Department at least two (2) working days before the following:
(1) 
Start of construction.
(2) 
Installation of sediment and erosion measures.
(3) 
Completion of site clearing.
(4) 
Completion of rough grading.
(5) 
Completion of final grading.
(6) 
Close of the construction season.
(7) 
Completion of final landscaping.
B. 
The permittee or his/her agent shall make regular inspections of all control measures in accordance with the inspection schedule outlined in the approved erosion and sediment control plan(s). The purpose of such inspections will be to determine the overall effectiveness of the control plan and the need for additional control measures. All inspections shall be documented in written form and submitted to NHBP Environmental Department at the time interval specified in the approved permit.
C. 
NHBP Environmental Department or its designated agent shall enter the property of the applicant as deemed necessary to make regular inspections to ensure the validity of the reports filed under Subsection B.
A. 
Stop-work order; revocation of permit. In the event that any person holding a site development permit pursuant to this chapter violates the terms of the permit or implements site development in such a manner as to materially adversely affect the health, welfare, or safety of persons residing or working in the neighborhood or development site so as to be materially detrimental to the public welfare or injurious to property or improvements in the neighborhood, NHBP Environmental Department may suspend or revoke the site development permit.
B. 
Violation and penalties. No person shall construct, enlarge, alter, repair, or maintain any grading, excavation, or fill, or cause the same to be done, contrary to or in violation of any terms of this chapter. Any person violating any of the provisions of this chapter shall be deemed guilty of a misdemeanor, and each day during which any violation of any of the provisions of this chapter is committed, continued, or permitted shall constitute a separate offense. Upon conviction of any such violation, such person, partnership, or corporation shall be punished by a fine deemed appropriate by the Tribal Council and/or Tribal Court and not exceed more than $1,000. In addition to any other penalty authorized by this section, any person, partnership, or corporation convicted of violating any of the provisions of this chapter shall be required to bear the expense of such restoration.
C. 
Emergency action. If necessary to protect public safety or a watercourse, the NHBP Environmental Department empowered by the Tribal Council to act may initiate emergency action to abate imminent and substantial danger and risk. The land holder/property owner will be held responsible for reimbursing the Nottawaseppi Huron Band of the Potawatomi for all cost incurred as a result of the emergency action taken, provided that a finding is made that the land holder/property owner violated provisions of this chapter.
The provisions and sections of this chapter shall be deemed to be separable, and the invalidity of any portion of this chapter shall not affect the validity of the remainder.
This chapter shall take effect when approved by the Tribal Council.