For all subdivisions and land development, the applicant shall
provide a financial guarantee to the Township for the timely installation
and proper construction of all erosion and sediment control measures
and stormwater management facilities/BMPs as required by the approved
drainage plan and by this chapter equal to the full construction cost
of the required controls plus construction contingency and construction
inspection costs.