[Amended 7-3-1990 by L.L. No. 2-1990; 1-16-2011 by L.L. No.
1-2011]
For the purpose of promoting the health, safety, morals and
the general welfare of the community, the Village of Camillus is hereby
divided into the following zoning districts:
Residential 1 (R-1)
|
Residential 2 (R-2)
|
Residential 3 (R-3)
|
Residential 4 (R-4)
|
Commercial (C)
|
Planned Development District (PDD)
|
Village Center Zoning Overlay District (VCOD)
|
A. FHA flood hazard areas (overlay district). In addition to the foregoing,
the Village Board of Trustees may from time to time, in accordance
with the procedures applicable to district reclassifications, designate
certain land areas as "flood hazard areas." Such designations shall
constitute an overlay district, and land areas so designated shall
be subject to the district regulations which are applicable to the
districts upon which the flood hazard area is superimposed in addition
to the regulations applicable to flood hazard areas as provided for
herein.
B. Regulations for planned development district.
(1) Intent.
(a)
The planned development district (PDD) allows for a variety
of land uses and a flexible arrangement of lots, structures and land
uses in a well-planned and coordinated design. The flexibility of
land uses and lots is achieved by the Village continuously participating
in and approving stages of project planning and development. Any combination
of land uses already permitted within the Village may be proposed
for development on sites under this district. This district is also
intended to accommodate land uses or scales of development that may
be unique or require more consideration by the Village. This district
may be applied anywhere in the Village, provided the project scale
and design is found to further Village planning goals and to be compatible
and coordinated with the environmental constraints and the existing
and/or planned availability of public water, sewer, drainage and transportation
facilities. In considering a PDD application and/or plan, the Village
Board, in applying the standards hereunder and any recommendations
thereto, shall consider and may also incorporate such planning concepts
and design and architectural guidelines as are detailed in the Onondaga
County Settlement Plan of 2001 prepared by Duany Plater - Zyberk &
Company, Architects and Town Planners, and Environmental Design and
Research, Local Planners, for the Syracuse - Onondaga County Planning
Agency, and as same may be revised from time to time.
(b)
Substantively and procedurally, the PDD is intended to promote
and maintain a dialogue between the applicant and the Village. The
PDD enables both the applicant and the Village to customize the development
of a site in ways that are not feasible in conventional zone districts.
The development standards are not predetermined but are created jointly
by the applicant and the Village via the procedures set forth in this
article.
(c)
In particular, but not by way of limitation to certain area(s)
within the Village, it is intended that a planned development district
concept may be utilized for redevelopment of the premises situate
on the former Camillus Cutlery manufacturing site.
(2) Procedure review. The classification of any property within the PDD
requires the undertaking of a three-step process.
[Amended 8-11-2011 by L.L. No. 3-2011]
(a)
In the first step, Concept Plan Review, the Village Board, in
its legislative capacity, establishes the boundaries of the proposed
PDD and sets the limits on the nature and range of uses, geometric
and site controls and overall project planning. The Village Board's
action is in response to the applicant's submission of a general outline
that sets forth the contemplated development for the proposed PDD.
This step begins a dialogue between the applicant and the Village,
and it does not commit the Village Board to adopt a PDD zone change
in the final step of this process.
(b)
In the second step, Project Plan Review, the Village Board ensures
that the general concept outline will be properly implemented, by
reviewing and approving the project plan submitted by the applicant.
The project plan is the detailed narrative and graphic documentation
for development of the entire PDD.
(c)
The final step, Implementation and Enforcement, is through a
formal zone change by the Village Board and site plan and/or subdivision
reviews of individual sites or portions of the PDD that ensure the
actual construction and development fully implement the concept and
project plans adopted in the formation of the PDD.
(3) Authorization for a PDD.
(a)
Type of action. Establishment of a PDD is a zone change to the
Zoning Map made by the Village Board, pursuant to the requirements
of the New York State Village Law, governing the formation and modification
of zone districts, the local requirements of the Village of Camillus
and the procedures of this article.
(b)
Application to specific lands.
[1]
The PDD regulations are applied and effective to only a specific
area that may include more than one property. The Zoning Map is amended
upon adoption of an approval resolution by the Village Board of a
PDD project plan, pursuant to the requirements of this article. No
permits or other approvals are issued until the zone change has been
approved by the Village Board, as stipulated in PDD adoption (Step
3).
[2]
Land uses permitted.
[a] Generally. The Village Board shall specify the
land uses permitted within the PDD when the concept plan for such
district is accepted and may identify specific uses for lots or subareas
within the PDD. The Village Board may establish the unit densities
and other dimensional and performance standards for all uses. If the
Village Board chooses not to establish such standards, then the provisions
of PDD default dimensional and performance standards of this article
shall apply.
[b] Preassigned land uses. The PDD shall also be used
to address uses which, due to their size or character, have potentially
significant impacts and require maximum review of location, scale
and design. The following uses shall be permitted only in a PDD upon
specific approval of the Village Board:
[i] Public or private airport.
[iii] Resort complex/conference center.
[3] Minimum PDD area.
[a] Minimum area. No PDD shall have a gross land area
of less than three acres, exclusive of existing public rights-of-way,
unless otherwise specified by the Village Board.
[Amended 11-16-2015 by L.L. No. 3-2015]
[b] Adding area. Once established, a PDD may be enlarged
to include other contiguous areas regardless of their size. Such areas,
if separated by a public right-of-way, may be considered contiguous
if, in the opinion of the Village Board, the continuity of the original
PDD is maintained or enhanced.
(c)
Phased development.
[1]
PDD subareas. The Village Board may identify portions of a PDD
as discrete geographic subareas of the project. Such designated subareas
(sections or phases) may have land uses or standards different from
the balance of the PDD, provided that such designated subareas are
fully integrated in the overall development for the entire PDD.
[2]
Project staging. The Village Board may establish the sequence
in which development of a PDD shall proceed by specifying the order
in which subareas, sections or phases of a PDD are to be developed.
[Amended 8-11-2011 by L.L. No. 3-2011]
[3]
Review of project phases. If a proposed PDD is to be undertaken
in a staged development, the first phase shall consist of a minimum
of 25% of the total PDD area.
[Amended 8-11-2011 by L.L. No. 3-2011]
(4) PDD concept plan review (Step 1).
(a)
Procedure.
[1]
Receipt and referral. An applicant wishing to propose a PDD
shall prepare and submit documents (see Concept Plan Submissions)
to the Village Board. Upon receipt of a PDD proposal, the Village
Board can accept or refuse to consider the proposal for further action.
[Amended 8-11-2011 by L.L. No. 3-2011]
[2]
SEQRA. The Village Board shall declare itself lead agency for
purposes of the New York State Environmental Quality Review Act and
shall determine if the proposed PDD is a Type I or Unlisted Action
and make the appropriate notification or referrals to the applicable
municipalities, involved or interested agencies or other levels of
government.
[3]
Review and discussion. Prior to any informational or public
hearing, the Village Board may meet with the applicant or other interested
parties to discuss the PDD proposal.
[Amended 8-11-2011 by L.L. No. 3-2011]
[4]
Informational hearings. The Village Board may hold an informational
hearing; after which, and upon the consideration of recommendations
by other agencies, it may proceed to act on the proposed PDD concept
plan.
[Amended 8-11-2011 by L.L. No. 3-2011]
[5]
Concept plan acceptance. The Village Board shall consider the
proposal and vote to accept, modify or reject the PDD concept. If
the Village Board accepts or modifies the PDD concept, it shall prepare
a written resolution indicating its findings and its willingness to
entertain a zone change upon completion of a PDD project plan. The
resolution shall include a copy of the accepted written and graphic
PDD concept plans, any SEQRA-related materials, and other relevant
information.
[Amended 8-11-2011 by L.L. No. 3-2011]
[6]
Concept plan acceptance date. The date of the Village Board
acceptance only initiates the second review phase of the PDD procedures.
Upon concept plan acceptance, the PDD is not in effect and the applicant
does not obtain vested rights for development.
(b)
Concept plan review criteria. The Village Board must find that
approval of a PDD concept is reasonable and appropriate in furthering
the overall land development policies and goals of the Village. In
making this determination, the Village Board shall consider and record
in its resolution of acceptance how the proposed PDD addresses the
following:
[Amended 11-16-2015 by L.L. No. 3-2015]
[1]
Comprehensive planning activities of the Village of Camillus.
[2]
Applicable infrastructure plans and policies.
[3]
Applicable environmental policies and programs.
[4]
Responds to conditions or issues not previously addressed by
the Village of Camillus.
(c)
Concept plan submission requirements. In order to obtain the
conceptual approval of the Village Board for the establishment of
a planned development district, a concept plan of the proposal shall
be submitted, comprised of the following components:
[1]
Narrative component. A brief written narrative outlining the
applicant's overall concept for the proposed PDD, including, but not
limited to, the following:
[a] An explanation of how the proposed PDD conforms
to concept plan review criteria.
[b] The range and mix of land uses.
[e] Impact upon existing and provision for public facilities.
[h] Open space/recreation areas.
[k] All other application items.
[2]
Graphic component. A generalized graphic plan of the entire
site, drawn to a scale that reasonably depicts the land use, development
patterns, density and improvements addressed in the applicant's narrative
statement.
[3]
Project schedule. An outline of the expected sequence and duration
to fully implement and construct the entire PDD.
[4]
SEQRA. The long environmental assessment form (LEAF), as determined
by the Village, in accordance with the New York State Environmental
Quality Review Act (SEQRA).
[5]
Survey. Survey(s) or Tax Maps of the property or properties
for inclusion in the PDD as part of the graphic component.
[6]
Zone change application forms. Forms, as required by the Village
of Camillus, available from the Village Clerk's office.
(5) PDD project plan review (Step 2). In the second step, Project Plan
Review, the Village Board, or a subcommittee thereof delegated by
the Village Board, shall act as the Planning Committee of the Village
Board, which Committee shall be responsible for ensuring that the
general concept outline approved by the Village Board will be properly
implemented. The Planning Committee achieves compliance by reviewing
and approving the project plan submitted by the applicant. The project
plan is the detailed narrative and graphic documentation for the development
of the entire PDD. This step begins with the following actions of
the Planning Committee and concludes with a recommendation to the
Village Board.
[Amended 8-11-2011 by L.L. No. 3-2011; 11-16-2015 by L.L. No. 3-2015]
(a)
Project plan review procedures.
[1]
Transfer to the Planning Committee. Upon acceptance of a PDD
concept plan by the Village Board, the Planning Committee shall begin,
with the applicant, the development of a PDD project plan.
[2]
Submittals. The project plan is a substantial elaboration of
the concept plan accepted by the Village Board. It is a significantly
more detailed narrative and graphic documentation for the development
of the entire land area or of designated subareas within the PDD (see
submission requirements). The applicant shall prepare and submit project
plan materials to the Planning Committee. The applicant may submit
materials immediately following PDD concept plan acceptance by the
Village Board. All materials shall be prepared and completed to the
satisfaction of the Planning Committee.
[3]
Review schedule. Unless otherwise specified by the Village Board,
the project plan shall be acted upon by the Planning Committee within
180 days of the approval date of the PDD concept plan by the Village
Board. Any time within this period, the Planning Committee or the
applicant may request or recommend to the Village Board a modification
of this schedule. Failure to obtain project plan acceptance within
the required time limits shall cause the concept plan authorization
to lapse.
[4]
SEQRA. A thorough analysis of environmental issues shall commence
during this stage of the PDD review process under the authority of
the Village Board.
[5]
Analysis, review, discussion and referrals. During its review,
the Planning Committee shall engage in a substantive review of the
project plan. It may meet with the applicant, governmental agencies
or other interested parties to improve its understanding of the proposal.
The Planning Committee may refer the proposed project plan to appropriate
governmental agencies for any advisory opinion or recommendation.
The Planning Committee shall direct the preparation of a written report
of the Committee's interim analysis, findings and progress.
[6]
Informational hearings. The Village Board of Trustees may hold
informational hearings for fact-finding and to gather community input.
[7]
PDD project plan review completion. The Planning Committee shall, when it concludes its analysis and review {Subsection
B(5)(a)[1] through
[6] above}, vote to recommend that the Village Board accept, accept with modifications or reject the PDD project plan. It shall base its recommendation upon finding that the proposed project plan is in accordance with the approved concept plan, the Village Subdivision Regulations, and all other applicable codes and regulations of Onondaga County and New York State.
[8]
Planning Committee recommendation. The Planning Committee shall,
if it finds that all materials and information are acceptable, direct
the preparation of a written report to the Village Board containing
its findings and recommendations. The report shall include, if appropriate,
the accepted written and graphic PDD project plans, a PDD construction
and development schedule, recommended methods of implementation following
final PDD adoption, a draft DEIS or recommended SEQRA findings, and
any other relevant materials.
(b)
Project plan review criteria. The Village Board of Trustees
shall determine that approval of a PDD project plan is reasonable
and appropriate in meeting the objectives of the accepted concept
plan and that the project plan furthers the overall land development
policies and goals of the Village. In making this determination, the
Board shall apply its collective experience and judgment to evaluate
the appropriateness of the development proposed in the project plan.
It shall consider how the proposed PDD addresses the following:
[1]
Uses and structures. The variety and arrangement of land uses
and structures throughout the proposed development are appropriate
for the site.
[2]
Dimensional standards. It shall evaluate the project plan with
respect to the minimum area and geometric controls and other standards
set forth by the Village Board or the default standards of this section
if not specifically modified by the Village Board. It shall evaluate
the appropriateness of the proposed density of development and other
factors it finds relevant, such as location, community needs, public
infrastructure and relationship to surrounding developments.
[3]
Subdivision review. In anticipation of PDD acceptance and potential
subdivision action, the Board may simultaneously review any proposed
subdivision sketch plans to determine conformance to Village Subdivision
Regulations.
[4]
Other zoning reviews. The Board of Trustees shall specify recommended
zoning review processes and permits that will control and monitor
the implementation of the PDD.
[5]
Feasibility of completing the PDD. The Board shall evaluate
and comment whether the proposed sequence, staging and expected schedule
for implementing the PDD can be achieved in the manner described.
It shall seek to identify any public infrastructure or improvements
that are related to or contingent upon the successful completion of
the proposed PDD and set forth a preliminary schedule of PDD milestones
that are to be achieved after adoption.
(c)
Project plan submission requirements.
[1]
Project plan submissions. The project plan of the entire site
must include a completed site plan review and zoning amendment application
package to include, without limitation, such graphic documentation,
maps, drawings and other materials that show at a sufficient scale
and detail to allow the Board of Trustees to evaluate the feasibility
and impacts of the proposed development.
[a] Site plans for all construction areas preliminarily
showing approximate size, height and bulk of buildable areas.
[b] Preliminary landscaping plans showing all open
space, plazas, malls, courts and pedestrianways, ponds, waterways
or similar landscaped features.
[c] Preliminary grading plans showing existing and
topographic contours and any significant natural or sensitive environmental
resources.
[d] Improvement plans showing proposed drainage, water
and sewer facilities, and easements, if any, within or affected by
the proposed development.
[e] Vehicular and pedestrian circulation plans showing
proposed streets, points of access, sidewalks and off-street parking
and loading to serve any proposed building or facilities.
[f] Proposed construction schedule, sequence of development,
project financing and preliminary milestones to be achieved from time
of adoption to completion.
[g] Preliminary contract and filing documents between
the applicant and Village for any public facilities, districts, enforcement
and management of the PDD.
[2]
Supporting and explanatory material. The Board may require the
submission of additional material to explain and justify the project
plan, which could include but is not limited the following:
[a] Information necessary to assure compatibility of
the proposed project with adjoining existing uses and to Village planning
objectives.
[b] An explanation of the manner in which all requirements
of the project plan and of other applicable regulations are to be
met.
[c] Expected treatments or project-wide strategies
for issues such as signs, lighting, snow storage, building and site
aesthetics.
[d] Impact and relationship to existing or proposed
services, such as public infrastructure; solid waste collection; emergency
vehicle, police and fire protection.
(6) PDD adoption (Step 3). The final step, implementation and enforcement,
are through a formal zone change by the Village Board and site plan
and/or subdivision reviews of individual sites or portions of the
PDD that ensure the actual construction and development fully implement
the concept and project plans adopted in the formation of the PDD.
[Amended 8-11-2011 by L.L. No. 3-2011]
(a)
PDD adoption procedures. A PDD takes effect only upon the Village
Board's approval or approval with modifications of a zone change incorporating
the PDD project plan and according to the PDD criteria for adoption
and submission requirements.
[1]
The Village Board may proceed to considering a zone change for
the proposal.
[2]
Hearings, referrals and SEQRA. The Village Board shall, pursuant
to law and this chapter, conduct public hearing(s), make all required
referrals not previously completed, and finalize the SEQRA process.
[3]
Project plan action. The Village Board shall approve, approve
with modification or disapprove the PDD project plan. The Village
Board resolution shall explicitly state that the proposed dimensional
controls are accepted or the default dimensional and performance standards
apply. It shall also explicitly state the accepted staging and schedule
to implement and construct the proposed PDD.
[4]
Zone change action. Upon project plan adoption, the Village
Board shall vote to grant the zone change and file this action pursuant
to local and state requirements.
[5]
Filing of approvals. The PDD shall be effective upon proper
execution and filing of all documents, contracts and plans as a supplement
to the Zoning Map.
(b)
PDD criteria for final adoption.
[1]
The Village Board shall confirm or modify and restate its findings
of Village goals addressed in the concept plan (Step 1) acceptance
above.
[2]
The Village Board shall confirm that the PDD project plan (Step
2) fulfills the expectations established in the concept plan accepted
or as subsequently modified.
(c)
PDD adoption submission requirements.
[2]
Reports, referrals and recommendations. Any documents developed
or received during project plan review.
[3]
Survey(s) and legal descriptions of properties included in the
entire PDD.
[4]
SEQRA documentation, DEIS and preliminary draft findings (if
prepared).
[5]
Final drafts of all contracts, filing documents and plans and
enforcement instructions.
(7) Implementing the PDD. This section identifies processes that are
anticipated to be necessary following Village Board approving action
on the PDD and, depending on the specifics of the proposal, to allow
for actual construction and occupancy of a PDD proposal. These processes
will address development of PDD project details and potential project
changes that are fully consistent with the approved project plan.
These other permits and approvals may be obtained by the applicant
pursuant to the requirements of those individual processes and/or
the requirements specified in the resolution adopting the PDD.
(a)
Village permits.
[1]
Construction compliance. Any use or structure, open space, infrastructure
improvement shall be established pursuant to the standards set forth
in the adoption of the PDD.
[Amended 11-16-2015 by L.L. No. 3-2015]
[2]
Site plan and special permit. Subject to the instructions of
the Village Board in its final resolution of PDD adoption, the standards,
procedures and submission requirements of a site plan and/or special
permit are to be applied for those individual uses, structures or
improvements.
[3]
Subdivision review. The standards and procedures of the Village
Subdivision Regulations.
[4]
All other Village permits. Building, highway access and similar
permits are required to be obtained pursuant to their respective permit
requirements.
(b)
Other permits. All other agency permits required from federal,
state or county regulations shall be obtained prior to on-site development
activity.
(c)
Failure to implement the PDD. The Village Board may consider,
after notification to the developer-applicant, rezoning actions to
alternative zone districts if the PDD construction of the entire project
or of specified phases is not completed or if adopted PDD milestones
are not achieved within 18 months of the approved PDD project schedule.
(8) Modifications and amendments to an existing PDD. This subsection
describes how changes are addressed after a PDD has been adopted,
constructed and/or occupied. All changes to an existing PDD will be
regulated by the following provisions: changes that will affect individual
lots that have been subsequently established after the PDD adoption
will require approval by the ZBA; changes that are directed to the
entire PDD or to an identified stage of the PDD will require review
by the Village Board.
[Amended 8-11-2011 by L.L. No. 3-2011]
(a)
Minor modifications affecting one property. The Village Board
shall evaluate all modifications and may either refer the proposal
for consideration of a variance by the ZBA or approve minor modifications
for development within the PDD pursuant to the following:
[1]
Thresholds.
[a] The proposed change is applicable to one property
within the PDD.
[b] The proposed change complies with the land use,
dimensional and performance standards.
[c] There is no change in the defined land use.
[d] The basic physical relationship and function of
buildings and improvements is maintained.
[2]
Criteria. The Village Board can find that the proposed modification
does not require any modification of applicable standards, substantially
alter the property from the approved plan and does not change the
relationship to surrounding properties or improvements.
[3]
Procedure. The Village Board shall process and document the
approval of such modifications in a manner consistent with the general
procedural and enforcement provisions of this chapter. The Village
Board may issue a building permit, certificate of compliance or similar
approvals (e.g., minor subdivision or site plan adjustments) when
authorized by this chapter.
[4]
Waivers of PDD standards. The Village Board finds that the change
for a proposed development, improvement or modification fails to comply
with the land use, dimensional or performance standards adopted for
the specific PDD and shall be subject to the procedures and standards
for issuance of a use or area variance by the Zoning Board of Appeals.
(b)
Intermediate modifications; project plan amendment. Existing
or approved PDD land uses, structures and improvements may be altered
or modified after the effective date of PDD adoption. Unless otherwise
required by the Village Board, such modifications shall be subject
to the issuance of a project plan amendment by the Board, pursuant
to the following:
[1]
Thresholds.
[a] There are changes in type or location of approved
land uses within the same general land use category (e.g., residential,
commercial, industrial) and within the same PDD section identified
in the approved project plan.
[b] Increase in floor are in excess of 10% of a principal
or accessory structure.
[c] Demolition of a principal structure, except where
mandated by an appropriate official in the interest of public safety.
[d] Establishment or realignment of new streets or
other public/common areas.
[e] Any change, except routine replacement and maintenance,
to landscaping, open space, parking, public facilities or other improvements
addressed in the project plan.
[2]
Criteria. The Village Board shall find that the proposed modification
does not substantially alter any modification of applicable standards,
maintains the basic relationship of the property to the approved project
plan and maintains the basic relationship to surrounding properties
or improvements.
[3]
Procedure. The Village Board shall review and consider a project
plan amendment under procedures set forth in this section for adoption
of a project plan (Step 2).
[4]
The Village Board may, at any time, find that the proposed modification
substantially alters the project plan and require the requested modification
to be submitted for a PDD major amendment.
(c)
Major modifications. Any modification not addressed by the minor
or intermediate modifications above, exceeding the limits established
at the inception of the district or expanding or altering the PDD
boundary, shall be reviewed and approved by the Village Board, subject
to the procedures for establishing a PDD (Steps 1, 2 and 3).
(d)
Nonconformities. It is the intent of the PDD that no nonconforming
elements will exist within the PDD. The flexibility of the land use
and geometric controls and review procedures should prevent the creation
of any nonconforming element. In the event that a nonconformity does
exist, any subsequent changes shall conform to the PDD controls and
shall be subject to an issuance of a project plan amendment by the
Village Board [see Subsection H(2), Intermediate modifications].
(9) PDD default dimensional and performance standards. The following
standards are intended to assist the Village by avoiding any enforcement
oversight or ambiguity. A PDD is intended to promote flexibility and
creativity of design; therefore, the following will apply in the absence
of specifically established standards by the Village Board. Unless
the Village Board establishes other controls or standards at the inception
of the district, the following shall apply uniformly, by default,
to entire PDD or to designated portions.
(a)
Land uses. There are no default land uses in a PDD.
(b)
Dimensional controls. The following controls shall apply, unless
specifically modified by the Village Board during the initial establishment
of the PDD:
[1]
Distance between buildings on one lot.
[a] Residential. Front, rear and side yards for residential
uses shall be designed so that a building is no closer than 20 feet
to any other residential building and 50 feet to any nonresidential
building.
[b] Nonresidential. Front, rear and side yards for
nonresidential uses shall be designed so that a building is no closer
than 30 feet to any other nonresidential building and 50 feet to any
residential building.
[c] For purposes of interpretation, a structure which contains both residential and nonresidential uses shall comply with the requirements of Subsection
B(8)(a)[2] above.
[d] Accessory structures shall be no closer than 10
feet to the principal structure with which they are associated and
no closer than 20 feet to any other principal structure, and five
feet to any other accessory structure.
[2]
Distance from lot lines. The minimum distance between any point
on a principal building and the lot line shall not be less than 10
feet.
[3]
Density of development. Unless the Village Board has otherwise
established a minimum density, all residential development shall provide
an average density of 5,000 square feet per dwelling unit. Commercial
and industrial uses shall maintain an average minimum density of 20,000
square feet per building.
[4]
Lot coverage. Maximum lot coverage for all development within
a PDD shall not exceed 35% of the gross land area.
[5]
Height. The maximum height of all principal structures shall
not exceed 35 feet for residential buildings and 40 feet for commercial
or industrial buildings, and accessory structures shall not exceed
15 feet.
[6]
Parking/loading. The parking and loading provisions of this
chapter shall apply to PDDs unless modified by the Village Board.
Shared parking and storage may be included in the calculation of overall
parking compliance.
[7]
Supplementary regulations and site plan standards. Unless modified
by the Village Board when establishing the PDD, the supplementary
regulations and site plan standards of this chapter shall apply to
all development within the PDD.
(c)
Performance standards. Unless modified by the Village Board
when establishing the PDD, the performance standards applicable to
all industrial districts shall apply.
The location of each district shall be indicated on the atlas.
When uncertainty exists with respect to the boundaries of any
district as shown on the atlas, the following rules shall apply:
A. Where a district boundary is indicated as approximately following
the center line of a street, highway, street line or highway right-of-way
line, such center line, street line or highway right-of-way line shall
be construed to be such boundary.
B. Where a district boundary is so indicated that it approximately follows
a lot line, such lot line shall be construed to be said boundary.
C. Where a district boundary is so indicated that it is approximately
parallel to the center line of a street, highway, street line or highway
right-of-way line, such district boundary shall be construed as being
parallel thereto and at such distance therefrom as indicated on the
atlas. If no distance is given, such dimension shall be determined
by the use of the scale shown on said atlas.
D. Where a district boundary is indicated as approximately following
the center line or right-of-way of a creek, canal, river, stream or
similar tributary of water, such center line or right-of-way line
shall be construed to be said boundary.
E. Where a district boundary is indicated as approximately following
the corporate boundaries of the Village of Camillus, such corporate
boundaries shall be construed to be coincidental with such district
boundary.
All areas hereinafter annexed to the Village of Camillus shall
automatically be classified as R-1, absent contrary action by the
Village Board of Trustees.
Any determination by the Building Official regarding the interpretation or application of this chapter, including the precise location of district boundary lines, shall be subject to review by the Board of Appeals de novo, pursuant to its general authority under Article