1.
|
The location of land-clearing, stockpiling and development activities;
erosion control measures to prevent the sedimentation of water bodies
and off-site discharge of sediment;
| |
2.
|
Waste control measures to prevent wastes from contacting stormwater
runoff;
| |
3.
|
Details of a planned program of inspection and maintenance to
ensure proper operation of stormwater management measures; and
| |
4.
|
Additional stormwater management measures as directed by the
DPW.
|
1.
|
Name, address and telephone number of the owner and person responsible
for implementation of the plan and for proper inspection and maintenance
of erosion and sedimentation controls;
| |
2.
|
Plans prepared by a MA registered professional engineer or professional
land surveyor depicting property lines, existing and proposed ground
conditions and topography using no greater than two-foot increments,
boundaries of wetlands and natural or artificial water storage or
conveyance structures, one-hundred-year flood elevations and location
of all existing and proposed buildings, utilities, easements and impervious
surfaces;
| |
3.
|
A narrative description of proposed erosion control measures
and sedimentation control measures;
| |
4.
|
Location and design details of erosion and sediment control
measures proposed to prevent off-site sediment transport during construction;
| |
5.
|
A locus map showing the site in relationship to the surrounding
area's watercourses, water bodies and other significant geographic
features, and roads and other significant structures;
| |
6.
|
A plan showing the extent of clearing, construction equipment
access and storage areas, and material laydown, temporary storage
of construction debris and soil stockpile areas;
| |
7.
|
A construction schedule, including estimated dates for initiation
and completion for such tasks as clearing and grading, construction
of utilities and infrastructure, construction of buildings, and final
grading and landscaping;
| |
8.
|
A written program of documented inspections of stormwater management
systems and a corrective action program for identified deficiencies;
| |
9.
|
A stormwater management plan prepared by a MA registered professional
engineer that demonstrates compliance with the Massachusetts Stormwater
Management Standards;
| |
10.
|
A statement as to applicability under the Massachusetts Natural
Heritage and Endangered Species Program pursuant to the Massachusetts
Endangered Species Act (MGL c. 131A), if applicable.
| |
Within 30 calendar days after receiving a complete application,
the DPW shall, in writing:
| ||
1.
|
Approve the plans as submitted and issue a stormwater management
permit;
| |
2.
|
Approve the plans subject to such reasonable conditions as may
be necessary to secure substantially the objectives of this section,
and issue a stormwater management permit subject to these conditions;
| |
3.
|
Disapprove the plans, specifying the reason(s) and procedure
for submitting a revised application and/or submission; or
| |
4.
|
Request additional information or data.
| |
Failure of the DPW to act on an original or revised plan within
30 calendar days of receipt shall authorize the applicant to proceed
in accordance with the plan as filed unless such time is extended
by agreement between the applicant and the DPW.
|