[HISTORY: Adopted by the Village Board of the Village of Trempealeau at time of adoption of Code (see Ch. 1, General Provisions, Art. II). Amendments noted where applicable.]
GENERAL REFERENCES
Erosion control — See Ch. 259.
Floodplain zoning — See Ch. 497.
Shoreland-wetland zoning — See Ch. 506.
Subdivision of land — See Ch. 512.
Zoning — See Ch. 520.
A. 
This chapter is adopted by the Village Board under the authority granted by § 61.354, Wis. Stats. This chapter supersedes all provisions of an ordinance previously enacted under § 61.35, Wis. Stats., that relate to stormwater management regulations. Except as otherwise specified in § 61.354. Wis. Stats., § 61.35, Wis. Stats., applies to this chapter and to any amendments to this chapter.
B. 
The provisions of this chapter are deemed not to limit any other lawful regulatory powers of the same governing body.
C. 
The Village Board hereby designates the Village Administrator to administer and enforce the provisions of this chapter.
D. 
The requirements of this chapter do not preempt more stringent stormwater management requirements that may be imposed by any of the following:
(1) 
Wisconsin Department of Natural Resources administrative rules, permits or approvals, including those authorized under §§ 281.16 and 283.33, Wis. Stats.
(2) 
Targeted nonagricultural performance standards promulgated in rules by the Wisconsin Department of Natural Resources under § NR 151.004, Wis. Adm. Code.
The Village of Trempealeau acknowledges that uncontrolled postconstruction runoff has a significant impact upon water resources and the health, safety and general welfare of the community and diminishes the public enjoyment and use of natural resources. Specifically, uncontrolled postconstruction runoff can:
A. 
Degrade physical stream habitat by increasing stream bank erosion, increasing streambed scour, diminishing groundwater recharge, diminishing stream base flows and increasing stream temperature.
B. 
Diminish the capacity of lakes and streams to support fish, aquatic life, recreational and water supply uses by increasing pollutant loading of sediment, suspended solids, nutrients, heavy metals, bacteria, pathogens and other urban pollutants.
C. 
Alter wetland communities by changing wetland hydrology and by increasing pollutant loads.
D. 
Reduce the quality of groundwater by increasing pollutant loading.
E. 
Threaten public health, safety, property and general welfare by overtaxing storm sewers, drainage ways, and other minor drainage facilities.
A. 
Purpose. The general purpose of this chapter is to establish long-term, postconstruction runoff management requirements that will diminish the threats to public health, safety, welfare and the aquatic environment. Specific purposes are to:
(1) 
Further the maintenance of safe and healthful conditions.
(2) 
Prevent and control the adverse effects of stormwater; prevent and control soil erosion; prevent and control water pollution; protect spawning grounds, fish and aquatic life; control building sites, placement of structures and land uses; preserve ground cover and scenic beauty; and promote sound economic growth.
(3) 
Control exceedance of the safe capacity of existing drainage facilities and receiving water bodies; prevent undue channel erosion; and control increases in the scouring and transportation of particulate matter.
(4) 
Minimize the amount of pollutants discharged from the separate storm sewer to protect the waters of the state.
B. 
Intent. It is the intent of the Village Board that this chapter regulates postconstruction stormwater discharges to waters of the state. This chapter may be applied on a site-by-site basis. The Village Board recognizes, however, that the preferred method of achieving the stormwater performance standards set forth in this chapter is through the preparation and implementation of comprehensive, systems-level stormwater management plans that cover hydrologic units, such as watersheds, on a municipal and regional scale. Such plans may prescribe regional stormwater devices, practices or systems, any of which may be designed to treat runoff from more than one site prior to discharge to waters of the state. Where such plans are in conformance with the performance standards developed under § 281.16, Wis. Stats., for regional stormwater management measures and have been approved by the Village Board, it is the intent of this chapter that the approved stormwater management plan be used to identify postconstruction management measures acceptable for the community.
A. 
Applicability.
(1) 
Except as provided under Subsection A(2), this chapter applies to a postconstruction site whereupon one acre or more of land disturbing construction activity occurs during construction.
(2) 
A site that meets any of the criteria in this subsection is exempt from the requirements of this chapter:
(a) 
A postconstruction site with less than 10% connected imperviousness, based on the area of land disturbance, provided the cumulative area of all impervious surfaces is less than one acre. However, the exemption of this subsection does not include exemption from the protective area standards of this chapter.
(b) 
Agricultural facilities and practices.
(c) 
Underground utility construction, but not including the construction of any aboveground structures associated with utility construction.
(3) 
Notwithstanding the applicability requirements in Subsection A(1), this chapter applies to postconstruction sites of any size that, as determined by the administering authority, are likely to result in runoff that exceeds the safe capacity of the existing drainage facilities or receiving body of water, causes undue channel erosion, or increases water pollution by scouring or the transportation of particulate matter.
B. 
Jurisdiction. This chapter applies to postconstruction sites within the boundaries and jurisdiction of the Village of Trempealeau.
C. 
Exclusions. This chapter is not applicable to activities conducted by a state agency, as defined under § 227.01(1), Wis. Stats.
As used in this chapter, the following terms shall have the meanings indicated:
ADEQUATE SOD or SELF-SUSTAINING VEGETATIVE COVER
Maintenance of sufficient vegetation types and densities such that the physical integrity of the stream bank or lakeshore is preserved. Self-sustaining vegetative cover includes grasses, forbs, sedges and duff layers of fallen leaves and woody debris.
ADMINISTERING AUTHORITY
A governmental employee, or a regional planning commission empowered under § 61.354, Wis. Stats., that is designated by the Village Board to administer this chapter.
AGRICULTURAL FACILITIES AND PRACTICES
Has the meaning given in § 281.16(1), Wis. Stats.
ATLAS 14
The National Oceanic and Atmospheric Administration (NOAA) Atlas 14 Precipitation-Frequency Atlas of the United States, Volume 8 (Midwestern States), published in 2013.
AVERAGE ANNUAL RAINFALL
A typical calendar year of precipitation as determined by the Wisconsin Department of Natural Resources for users of models such as WinSLAMM, P8 or equivalent methodology. All modeling involving average annual rainfall or runoff volumes data is from the Minneapolis area between March 13 through November 4, 1959.
BEST MANAGEMENT PRACTICE or BMP
Structural or nonstructural measures, practices, techniques or devices employed to avoid or minimize sediment or pollutants carried in runoff to waters of the state.
BUSINESS DAY
A day the office of the Village Administrator is routinely and customarily open for business.
CEASE-AND-DESIST ORDER
A court-issued order to halt land disturbing construction activity that is being conducted without the required permit or in violation of a permit issued by the Village Administrator.
COMBINED SEWER SYSTEM
A system for conveying both sanitary sewage and stormwater runoff.
CONNECTED IMPERVIOUSNESS
An impervious surface connected to the waters of the state via a separate storm sewer, an impervious flow path, or a minimally pervious flow path.
DESIGN STORM
A hypothetical discrete rainstorm characterized by a specific duration, temporal distribution, rainfall intensity, return frequency and total depth of rainfall.
DEVELOPMENT
Residential, commercial, industrial or institutional land uses and associated roads.
DIRECT CONDUITS TO GROUNDWATER
Wells, sinkholes, swallets, fractured bedrock at the surface, mine shafts, nonmetallic mines, tile inlets discharging to groundwater, quarries, or depressional groundwater recharge areas over shallow fractured bedrock.
DIVISION OF LAND
The creation from one parcel of five or more parcels or building sites of five or fewer acres each in area where such creation occurs at one time or through the successive partition within a five-year period.
EFFECTIVE INFILTRATION AREA
The area of the infiltration system that is used to infiltrate runoff and does not include the area used for site access, berms or pretreatment.
EROSION
The process by which the land's surface is worn away by the action of wind, water, ice or gravity.
EXCEPTIONAL RESOURCE WATERS
Waters listed in § NR 102.11, Wis. Adm. Code.
EXTRATERRITORIAL
The unincorporated area within 1 1/2 miles of the Village limits.
FILTERING LAYER
Soil that has at least a three-foot deep layer with at least 20% fines; or at least a five-foot deep layer with at least 10% fines; or an engineered soil with an equivalent level of protection as determined by the regulatory authority for the site.
FINAL STABILIZATION
That all land disturbing construction activities at the construction site have been completed and that a uniform perennial vegetative cover has been established with a density of at least 70% of the cover for the unpaved areas and areas not covered by permanent structures or that employ equivalent permanent stabilization measures.
FINANCIAL GUARANTEE
A performance bond, maintenance bond, surety bond, irrevocable letter of credit, or similar guarantees submitted to the Village Administrator by the responsible party to assure that requirements of the ordinance are carried out in compliance with the stormwater management plan.
GOVERNING BODY
Town Board of Supervisors, County Board of Supervisors, city council, Village Board of Trustees or Village Council.
IMPERVIOUS SURFACE
An area that releases as runoff all or a large portion of the precipitation that falls on it, except for frozen soil. Rooftops, sidewalks, driveways, gravel or paved parking lots and streets are examples of areas that typically are impervious.
INFILL
An undeveloped area of land located within an existing urban sewer service area, surrounded by development or development and natural or man-made features where development cannot occur.
INFILTRATION
The entry of precipitation or runoff into or through the soil.
INFILTRATION SYSTEM
A device or practice such as a basin, trench, rain garden or swale designed specifically to encourage infiltration, but does not include natural infiltration in pervious surfaces such as lawns, redirecting of rooftop downspouts onto lawns or minimal infiltration from practices, such as swales or roadside channels designed for conveyance and pollutant removal only.
LAND DISTURBING CONSTRUCTION ACTIVITY
Any man-made alteration of the land surface resulting in a change in the topography or existing vegetative or non-vegetative soil cover, that may result in runoff and lead to an increase in soil erosion and movement of sediment into waters of the state. Land disturbing construction activity includes clearing and grubbing, demolition, excavating, pit trench dewatering, filling and grading activities.
LANDOWNER
Any person holding fee title, an easement or other interest in property, which allows the person to undertake cropping, livestock management, land disturbing construction activity or maintenance of stormwater BMPs on the property.
MAINTENANCE AGREEMENT
A legal document that provides for long-term maintenance of stormwater management practices.
MAXIMUM EXTENT PRACTICABLE
The highest level of performance that is achievable but is not equivalent to a performance standard identified in this chapter as determined in accordance with § 437-6 of this chapter.
NEW DEVELOPMENT
Development resulting from the conversion of previously undeveloped land or agricultural land uses.
NRCS MSE3 OR MSE4 DISTRIBUTION
A specific precipitation distribution developed by the United States Department of Agriculture, Natural Resources Conservation Service, using precipitation data from Atlas 14.
OFF-SITE
Located outside the property boundary described in the permit application.
ON-SITE
Located within the property boundary described in the permit application.
ORDINARY HIGH-WATER MARK
Has the meaning given in § NR 115.03(6), Wis. Adm. Code.
OUTSTANDING RESOURCE WATERS
Waters listed in § NR 102.10, Wis. Adm. Code.
PERCENT FINES
The percentage of a given sample of soil, which passes through a No. 200 sieve.
PERFORMANCE STANDARD
A narrative or measurable number specifying the minimum acceptable outcome for a facility or practice.
PERMIT
A written authorization made by the Village Administrator to the applicant to conduct land disturbing construction activity or to discharge postconstruction runoff to waters of the state.
PERMIT ADMINISTRATION FEE
A sum of money paid to the Village of Trempealeau by the permit applicant for the purpose of recouping the expenses incurred by the authority in administering the permit.
PERVIOUS SURFACE
An area that releases as runoff a small portion of the precipitation that falls on it. Lawns, gardens, parks, forests or other similar vegetated areas are examples of surfaces that typically are pervious.
POLLUTANT
Has the meaning given in § 283.01(13), Wis. Stats.
POLLUTION
Has the meaning given in § 281.01(10), Wis. Stats.
POSTCONSTRUCTION SITE
A construction site following the completion of land disturbing construction activity and final site stabilization.
PREDEVELOPMENT CONDITION
The extent and distribution of land cover types present before the initiation of land disturbing construction activity, assuming that all land uses prior to development activity are managed in an environmentally sound manner.
PREVENTIVE ACTION LIMIT
Has the meaning given in § NR 140.05(17), Wis. Adm. Code.
PROTECTIVE AREA
An area of land that commences at the top of the channel of lakes, streams and rivers, or at the delineated boundary of wetlands, and that is the greatest of the following widths, as measured horizontally from the top of the channel or delineated wetland boundary to the closest impervious surface.
REDEVELOPMENT
Areas where development is replacing older development.
RESPONSIBLE PARTY
The landowner or any other entity performing services to meet the requirements of this chapter through a contract or other agreement.
RUNOFF
Stormwater or precipitation including rain, snow or ice melt or similar water that moves on the land surface via sheet or channelized flow.
SEPARATE STORM SEWER
A conveyance or system of conveyances including roads with drainage systems, streets, catch basins, curbs, gutters, ditches, constructed channels or storm drains, which meets all of the following criteria:
A. 
Is designed or used for collecting water or conveying runoff.
B. 
Is not part of a combined sewer system.
C. 
Is not part of a publicly owned wastewater treatment works that provides secondary or more stringent treatment.
D. 
Discharges directly or indirectly to waters of the state.
SILVICULTURE ACTIVITY
Activities including tree nursery operations, tree harvesting operations, reforestation, tree thinning, prescribed burning, and pest and fire control. Clearing and grubbing of an area of a construction site is not a silviculture activity.
SITE
The entire area included in the legal description of the land on which the land disturbing construction activity occurred.
STOP-WORK ORDER
An order issued by the administering authority which requires that all construction activity on the site be stopped.
STORMWATER MANAGEMENT PLAN
A Comprehensive Plan designed to reduce the discharge of pollutants from stormwater, after the site has under gone final stabilization, following completion of the construction activity.
STORMWATER MANAGEMENT SYSTEM PLAN
A Comprehensive Plan designed to reduce the discharge of runoff and pollutants from hydrologic units on a regional or municipal scale.
TECHNICAL STANDARD
A document that specifies design, predicted performance and operation and maintenance specifications for a material, device or method.
TOP OF THE CHANNEL
An edge or point on the landscape landward from the ordinary high-water mark of a surface water of the state, where the slope of the land begins to be less than 12% continually for at least 50 feet. If the slope of the land is 12% or less continually for the initial 50 feet landward from the ordinary high-water mark, the top of the channel is the ordinary high-water mark.
TOTAL MAXIMUM DAILY LOAD or TMDL
The amount of pollutants specified as a function of one or more water quality parameters, that can be discharged per day into a water quality limited segment and still ensure attainment of the applicable water quality standard.
TP-40
Technical Paper No. 40, Rainfall Frequency Atlas of the United States, published in 1961.
TR-55
The United States Department of Agriculture, Natural Resources Conservation Service (previously Soil Conservation Service), Urban Hydrology for Small Watersheds, Second Edition, Technical Release 55, June 1986, which is incorporated by reference for this chapter.
TRANSPORTATION FACILITY
A highway, a railroad, a public mass transit facility, a public-use airport, a public trail or any other public work for transportation purposes such as harbor improvements under § 85.095(1)(b), Wis. Stats. "Transportation facility" does not include building sites for the construction of public buildings and buildings that are places of employment that are regulated by the Department pursuant to § 281.33, Wis. Stats.
TSS
Total suspended solids.
TYPE II DISTRIBUTION
A rainfall type curve as established in the United States Department of Agriculture, Soil Conservation Service, Technical Paper 149, published in 1973.
WATERS OF THE STATE
Includes those portions of Lake Michigan and Lake Superior within the boundaries of this state, and all lakes, bays, rivers, streams, springs, ponds, wells, impounding reservoirs, marshes, watercourses, drainage systems and other surface water or groundwater, natural or artificial, public or private, within this state or its jurisdiction.
Maximum extent practicable applies when a person who is subject to a performance standard of this chapter demonstrates to the Village Administrator's satisfaction that a performance standard is not achievable and that a lower level of performance is appropriate. In making the assertion that a performance standard is not achievable and that a level of performance different from the performance standard is the maximum extent practicable, the responsible party shall take into account the best available technology, cost-effectiveness, geographic features, and other competing interests such as protection of public safety and welfare, protection of endangered and threatened resources, and preservation of historic properties.
The following methods shall be used in designing the water quality, peak discharge, and infiltration components of stormwater practices needed to meet the water quality standards of this chapter:
A. 
Consistent with the technical standards identified, developed or disseminated by the Wisconsin Department of Natural Resources under Subchapter V of Chapter NR 151, Wis. Adm. Code.
B. 
Where technical standards have not been identified or developed by the Wisconsin Department of Natural Resources, other technical standards may be used, provided that the methods have been approved by the Village Administrator in consultation with the Village Engineer.
A. 
Responsible party. The responsible party shall comply with this section.
B. 
Stormwater management plan. A written stormwater management plan in accordance with § 437-10 shall be developed and implemented for each postconstruction site.
C. 
Maintenance of effort. For redevelopment sites where the redevelopment will be replacing older development that was subject to postconstruction performance standards of NR 151 in effect on or after October 1, 2004, the responsible party shall meet the total suspended solids reduction, peak flow control, infiltration, and protective areas standards applicable to the older development or meet the redevelopment standards of this chapter, whichever is more stringent.
D. 
Requirements. The stormwater management plan required under Subsection B shall include the following:
(1) 
Total suspended solids. BMPs shall be designed, installed and maintained to control total suspended solids carried in runoff from the postconstruction site as follows:
(a) 
BMPs shall be designed in accordance with Table 1 or to the maximum extent practicable as provided in Subsection D(1)(b). The design shall be based on an average annual rainfall, as compared to no runoff management controls.
Table 1 - TSS Reduction Standards
Development Type
TSS Reduction
New development
80%
Infill development
80%
Redevelopment
40% of load from parking areas and roads
(b) 
Maximum extent practicable. If the design cannot meet a total suspended solids reduction performance standard of Table 1, the stormwater management plan shall include a written, site-specific explanation of why the total suspended solids reduction performance standard cannot be met and why the total suspended solids load will be reduced only to the maximum extent practicable.
(c) 
Models. Pollutant loading models such as DETPOND, WinSLAMM, P8 or equivalent methodology may be used to evaluate the efficiency of the design in reducing total suspended solids. Use the most recent version of the model and the rainfall files and other parameter files identified for Wisconsin users unless directed otherwise by the regulatory authority.
(d) 
Off-site drainage. When designing BMPs, runoff draining to the BMP from off-site shall be taken into account in determining the treatment efficiency of the practice. Any impact on the efficiency shall be compensated for by increasing the size of the BMP accordingly.
(2) 
Peak discharge.
(a) 
By design, BMPs shall be employed to maintain or reduce the one-year, twenty-four-hour; and the two-year, twenty-four-hour postconstruction peak runoff discharge rates to the one-year, twenty-four-hour; and the two-year, twenty-four-hour predevelopment peak runoff discharge rates, respectively, or to the maximum extent practicable. The runoff curve numbers in Table 2 shall be used to represent the actual predevelopment conditions. Where the predevelopment condition is a combination of woodland, grassland, or cropland, the runoff curve number should be prorated by area. Peak discharges shall be calculated using TR-55 runoff curve number methodology, National Oceanic and Atmospheric Administration (NOAA) Atlas 14 Precipitation Frequency Estimates for precipitation depths, and the appropriate NRCS Wisconsin MSE3 precipitation distribution or the DNR Flood Analyses precipitation distribution for critical durations. The Natural Resources Conservation Service (NRCS) Wisconsin has calculated county-specific Atlas 14 precipitation depths and they are to be used. The NRCS calculated county-specific Atlas 14 precipitation depths and MSE3 and MSE4 precipitation distributions are available at: http://www.nrcs.usda.gov/wps/portal/nrcs/detail/wi/technical/engineering /?cid=nrcs142p2_025417.
Table 2 - Maximum Predevelopment Runoff Curve Numbers
Hydrologic Soil Group
Runoff Curve Number
A
B
C
D
Woodland
30
55
70
77
Grassland
39
61
71
78
Cropland
55
69
78
83
(b) 
This subsection does not apply to any of the following:
[1] 
A postconstruction site where the discharge is directly into a lake over 5,000 acres or a stream or river segment draining more than 500 square miles.
[2] 
Except as provided under Subsection C, a redevelopment postconstruction site.
[3] 
An infill development area less than five acres.
(3) 
Infiltration.
(a) 
Best management practices. BMPs shall be designed, installed, and maintained to infiltrate runoff in accordance with the following or to the maximum extent practicable:
[1] 
Low imperviousness. For development up to 40% connected imperviousness, such as parks, cemeteries, and low-density residential development, infiltrate sufficient runoff volume so that the postdevelopment infiltration volume shall be at least 90% of the predevelopment infiltration volume, based on an average annual rainfall. However, when designing appropriate infiltration systems to meet this requirement, no more than 1% of the postconstruction site is required as an effective infiltration area.
[2] 
Moderate imperviousness. For development with more than 40% and up to 80% connected imperviousness, such as medium- and high-density residential, multifamily development, industrial and institutional development, and office parks, infiltrate sufficient runoff volume so that the postdevelopment infiltration volume shall be at least 75% of the predevelopment infiltration volume, based on an average annual rainfall. However, when designing appropriate infiltration systems to meet this requirement, no more than 2% of the postconstruction site is required as an effective infiltration area.
[3] 
High imperviousness. For development with more than 80% connected imperviousness, such as commercial strip malls, shopping centers, and commercial downtowns, infiltrate sufficient runoff volume so that the postdevelopment infiltration volume shall be at least 60% of the predevelopment infiltration volume, based on an average annual rainfall. However, when designing appropriate infiltration systems to meet this requirement, no more than 2% of the postconstruction site is required as an effective infiltration area.
(b) 
Predevelopment. The predevelopment condition shall be the same as specified in Table 2 of Subsection D(2).
(c) 
Source areas.
[1] 
Prohibitions. Runoff from the following areas may not be infiltrated and may not qualify as contributing to meeting the requirements of this section unless demonstrated to meet the conditions identified in Subsection D(3)(f):
[a] 
Areas associated with a tier 1 industrial facility identified in § NR 216.21(2)(a), including storage, loading and parking. Rooftops may be infiltrated with the concurrence of the regulatory authority.
[b] 
Storage and loading areas of a tier 2 industrial facility identified in § NR 216.21(2)(b). Runoff from the employee and guest parking and rooftop areas of a tier 2 facility may be infiltrated, but runoff from the parking area may require pretreatment.
[c] 
Fueling and vehicle maintenance areas. Runoff from rooftops of fueling and vehicle maintenance areas may be infiltrated with the concurrence of the regulatory authority.
[2] 
Exemptions. Runoff from the following areas may be credited toward meeting the requirement when infiltrated, but the decision to infiltrate runoff from these source areas is optional:
[a] 
Parking areas and access roads less than 5,000 square feet for commercial development.
[b] 
Parking areas and access roads less than 5,000 square feet for industrial development not subject to the prohibitions under Subsection D(3)(c)[1].
[c] 
Except as provided under § 437-8C, redevelopment postconstruction sites.
[d] 
Infill development areas less than five acres.
[e] 
Roads on commercial, industrial and institutional land uses, and arterial residential roads.
(d) 
Location of practices.
[1] 
Prohibitions. Infiltration practices may not be located in the following areas:
[a] 
Areas within 1,000 feet upgradient or within 100 feet downgradient of direct conduits to groundwater.
[b] 
Areas within 400 feet of a community water system well as specified in § NR 811.16(4) or within the separation distances listed in § NR 812.08 for any private well or noncommunity well for runoff infiltrated from commercial, including multifamily residential, industrial and institutional land uses or regional devices for one- and two-family residential development.
[c] 
Areas where contaminants of concern, as defined in § NR 720.03(2), are present in the soil through which infiltration will occur.
[2] 
Separation distances.
[a] 
Infiltration practices shall be located so that the characteristics of the soil and the separation distance between the bottom of the infiltration system and the elevation of seasonal high groundwater or the top of bedrock are in accordance with Table 3:
Table 3 - Separation Distances and Soil Characteristics
Source Area
Separation Distance
(feet)
Soil Characteristics
Industrial commercial, institutional parking lots and roads
5 or more
Filtering layer
Residential arterial roads
5 more
Filtering layer
Roofs draining to subsurface infiltration practices
1 or more
Native or engineered soil with particles finer than coarse sand
Roofs draining to surface infiltration practices
Not applicable
Not applicable
All other impervious source areas
3 or more
Filtering layer
[b] 
Notwithstanding Subsection D(3)(d)[2], applicable requirements for injection wells classified under Ch. NR 815 shall be followed.
[3] 
Infiltration rate exemptions. Infiltration practices located in the following areas may be credited toward meeting the requirements under the following conditions, but the decision to infiltrate under these conditions is optional:
[a] 
Where the infiltration rate of the soil measured at the proposed bottom of the infiltration system is less than 0.6 inch per hour using a scientifically credible field test method.
[b] 
Where the least permeable soil horizon to five feet below the proposed bottom of the infiltration system using the U.S. Department of Agriculture method of soils analysis is one of the following: sandy clay loam, clay loam, silty clay loam, sandy clay, silty clay, or clay.
(e) 
Alternate use. Where alternate uses of runoff are employed, such as for toilet flushing, laundry, or irrigation or storage on green roofs where an equivalent portion of the runoff is captured permanently by rooftop vegetation, such alternate use shall be given equal credit toward the infiltration volume required by this section.
(f) 
Groundwater standards.
[1] 
Infiltration systems designed in accordance with this section shall, to the extent technically and economically feasible, minimize the level of pollutants infiltrating to groundwater and shall maintain compliance with the preventive action limit at a point of standards application in accordance with Ch. NR 140. However, if site-specific information indicates that compliance with a preventive action limit is not achievable, the infiltration BMP may not be installed or shall be modified to prevent infiltration to the maximum extent practicable.
[2] 
Notwithstanding Subsection D(3)(f)[1], the discharge from BMPs shall remain below the enforcement standard at the point of standards application.
(g) 
Pretreatment. Before infiltrating runoff, pretreatment shall be required for parking lot runoff and for runoff from new road construction in commercial, industrial and institutional areas that will enter an infiltration system. The pretreatment shall be designed to protect the infiltration system from clogging prior to scheduled maintenance and to protect groundwater quality in accordance with Subsection D(3)(f). Pretreatment options may include, but are not limited to, oil and grease separation, sedimentation, biofiltration, filtration, swales or filter strips.
(h) 
Maximum extent practicable. Where the conditions of Subsection D(3)(c) and (d) limit or restrict the use of infiltration practices, the performance standard of § 437-8D(3) shall be met to the maximum extent practicable.
(4) 
Protective areas.
(a) 
Definition. In this section, "protective area" means an area of land that commences at the top of the channel of lakes, streams and rivers, or at the delineated boundary of wetlands, and that is the greatest of the following widths, as measured horizontally from the top of the channel or delineated wetland boundary to the closest impervious surface. However, in this section, "protective area" does not include any area of land adjacent to any stream enclosed within a pipe or culvert, so that runoff cannot enter the enclosure at this location.
[1] 
For outstanding resource waters and exceptional resource waters: 75 feet.
[2] 
For perennial and intermittent streams identified on a U.S. Geological Survey 7.5-minute series topographic map, or a county soil survey map, whichever is more current: 50 feet.
[3] 
For lakes: 50 feet.
[4] 
For wetlands not subject to Subsection D(4)(a)[5] and [6]: 50 feet.
[5] 
For highly susceptible wetlands: 75 feet. Highly susceptible wetlands include the following types: calcareous fens, sedge meadows, open and coniferous bogs, low prairies, coniferous swamps, lowland hardwood swamps, and ephemeral ponds.
[6] 
For less susceptible wetlands, 10% of the average wetland width, but no less than 10 feet nor more than 30 feet. Less susceptible wetlands include: degraded wetland dominated by invasive species such as reed canary grass; cultivated hydric soils; and any gravel pits, or dredged material or fill material disposal sites that take on the attributes of a wetland.
[7] 
In Subsection D(4)(a)[4] to [6], determinations of the extent of the protective area adjacent to wetlands shall be made on the basis of the sensitivity and runoff susceptibility of the wetland in accordance with the standards and criteria in § NR 103.03. A stream or lake is not eligible for a lower protective area width even if contiguous to a less susceptible wetland.
[8] 
Wetland boundary delineation shall be made in accordance with § NR 103.08(1m). This subsection does not apply to wetlands that have been completely filled in compliance with all applicable state and federal regulations. The protective area for wetlands that have been partially filled in compliance with all applicable state and federal regulations shall be measured from the wetland boundary delineation after a fill has been placed. Where there is a legally authorized wetland fill, the protective area standard need not be met in that location.
[9] 
For concentrated flow channels with drainage areas greater than 130 acres: 10 feet.
[10] 
Notwithstanding Subsection D(4)(a)[1] to [9], the greatest protective area width shall apply where rivers, streams, lakes and wetlands are contiguous.
(b) 
Applicability. This section applies to postconstruction sites located within a protective area, except those areas exempted pursuant to Subsection D(4)(d).
(c) 
Requirements. The following requirements shall be met:
[1] 
Impervious surfaces shall be kept out of the protective area entirely or to the maximum extent practicable. If there is no practical alternative to locating an impervious surface in the protective area, the stormwater management plan shall contain a written, site-specific explanation.
[2] 
Where land disturbing construction activity occurs within a protective area, adequate noninvasive sod or self-sustaining noninvasive vegetative cover of 70% or greater shall be established and maintained where no impervious surface is present. The adequate sod or self-sustaining vegetative cover shall be sufficient to provide for bank stability, maintenance of fish habitat, and filtering of pollutants from upslope overland flow areas under sheet flow conditions. Nonvegetative materials, such as rock riprap, may be employed on the bank as necessary to prevent erosion such as on steep slopes or where high-velocity flows occur.
[3] 
BMPs such as filter strips, swales, or wet detention ponds, that are designed to control pollutants from nonpoint sources, may be located in the protective area.
(d) 
Exemptions. This section does not apply to any of the following:
[1] 
Except as provided under § 437-8C, redevelopment postconstruction sites.
[2] 
Infill development areas less than five acres.
[3] 
Structures that cross or access surface water such as boat landings, bridges, and culverts.
[4] 
Structures constructed in accordance with § 59.692(1v), Wis. Stats.
[5] 
Areas of postconstruction sites from which the runoff does not enter the surface water, including wetlands, without first being treated by a BMP to meet the local ordinance requirements for total suspended solids and peak flow reduction, except to the extent that vegetative ground cover is necessary to maintain bank stability.
(5) 
Fueling and maintenance areas. Fueling and vehicle maintenance areas shall have BMPs designed, installed, and maintained to reduce petroleum within runoff, so that the runoff that enters waters of the state contains no visible petroleum sheen, or to the maximum extent practicable. A combination of the following BMPs may be used: oil and grease separators, canopies, petroleum spill cleanup materials, or any other structural or nonstructural method of preventing or treating petroleum in runoff.
E. 
General considerations for stormwater management measures. The following considerations shall be observed in on-site and off-site runoff management:
(1) 
Natural topography and land cover features such as natural swales, natural depressions, native soil-infiltrating capacity, and natural groundwater recharge areas shall be preserved and used, to the extent possible, to meet the requirements of this section.
(2) 
Emergency overland flow for all stormwater facilities shall be provided to prevent exceeding the safe capacity of downstream drainage facilities and prevent endangerment of downstream property or public safety.
F. 
BMP location.
(1) 
To comply with the performance standards required under § 437-8 of this chapter, BMPs may be located on-site or off-site as part of a regional stormwater device, practice or system, but shall be installed in accordance with § NR 151.003, Wis. Adm. Code.
(2) 
The Village Administrator may approve off-site management measures, provided that all of the following conditions are met:
(a) 
The Village Administrator determines that the postconstruction runoff is covered by a stormwater management system plan that is approved by the Village Board and that contains management requirements consistent with the purpose and intent of this chapter.
(b) 
The off-site facility meets all of the following conditions:
[1] 
The facility is in place.
[2] 
The facility is designed and adequately sized to provide a level of stormwater control equal to or greater than that which would be afforded by on-site practices meeting the performance standards of this chapter.
[3] 
The facility has a legally obligated entity responsible for its long-term operation and maintenance.
(3) 
Where a regional treatment option exists such that the Village Board exempts the applicant from all or part of the minimum on-site stormwater management requirements, the applicant shall be required to pay a fee in an amount determined in negotiation with the Village Board. In determining the fee for postconstruction runoff, the Village Board shall consider an equitable distribution of the cost for land, engineering design, construction, and maintenance of the regional treatment option.
G. 
Additional requirements. The Village Board may establish stormwater management requirements more stringent than those set forth in this chapter if the Village Board determines that the requirements are needed to control stormwater quantity or control flooding, comply with federally approved total maximum daily load requirements, or control pollutants associated with existing development or redevelopment.
A. 
Permit required. No responsible party may undertake a land disturbing construction activity without receiving a postconstruction runoff permit from the Village Administrator prior to commencing the proposed activity.
B. 
Permit application and fees. Unless specifically excluded by this chapter, any responsible party desiring a permit shall submit to the Village Administrator a permit application on a form provided by the Village Administrator for that purpose.
(1) 
Unless otherwise excluded by this chapter, a permit application must be accompanied by a stormwater management plan, a maintenance agreement and a nonrefundable permit administration fee.
(2) 
The stormwater management plan shall be prepared to meet the requirements of §§ 437-8 and 437-10, the maintenance agreement shall be prepared to meet the requirements of § 437-11, the financial guarantee shall meet the requirements of § 437-12, and fees shall be those established by the Village Board as set forth in § 437-13.
C. 
Permit application review and approval. The Village Administrator shall review any permit application that is submitted with a stormwater management plan, maintenance agreement, and the required fee. The following approval procedure shall be used:
(1) 
Within 30 business days of the receipt of a complete permit application, including all items as required by Subsection B, the Village Administrator shall inform the applicant whether the application, stormwater management plan and maintenance agreement are approved or disapproved based on the requirements of this chapter.
(2) 
If the stormwater permit application, stormwater management plan and maintenance agreement are approved, or if an agreed upon payment of fees in lieu of stormwater management practices is made, the Village Administrator shall issue the permit.
(3) 
If the stormwater permit application, stormwater management plan or maintenance agreement is disapproved, the Village Administrator shall detail in writing the reasons for disapproval.
(4) 
The Village Administrator may request additional information from the applicant. If additional information is submitted, the Village Administrator shall have 20 business days from the date the additional information is received to inform the applicant that the stormwater management plan and maintenance agreement are either approved or disapproved.
(5) 
Failure by the Village Administrator to inform the permit applicant of a decision within 20 business days of a required submittal shall be deemed to mean approval of the submittal and the applicant may proceed as if a permit had been issued.
D. 
Permit requirements. All permits issued under this chapter shall be subject to the following conditions, and holders of permits issued under this chapter shall be deemed to have accepted these conditions. The Village Administrator may suspend or revoke a permit for violation of a permit condition, following written notification of the responsible party. An action by the Village Administrator to suspend or revoke this permit may be appealed in accordance with § 437-15.
(1) 
Compliance with this permit does not relieve the responsible party of the responsibility to comply with other applicable federal, state, and local laws and regulations.
(2) 
The responsible party shall design and install all structural and nonstructural stormwater management measures in accordance with the approved stormwater management plan and this permit.
(3) 
The responsible party shall notify the Village Administrator at least two business days before commencing any work in conjunction with the stormwater management plan, and within two business days upon completion of the stormwater management practices. If required as a special condition under Subsection E, the responsible party shall make additional notification according to a schedule set forth by the Village Administrator so that practice installations can be inspected during construction.
(4) 
Practice installations required as part of this chapter shall be certified "as built" or "record" drawings by a licensed professional engineer. Completed stormwater management practices must pass a final inspection by the Village Engineer or its designee to determine if they are in accordance with the approved stormwater management plan and ordinance. The Village Administrator or its designee shall notify the responsible party in writing of any changes required in such practices to bring them into compliance with the conditions of this permit.
(5) 
The responsible party shall notify the Village Administrator of any significant modifications it intends to make to an approved stormwater management plan. The Village Administrator may require that the proposed modifications be submitted to it for approval prior to incorporation into the stormwater management plan and execution by the responsible party.
(6) 
The responsible party shall maintain all stormwater management practices in accordance with the stormwater management plan until the practices either become the responsibility of the Village Board, or are transferred to subsequent private owners as specified in the approved maintenance agreement.
(7) 
The responsible party authorizes the Village Board to perform any work or operations necessary to bring stormwater management measures into conformance with the approved stormwater management plan, and consents to a special assessment or charge against the property as authorized under Subch. VII of Ch. 66, Wis. Stats., or to charging such costs against the financial guarantee posted under § 437-12.
(8) 
If so directed by the Village Administrator, the responsible party shall repair, at the responsible party's own expense, all damage to adjoining municipal facilities and drainageways caused by runoff, where such damage is caused by activities that are not in compliance with the approved stormwater management plan.
(9) 
The responsible party shall permit property access to the Village Administrator or its designee for the purpose of inspecting the property for compliance with the approved stormwater management plan and this permit.
(10) 
Where site development or redevelopment involves changes in direction, increases in peak rate and/or total volume of runoff from a site, the Village Administrator may require the responsible party to make appropriate legal arrangements with affected property owners concerning the prevention of endangerment to property or public safety.
(11) 
The responsible party is subject to the enforcement actions and penalties detailed in § 437-14, if the responsible party fails to comply with the terms of this permit.
E. 
Permit conditions. Permits issued under this subsection may include conditions established by Village Administrator in addition to the requirements needed to meet the performance standards in § 437-8 or a financial guarantee as provided for in § 437-12.
F. 
Permit duration. Permits issued under this section shall be valid from the date of issuance through the date the Village Administrator notifies the responsible party that all stormwater management practices have passed the final inspection required under Subsection D(4).
A. 
Stormwater management plan requirements. The stormwater management plan required under § 437-8B shall contain at a minimum the following information:
(1) 
Name, address, and telephone number for the following or their designees: landowner; developer; project engineer for practice design and certification; person(s) responsible for installation of stormwater management practices; and person(s) responsible for maintenance of stormwater management practices prior to the transfer, if any, of maintenance responsibility to another party.
(2) 
A proper legal description of the property proposed to be developed, referenced to the U.S. Public Land Survey system or to block and lot numbers within a recorded land subdivision plat.
(3) 
Predevelopment site conditions, including:
(a) 
One or more site maps at a scale of not less than one inch equals 50 feet. The site maps shall show the following: site location and legal property description; predominant soil types and hydrologic soil groups; existing cover type and condition; topographic contours of the site at a scale not to exceed two feet; topography and drainage network, including enough of the contiguous properties to show runoff patterns onto, through, and from the site; watercourses that may affect or be affected by runoff from the site; flow path and direction for all stormwater conveyance sections; watershed boundaries used in hydrology determinations to show compliance with performance standards; lakes, streams, wetlands, channels, ditches, and other watercourses on and immediately adjacent to the site; limits of the one-hundred-year floodplain; location of wells and wellhead protection areas covering the project area and delineated pursuant to § NR 811.16, Wis. Adm. Code.
(b) 
Hydrology and pollutant loading computations as needed to show compliance with performance standards. All major assumptions used in developing input parameters shall be clearly stated. The geographic areas used in making the calculations shall be clearly cross-referenced to the required map(s).
(4) 
Postdevelopment site conditions, including:
(a) 
Explanation of the provisions to preserve and use natural topography and land cover features to minimize changes in peak flow runoff rates and volumes to surface waters and wetlands.
(b) 
Explanation of any restrictions on stormwater management measures in the development area imposed by wellhead protection plans and ordinances.
(c) 
One or more site maps at a scale of not less than one inch equals 50 feet showing the following: postconstruction pervious areas including vegetative cover type and condition; impervious surfaces including all buildings, structures, and pavement; postconstruction topographic contours of the site at a scale not to exceed two feet; postconstruction drainage network including enough of the contiguous properties to show runoff patterns onto, through, and from the site; locations and dimensions of drainage easements; locations of maintenance easements specified in the maintenance agreement; flow path and direction for all stormwater conveyance sections; location and type of all stormwater management conveyance and treatment practices, including the on-site and off-site tributary drainage area; location and type of conveyance system that will carry runoff from the drainage and treatment practices to the nearest adequate outlet, such as a curbed street, storm drain, or natural drainageway; watershed boundaries used in hydrology and pollutant loading calculations and any changes to lakes, streams, wetlands, channels, ditches, and other watercourses on and immediately adjacent to the site.
(d) 
Hydrology and pollutant loading computations as needed to show compliance with performance standards. The computations shall be made for each discharge point in the development, and the geographic areas used in making the calculations shall be clearly cross-referenced to the required map(s).
(e) 
Results of investigations of soils and groundwater required for the placement and design of stormwater management measures: detailed drawings including cross-sections and profiles of all permanent stormwater conveyance and treatment practices.
(5) 
A description and installation schedule for the stormwater management practices needed to meet the performance standards in § 437-8.
(6) 
A maintenance plan developed for the life of each stormwater management practice, including the required maintenance activities and maintenance activity schedule.
(7) 
Cost estimates for the construction, operation, and maintenance of each stormwater management practice.
(8) 
Other information requested in writing by the Village Administrator to determine compliance of the proposed stormwater management measures with the provisions of this chapter.
(9) 
All site investigations, plans, designs, computations, and drawings shall be certified by a Davy Engineering Co., Inc., to be prepared in accordance with accepted engineering practice and requirements of this chapter.
B. 
Alternate requirements. The Village Administrator may prescribe alternative submittal requirements for applicants seeking an exemption to on-site stormwater management performance standards under § 437-8E.
A. 
Maintenance agreement required. The maintenance agreement required under § 437-9 for stormwater management practices shall be an agreement between the Village Board and the responsible party to provide for maintenance of stormwater practices beyond the duration period of this permit. The maintenance agreement shall be filed with the County Register of Deeds as a property deed restriction so that it is binding upon all subsequent owners of the land served by the stormwater management practices.
B. 
Agreement provisions. The maintenance agreement shall contain the following information and provisions and be consistent with the maintenance plan required by § 437-10A(6):
(1) 
Identification of the stormwater facilities and designation of the drainage area served by the facilities.
(2) 
A schedule for regular maintenance of each aspect of the stormwater management system consistent with the stormwater management plan required under § 437-9B.
(3) 
Identification of the responsible party(ies), organization or city, county, town or village responsible for long-term maintenance of the stormwater management practices identified in the stormwater management plan required under § 437-9B.
(4) 
Requirement that the responsible party(ies), organization, or city, county, town or village shall maintain stormwater management practices in accordance with the schedule included in Subsection B(2).
(5) 
Authorization for the Village Administrator or designee to access the property to conduct inspections of stormwater management practices as necessary to ascertain that the practices are being maintained and operated in accordance with the agreement.
(6) 
A requirement on the Village Administrator to maintain public records of the results of the site inspections, to inform the responsible party responsible for maintenance of the inspection results, and to specifically indicate any corrective actions required to bring the stormwater management practice into proper working condition.
(7) 
Agreement that the party designated under Subsection B(3), as responsible for long-term maintenance of the stormwater management practices, shall be notified by the Village Administrator of maintenance problems which require correction. The specified corrective actions shall be undertaken within a reasonable time frame as set by the Village Administrator.
(8) 
Authorization of the Village Board to perform the corrected actions identified in the inspection report if the responsible party designated under Subsection B(3) does not make the required corrections in the specified time period. The Village Administrator shall notify the County Treasurer to enter the amount due on the tax rolls and collect the money as a special charge against the property pursuant to Subch. VII of Ch. 66, Wis. Stats.
A. 
Establishment of the guarantee. The Village Administrator may require the submittal of a financial guarantee, the form and type of which shall be acceptable to the Village Board. The financial guarantee shall be in an amount determined by the Village Board to be the estimated cost of construction and the estimated cost of maintenance of the stormwater management practices during the period which the designated party in the maintenance agreement has maintenance responsibility. The financial guarantee shall give the Village Board the authorization to use the funds to complete the stormwater management practices if the responsible party defaults or does not properly implement the approved stormwater management plan, upon written notice to the responsible party by the Village Administrator that the requirements of this chapter have not been met.
B. 
Conditions for release. Conditions for the release of the financial guarantee are as follows:
(1) 
The Village Board shall release the portion of the financial guarantee established under this section, less any costs incurred by the Village Board to complete installation of practices, upon submission of "as built plans" or "record" drawings by a licensed professional engineer. The Village Board may make provisions for a partial pro rata release of the financial guarantee based on the completion of various development stages.
(2) 
The Village Board shall release the portion of the financial guarantee established under this section to assure maintenance of stormwater practices, less any costs incurred by the Village Board, at such time that the responsibility for practice maintenance is passed onto another entity via an approved maintenance agreement.
The fees referred to in other sections of this chapter shall be established by the Village Board and may from time to time be modified by resolution. A schedule of the fees established by the Village Board shall be available for review in the Clerk's office.
A. 
Any land disturbing construction activity or postconstruction runoff initiated after the effective date of this chapter by any person, firm, association, or corporation subject to the chapter provisions shall be deemed a violation unless conducted in accordance with the requirements of this chapter.
B. 
The Village Administrator shall notify the responsible party by certified mail of any noncomplying land disturbing construction activity or postconstruction runoff. The notice shall describe the nature of the violation, remedial actions needed, a schedule for remedial action, and additional enforcement action which may be taken.
C. 
Upon receipt of written notification from the Village Administrator under Subsection B, the responsible party shall correct work that does not comply with the stormwater management plan or other provisions of this permit. The responsible party shall make corrections as necessary to meet the specifications and schedule set forth by the Village Administrator in the notice.
D. 
If the violations to a permit issued pursuant to this chapter are likely to result in damage to properties, public facilities, or waters of the state, the Village Administrator or a designee may enter the land and take emergency actions necessary to prevent such damage. The costs incurred by the Village Board plus interest and legal costs shall be billed to the responsible party.
E. 
The Village Administrator is authorized to post a stop-work order on all land disturbing construction activity that is in violation of this chapter, or to request the Village Attorney to obtain a cease-and-desist order in any court with jurisdiction.
F. 
The Village Administrator may revoke a permit issued under this chapter for noncompliance with ordinance provisions.
G. 
Any permit revocation, stop-work order, or cease-and-desist order shall remain in effect unless retracted by the Village Administrator or by a court with jurisdiction.
H. 
The Village Administrator is authorized to refer any violation of this chapter, or a stop-work order or cease-and-desist order issued pursuant to this chapter, to the Village Attorney for the commencement of further legal proceedings in any court with jurisdiction.
I. 
Any person, firm, association, or corporation who does not comply with the provisions of this chapter shall be subject to a forfeiture pursuant to § 1-4, General penalty, of this Code, together with the costs of prosecution. Each day that the violation exists shall constitute a separate offense.
J. 
Compliance with the provisions of this chapter may also be enforced by injunction in any court with jurisdiction. It shall not be necessary to prosecute for forfeiture or a cease-and-desist order before resorting to in junctional proceedings.
K. 
When the Village Administrator determines that the holder of a permit issued pursuant to this chapter has failed to follow practices set forth in the stormwater management plan, or has failed to comply with schedules set forth in said stormwater management plan, the Village Administrator or a party designated by the Village Administrator may enter upon the land and perform the work or other operations necessary to bring the condition of said lands into conformance with requirements of the approved stormwater management plan. The Village Administrator shall keep a detailed accounting of the costs and expenses of performing this work. These costs and expenses shall be deducted from any financial security posted pursuant to § 437-12 of this chapter. Where such a security has not been established, or where such a security is insufficient to cover these costs, the costs and expenses shall be entered on the tax roll as a special charge against the property and collected with any other taxes levied thereon for the year in which the work is completed.
A. 
Board of Appeals. The Board of Appeals, created pursuant to Chapter 520, Zoning, of the Village of Trempealeau Code pursuant to § 61.354(4)(b), Wis. Stats., shall hear and decide appeals where it is alleged that there is error in any order, decision or determination made by the Village Board in administering this chapter. The Board shall also use the rules, procedures, duties, and powers authorized by statute in hearing and deciding appeals. Upon appeal, the Board may authorize variances from the provisions of this chapter that are not contrary to the public interest, and where owing to special conditions, a literal enforcement of the chapter will result in unnecessary hardship.
B. 
Who may appeal. Appeals to the Board of Appeals may be taken by any aggrieved person or by an officer, department, board, or bureau of the Village of Trempealeau affected by any decision of the Village Administrator.