[Amended 8-4-2010 by Ord. No. 2010-03; 12-2-2015 by Ord. No. 2015-05; 10-2-2019 by Ord. No. 2019-04]
The optional sketch plan provides an opportunity for the applicant to present a land use concept to the Township Supervisors and Planning Commission and allows for a preliminary discussion of issues and possible solutions to anticipated problems. Useful information for the sketch plan includes:
B.
Environmentally sensitive areas, as derived from existing data, such as light detecting and ranging (LiDAR) contour data, GIS maps, aerial photography, web-based soils, wetlands, and floodplain maps, and other digital mapping tools. The plan should include, but not be limited to:
(1)
Steep slopes.
(2)
Floodplains, floodplain soils, flood hazard districts and associated setbacks.
(3)
Wetlands and wetland buffers.
(4)
Existing stormwater management areas.
(5)
Riparian buffers.
(6)
Outstanding resource waters and associated buffers.
(7)
Plant communities (e.g., meadows, woodlands).
(8)
Significant trees standing alone.
C.
An aerial photograph with proposed property lines and rights-of-way indicated.
D.
Zoning information, including but not limited to applicable district, lot area and bulk regulations and proposed development data, such as density, lot area, setbacks, coverage. For conservation subdivisions, maximum density and minimum conservation land requirements.
E.
The sketch plan shall be prepared at the same scale as the existing features inventory, in accordance with § 320-18C. The sketch plan may be prepared as an overlay on top of the existing features inventory.
F.
Streets on and adjacent to the tract within 400 feet of the tract boundary.
G.
General description of proposed method of water supply, sewage disposal and stormwater management.
H.
A note on the sketch plan indicating that it is a schematic drawing not intended for construction purposes.