[Gen. Ords. 1959, § 12.13]
In order to eliminate unnecessary breaking of pavements in the
installation and repairing of sewers, water mains, gas mains, telephone
conduits, and similar facilities, no sewer, water main, gas main,
telephone conduit or other similar structure shall be laid under any
pavement or in the space reserved for any pavement except at intersections
or other points where pavement is crossed.
[Ord. No. 8492, § 2, 3-7-1996]
All electrical, telephone, cable television and other utility
service lines from the utility distribution system to newly erected
buildings shall be installed underground.