This article shall apply to major subdivisions as defined in § 360-5B of this chapter.
A. 
Prior to filing an application for preliminary approval, the applicant or his representative shall meet with the Building Inspector and other Borough officials to obtain application forms and to discuss application procedures and applicable ordinance requirements.
B. 
In addition, the developer may request a preapplication conference with the Planning Committee to discuss the conceptual design for the development of the property and the feasibility and timing of the application. The applicant shall contact the Building Inspector at least 15 calendar days prior to the regular meeting of the Planning Committee to request a preapplication conference with the Planning Committee.
C. 
The preapplication conference with the Planning Committee is voluntary and no formal application or fee is required. This opportunity is afforded to the developer to obtain information and guidance before entering into binding commitments or incurring substantial expenses for plan preparation.
D. 
While no formal application is required for a preapplication conference, the applicant should provide one copy of readily available information with the request for a preapplication conference which will show the location of the property and any special features such as streams, floodplains or other conditions that may affect the development of the property. Readily available resources which may be used include the deed for the property, a property survey, the Tax Maps prepared by the Allegheny County Assessor's Office, USGS Quadrangle Map showing natural features and topography, the National Flood Insurance Administration (NFIA) Flood Hazard Boundary Maps, Natural Resources Conservation Service Maps of soil types and the U.S. Bureau of Mines coal mine maps.
E. 
A preapplication conference shall not constitute formal filing of any application for approval of a subdivision, shall not bind the Planning Committee to approve any concept presented in the preapplication conference and shall not protect the application from any subsequent changes in ordinance provisions which may affect the proposed development between the preapplication conference and the official date of filing of an application for preliminary approval of a major subdivision under the terms of this chapter.
A. 
The applicant shall submit 10 copies of an application for preliminary approval required by § 360-23 of this chapter to the Building Inspector at least 28 calendar days prior to the regular meeting of the Planning Committee. If the 28th day falls on a holiday, the application shall be filed by the close of business on the immediately preceding working day.
B. 
The preliminary application shall not be considered to be complete and properly filed unless and until all items required by § 360-23 of this chapter, including the application fee, have been received.
C. 
Immediately upon receipt, the application shall be stamped with the date of receipt by the Borough and one copy of the application shall be distributed to the Borough Engineer.
D. 
The Building Inspector shall submit one copy of the complete and properly filed application to the Allegheny County Department of Economic Development for review and comment which shall be subject to payment of the prevailing county review fee by the applicant. Additional copies may be referred to any other appropriate review agency at the discretion of the Building Inspector.
All applications. All applications for preliminary approval of a major subdivision shall include the following:
A. 
Ten copies of the completed application form supplied by the Borough.
B. 
Application filing fee, as required by § 360-100A of this chapter.
C. 
Proof of proprietary interest.
D. 
Written evidence of compliance with all other Borough, county, state or federal permits required for the plan, if any.
E. 
Ten copies of a preliminary plat, prepared and sealed by a Pennsylvania registered professional land surveyor, drawn at a scale of not less than one inch equals 100 feet, all drawings on sheets not exceeding 34 inches by 44 inches, containing the following information:
(1) 
A boundary survey by a registered professional land surveyor and topographical survey of the total proposed subdivision by a registered professional engineer or registered professional land surveyor. If the developer intends to develop a tract of land in phases, the preliminary plat shall include the total tract.
(2) 
The proposed name of the subdivision.
(3) 
The name, address, certification and seal of the registered engineer or registered surveyor who prepared the plat and the registered surveyor who did the survey shown on the plat.
(4) 
The name and address of the developer and, if the developer is not the landowner, the name and address of the landowner.
(5) 
A location map showing the plan name and location; major existing thoroughfares related to the site, including the distance therefrom, title, scale and North point.
(6) 
A graphic scale, North point and date.
(7) 
A legend and notes.
(8) 
Date of preparation. All revisions shall be noted and dated.
(9) 
The existing platting of land adjacent to the site, including the names of adjoining owners, and all existing sewers, water mains, culverts, petroleum or gas lines and fire hydrants on the site or within 100 feet of the site shall be shown.
(10) 
The names of all adjoining subdivisions.
(11) 
Existing watercourses, wetlands, tree masses and other significant natural features.
(12) 
Location of existing buildings and all other structures, including walls, fences, culverts and bridges, with spot elevations of such buildings and structures. Structures to be removed shall be indicated by dashed lines; structures to remain shall be indicated by solid lines.
(13) 
Areas subject to periodic flooding, if any, as identified on the current Official Map for the Borough issued by the Federal Insurance and Mitigation Administration.
(14) 
A wetlands determination report for all sites which have hydric soils or soils with hydric inclusions and, if applicable, a wetlands delineation report for all jurisdictional wetlands on the site and the design techniques proposed to accommodate them.
(15) 
Contours at intervals of elevation of not more than five feet where the slope is greater than 10% or greater and at intervals of not more than two feet where the slope is less than 10%.
(16) 
A slope map showing the location and the area of land in square feet which has a slope of 25% or greater and certification by a registered professional geotechnical engineer regarding the feasibility of any proposed grading on slopes greater than 25%, the stability of the finished slopes, measures to mitigate landslides, soil erosion, sedimentation, stormwater runoff and potential impacts on adjacent properties.
(17) 
Written or graphic evidence that all earthmoving activities shall conform to all requirements for grading and excavation enacted by the Borough.
(18) 
A soils map identifying soils which are landslide-prone, if any.
(19) 
Existing streets and rights-of-way on or adjoining the site, including dedicated widths, roadway widths, approximate gradients, types and widths of pavements, curbs, sidewalks and other pertinent data.
(20) 
Existing and proposed easements, locations, widths and purposes.
(21) 
Location, width and approximate grade of all proposed streets, and the cuts or fills on said streets at fifty-foot intervals.
(22) 
The layout of lots (showing scaled dimensions), lot numbers and the area of lots in square feet.
(23) 
Front building lines.
(24) 
Parcels of land proposed to be reserved for schools, parks, playgrounds or other public, semipublic or community purposes, if any. Parcels shall be lettered A, B, C, etc., and the area of each parcel in acres shall be shown.
(25) 
Tabulation of site data, including total acreage of land to be subdivided, the number of residential lots, typical lot size, the acreage in the subdivision and the acreage in any proposed recreation or other public areas.
(26) 
The location of all existing sewer lines, culverts, or other underground structures, with pipe sizes and types, together with a preliminary layout of necessary extensions of, or additional, sewer lines, or other proposed underground utilities, and indicating easements for public utilities, sewage and drainage.
(27) 
Feasibility of proposals for disposition of stormwater and sanitary waste.
(28) 
Proposed private improvements, if any.
(29) 
Written or graphic evidence that all plans will conform to the Borough construction standards.
(30) 
If applicable, a notation on the plat that access to a state highway shall only be authorized by a highway occupancy permit issued by the Pennsylvania Department of Transportation under Section 420 of the State Highway Law[1] (P.L. 1242, No. 428 of June 1, 1945) and that the approvals of the Whitaker Borough Planning Committee and Borough Council are conditional, subject to action of the Pennsylvania Department of Transportation pursuant to application for a highway occupancy permit.
[1]
Editor's Note: See 36 P.S. § 670-420.
(31) 
Soil erosion and sedimentation control plan and narrative.
(32) 
If required by law, evidence that Soil erosion and sedimentation control plans have been submitted to the Allegheny County Conservation District and that the applicant has paid all applicable review fees and the NPDES permit has been issued.
(33) 
Plan monumentation, as required by § 360-78 of this chapter.
F. 
In the case of a plan which proposes 25 or more dwelling units, a traffic study prepared in accordance with § 360-52A(6).
G. 
Wherever public improvements are proposed or where evidence exists of deep mining, strip mining, landslide-prone soils or other geologic hazards on the site, a geologic report by a qualified registered professional geotechnical engineer acceptable to the Borough regarding soil and subsurface conditions and the probable measures needed to be considered in the design of the development, the location of structures and the design of foundations, if any.
H. 
Stormwater management plan and calculations required by § 360-88 of this chapter.
I. 
A written statement requesting any waivers or modifications to this chapter in accordance with Article IX, if applicable.
J. 
A written statement identifying any zoning variances which will be needed or which have been granted to the property by the Zoning Hearing Board.
A. 
Planning Committee recommendation.
(1) 
At the first regular meeting of the Planning Committee after submission of a preliminary application, the Planning Committee shall either accept or reject the application as complete in content and properly filed. The date of the Planning Committee meeting at which the preliminary application is accepted as complete and properly filed shall be the official date of filing of the application and shall represent the beginning of the sixty-day period for Planning Committee review and recommendation on the application, unless the applicant agrees, in writing, to an extension of time. During the sixty-day review period, the Borough Engineer shall provide preliminary review comments to the Planning Committee and the applicant.
(2) 
Within 60 days of the official date of filing of the preliminary application, the Planning Committee shall recommend either approval, approval with conditions or disapproval of the preliminary application at a public meeting. In the case of a recommendation for disapproval, the Planning Committee recommendation shall cite the specific requirements of this chapter which have not been met.
B. 
Action by Borough Council.
(1) 
The Borough Engineer shall present a written report to Borough Council which states whether an application complies with the requirements of this chapter and that report shall be included in the minutes of the Borough Council meeting.
(2) 
Within 90 days of the official date of filing of the preliminary application, Borough Council shall take one of the following actions: approve, approve with conditions, or disapprove the preliminary application at a public meeting. Borough Council shall not act until the review has been received from the Allegheny County Department of Economic Development or until 30 days has passed since the date that the application was submitted to the county for review. The recommendation of the Borough Planning Committee and the report of the Allegheny County Department of Economic Development, if any, shall be made a part of the record at that meeting.
(3) 
A letter indicating, approval with conditions or disapproval shall be mailed to the applicant within 15 days of the date of the decision by Borough Council. If the preliminary application is not approved, Borough Council shall specify the defects found in the preliminary application and cite the specific requirements of this chapter which have not been met.
C. 
Conditional approval. If Borough Council determines that certain conditions are warranted to be attached to preliminary approval to protect the public interest and guarantee compliance with the requirements of this chapter, the conditions of approval shall be specified, in writing, in the notice of conditional approval required by § 360-24B of this chapter. The applicant shall accept or reject the conditions attached to preliminary approval by giving written notice to the Borough Secretary within 30 days of the date of the meeting of Borough Council at which preliminary approval is granted. If the applicant rejects any of the conditions or if the applicant fails to give written notice to the Borough Secretary regarding acceptance or rejection of the conditions attached to preliminary approval within the required 30 days, preliminary approval shall automatically be rescinded without written notice to the applicant.
D. 
Deemed approval. Failure of Borough Council to render a decision and communicate it to the applicant within the time and in the manner prescribed by this chapter shall be deemed an approval of the application in the terms as presented, unless the applicant has agreed in writing to an extension of time or change in the prescribed manner of presentation of communication of the decision, in which case, failure to meet the extended time or change in manner of presentation of communication shall have like effect.
E. 
Expiration of preliminary approval.
(1) 
Preliminary approval shall expire five years from the date of the grant of preliminary approval by Borough Council, unless a written extension is submitted by the applicant and approved by Borough Council. Any request for extension shall be submitted to Borough Council at least 30 days prior to the prevailing expiration date. Extensions may be granted for one or more six-month periods upon a finding by Borough Council that such extension is warranted for reasonable cause and not due to the applicant's own negligence or inaction.
(2) 
In the case of a phased development, calling for the installation of improvements beyond the five-year period, a schedule shall be filed by the applicant with the preliminary application delineating all proposed phases, as well as time deadlines by which applications for final plat approval of each phase are intended to be filed. Such schedule shall be updated annually by the applicant on or before the anniversary of preliminary approval until final plat approval of the final phase has been granted. Any modification in the aforesaid schedule shall be subject to approval by Borough Council in its sole discretion. Phased development shall be subject to the time protection provisions of Section 508(4) of the Pennsylvania Municipalities Planning Code[1] (Act 247 of 1968, as amended).
[1]
Editor's Note: See 53 P.S. § 10508(4).
A. 
After a preliminary application for a major subdivision has been approved by Borough Council, the developer may proceed by filing an application for final approval of a major subdivision. The final application may be submitted for the entire development granted preliminary approval or may be submitted in phases in accordance with § 360-27E of this chapter.
B. 
If the major subdivision proposes any variances to Chapter 440, Zoning, the decision of the Zoning Hearing Board shall be issued prior to submission of the application for final approval. If the zoning variances are denied, the final plat shall be revised to show compliance with the zoning requirements at issue. If the final plat is not revised to show compliance with the zoning requirements which are at issue, a new preliminary application shall be required.
C. 
In either case, the applicant shall submit 10 copies of the final application required by § 360-26 to the Borough Secretary at least 28 calendar days prior to the regular meeting of the Planning Committee. If the 28th day falls on a holiday, the application shall be filed by the close of business on the immediately preceding working day.
D. 
Immediately upon receipt, the application shall be stamped with the date of receipt by the Borough and one copy of the application shall be distributed to the Borough Engineer. Additional copies may be referred to any other appropriate review agency at the discretion of the Building Inspector.
E. 
The final application shall not be considered to be complete and properly filed unless and until all items required by § 360-26 of this chapter, including the application fee, have been received.
All applications for final approval of a major subdivision shall include the following:
A. 
Ten copies of the completed application form supplied by the Borough.
B. 
Application filing fee, as required by § 360-100A of this chapter.
C. 
One copy of the approved preliminary plat.
D. 
Written evidence of compliance with all other applicable Borough, county, state or federal regulations or permits.
E. 
Ten copies of the final plat, prepared and sealed by a Pennsylvania registered professional land surveyor, in accurate and final form for recording drawn to a scale not less than one inch equals 100 feet on sheets not exceeding 24 inches by 36 inches which clearly delineates the following:
(1) 
The name of the subdivision.
(2) 
The name and address of the developer, and, if the developer is not the landowner, the name and address of the landowner.
(3) 
The name, address, signature, license number and seal of the registered land surveyor who prepared the plat.
(4) 
The North point, graphic scale and date.
(5) 
Accurate boundary lines, with dimensions and bearings. The boundary of the tract shall be determined by an accurate survey in the field which must be balanced and closed and certified to be correct by a registered land surveyor.
(6) 
Accurate locations of all existing and recorded streets intersecting the boundaries of the tract of land described in the final plat.
(7) 
Lot numbers, dimensions of each lot and the area of each lot, in square feet. All lots shall be numbered consecutively.
(8) 
All dimensions shall be shown to the nearest 0.01 foot, United States Standard measure.
(9) 
Final building lines.
(10) 
The location and dimensions of all easements for public improvements and any limitations on such easements.
(11) 
Dimensions and bearings of any property to be reserved for public, semipublic or community use, if any.
(12) 
Street names, which do not duplicate or sound like an existing street name in the 911 service area;
(13) 
Complete curve data for all curves included in the final plat, including radius, arc length, chord bearing and chord distance. Lines which join these curves that are nonradial or nontangential should be so noted.
(14) 
Street lines with accurate dimensions in feet and hundredths of feet.
(15) 
If applicable, a notation on the plat that access to a state highway shall only be authorized by a highway occupancy permit issued by the Pennsylvania Department of Transportation under Section 420 of the State Highway Law[1] (P.L. 1242, No. 428 of June 1, 1945) and that the approvals of the Whitaker Borough Planning Committee and Borough Council are conditional, subject to action of the Pennsylvania Department of Transportation pursuant to application for a highway occupancy permit.
[1]
Editor's Note: See 36 P.S. § 670-420.
(16) 
If applicable, a notation on the plat regarding any zoning variances granted by the Zoning Hearing Board, including the date of the decision, the appeal number and the nature of the variance granted.
(17) 
Location, type and size of all monuments and lot markers in accordance with the standards and requirements of § 360-78 of this chapter and the Allegheny County Subdivision and Land Development Ordinance and an indication of whether they were found or set.
(18) 
Soil erosion and sedimentation control plan and narrative.
(19) 
Where applicable, evidence of approvals from the Allegheny County Soil Conservation District, Pennsylvania Department of Environmental Protection or the U.S. Army Corps of Engineers and any other applicable county, state or federal agency.
(20) 
Spaces for the signatures of the Chairman and Secretary of the Planning Committee; the President and Secretary of Borough Council; the Borough Engineer; and dates of approval.
(21) 
Certification clauses required by the Allegheny County Subdivision and Land Development Ordinance.
F. 
Certificate of completion of public improvements in the plan or a performance bond to guarantee proper installation of the public improvements in the plan, as required by § 360-30 of this chapter.
G. 
Amenities bond, if required by § 360-31 of this chapter.
H. 
Development agreement required by § 360-32 of this chapter.
I. 
Two copies of construction plans for public improvements prepared by a registered professional engineer drawn on sheets measuring 24 inches by 36 inches showing the following:
(1) 
Conformity with the design standards specified in Article VIII of this chapter and the Borough construction standards.
(2) 
Street plan and profile of each street in the plan, including the terminus of all streets in the plan and any area beyond the limits of the plan where grading is proposed to construct the street. Street plan and profile drawings shall include all drainage easements over property, location of catch basins, inlets, manholes, headwalls and endwalls of the stormwater system. Top and invert elevations shall be shown along with the pipe size. Profile of storm sewer pipes shall show any crossing sanitary sewer lines, water lines or other utility lines. Lot lines and lot numbers shall be included in the street plan view.
(3) 
At least three cross sections at intervals not to exceed 100 feet and extending 50 feet on each side of the street center line or 25 feet outside of the street right-of-way, or to the limits of grading, whichever is greater.
(4) 
Sanitary sewer plan and profile drawing which shall include lot lines and lot numbers on the plan view. The location of the sanitary sewers, manholes and location of each "Y" proposed for installation shall be shown. The grade line, distance and pipe size of each line shall be indicated on the plan and profile. The top and invert elevation of each manhole plus pipe invert grades at fifty foot intervals shall be provided.
(5) 
All construction drawings shall be prepared according to accepted engineering practice.
J. 
Final grading plan which demonstrates compliance with all requirements for grading and excavating enacted by the Borough.
K. 
Plans showing compliance with recommendations of the Soils Report or Wetlands Delineation Report, if applicable.
L. 
Final design of stormwater management facilities and final calculations as required by § 360-88A of this chapter.
A. 
Planning Committee recommendation.
(1) 
At the first regular meeting of the Planning Committee after submission of a final application, the Planning Committee shall either accept or reject the application as complete and properly filed. The date of the Planning Committee meeting at which the final application is accepted as complete and properly filed shall be the official date of filing for the application and shall represent the beginning of the sixty-day period for Planning Committee review and recommendation on the application, unless the applicant agrees, in writing, to an extension of time. During the sixty-day review period, the Borough Engineer shall provide review comments to the Planning Committee and the applicant.
(2) 
Within 60 days of the official date of filing of the application, the Planning Committee shall make a recommendation, in writing, to Borough Council for approval, approval with conditions or disapproval of the final application. In the case of a recommendation for disapproval, the Planning Committee recommendation shall cite the specific requirements of this chapter which have not been met.
B. 
Action by Borough Council.
(1) 
The Borough Engineer shall present a written report to Borough Council which states whether the application complies with the requirements of this chapter and that report shall be included in the minutes of the Council meeting.
(2) 
Within 90 days of the official date of filing of the application, Borough Council shall take one of the following actions: approve, approve with conditions, or disapprove the final application at a public meeting. The Planning Committee's written recommendation shall be made a part of the record at that meeting.
(3) 
A letter indicating approval, approval with conditions or disapproval shall be mailed to the applicant within 15 days of the date of the decision by Borough Council. If the final application is not approved, Borough Council shall specify the defects found in the final application and cite the requirements of this chapter which have not been met.
C. 
Conditional approval. If Borough Council determines that certain conditions are warranted to be attached to final approval to protect the public interest and guarantee compliance with the requirements of this chapter, the conditions of approval shall be specified, in writing, in the notice of conditional approval required by § 360-27B of this chapter. The applicant shall accept or reject the conditions attached to final approval either by giving written notice to the Borough Secretary or by executing the development agreement required by § 360-32 of this chapter within 30 days of the date of the meeting of Borough Council at which final approval is granted. If the applicant rejects any of the conditions or if the applicant fails to give written notice to the Borough Secretary regarding acceptance or rejection of the conditions attached to final approval or execute the development agreement within the required 30 days, final approval shall automatically be rescinded without written notice to the applicant.
D. 
Deemed approval. Failure of Borough Council to render a decision and communicate it to the applicant within the time and in the manner prescribed by this chapter shall be deemed an approval of the application in the terms as presented, unless the applicant has agreed in writing to an extension of time or change in the prescribed manner of presentation of communication of the decision, in which case, failure to meet the extended time or change in manner of presentation of communication shall have like effect.
E. 
Phased approval.
(1) 
In the case where development of a major subdivision is projected over a period of years, the Borough authorizes submission of final applications by sections or phases of development, subject to such requirements or guarantees for public improvements in future sections or phases of the development which are essential for the protection of the public welfare and any existing or proposed section or phase of the plan.
(2) 
All sections or phases shall conform to the preliminary application as previously approved by the Borough. Any phase that contains substantive changes in the number of lots or buildings proposed or in the layout of the lots, buildings or streets previously approved in the preliminary application shall require complete resubmission of the preliminary application in accordance with §§ 360-22, 360-23 and 360-24 of this chapter.
A. 
The Borough may offer the mediation option as an aid in completing the proceedings authorized by this article. Mediation shall supplement, not replace, those procedures in this article once they have been formally initiated. Nothing in this section shall be interpreted as expanding or limiting the Borough's police powers or as modifying any principles of substantive law.
B. 
Participation in mediation shall be wholly voluntary. The appropriateness of mediation shall be determined by the particulars of each case and the willingness of the parties to negotiate. In offering the mediation option, the Borough shall assure that in each case, the mediating parties, assisted by the mediator as appropriate, develop terms and conditions for:
(1) 
Funding mediation.
(2) 
Selecting a mediator who, at a minimum, shall have a working knowledge of municipal zoning and subdivision procedures and demonstrated skills in mediation.
(3) 
Completing mediation, including time limits for such completion.
(4) 
Suspending time limits otherwise authorized in this chapter or in the Pennsylvania Municipalities Planning Code (Act 247 of 1968, as amended), provided there is written consent by the mediating parties, and by the applicant or Borough Council, if either is not a party to the mediation.
(5) 
Identifying all parties and affording them the opportunity to participate.
(6) 
Subject to legal restraints, determining whether some or all of the mediation sessions shall be open or closed to the public.
(7) 
Assuring that mediated solutions are in writing and signed by the parties, and become subject to review and approval by Borough Council pursuant to the procedures for approval set forth in this article.
C. 
No offers or statements made in the mediation sessions, excluding the final written mediated agreement, shall be admissible as evidence in any subsequent judicial or administrative proceedings.
When requested by the developer, in order to facilitate financing, Borough Council shall furnish the developer with a signed copy of a resolution indicating approval of the final plat contingent upon the developer executing the development agreement and posting any required performance bond. The final plat shall not be signed nor recorded until the performance bond is posted and the development agreement is executed. The resolution shall expire and be deemed to be revoked if the performance bond is not posted and the development agreement is not executed within 90 days, unless a written extension is granted by Borough Council. Such extension shall not be unreasonably withheld and shall be placed in writing at the request of the developer.
A. 
In lieu of the completion of any improvement required prior to and as a condition for final approval of a plat, the applicant shall deposit a performance bond, as defined by this chapter, in favor of the Borough, in an amount equal to 110% of the cost of completion of the improvements estimated as of 90 days following the date scheduled for completion by the developer. The surety company or lending institution holding the performance bond shall notify the Borough Secretary by certified mail at least 30 days prior to the expiration of the performance bond.
B. 
Annually, the Borough may adjust the amount of the performance bond by comparing the actual cost of the improvements which have been completed and the estimated cost for the completion of the remaining improvements as of the expiration of the 90th day after either the original date scheduled for completion of a rescheduled date of completion. Subsequent to said adjustment, the Borough may require the developer to post additional security in order to assure that the performance bond equals said 110%. Any additional security shall be posted by the developer in accordance with this § 360-30.
C. 
The amount of the performance bond required shall be based upon a written estimate of the cost of completion of the required improvements, submitted by an applicant or developer and prepared by an engineer and certified by such engineer to be a fair and reasonable estimate of such cost. The Borough, upon the recommendation of the Borough Engineer, may refuse to accept such estimate for good cause shown. If the applicant or developer and the Borough are unable to agree upon an estimate, then the estimate shall be recalculated and recertified by another engineer chosen mutually by the Borough and the applicant or developer. The estimate certified by the third engineer shall be presumed fair and reasonable, and shall be the final estimate. In the event that a third engineer is so chosen, fees for the services of said engineer shall be paid equally by the Borough and the applicant or developer.
D. 
If the party posting the performance bond requires more than one year from the date of posting of the performance bond to complete the required improvements, the Borough may increase the amount of the performance bond an additional 10% for each one-year period beyond the first anniversary date from posting of the performance bond or to an amount not exceeding 110% of the cost of completing the required improvements as reestablished on or about the expiration of the preceding one-year period by using the above procedure.
In all subdivisions or land developments where private improvements are required by this chapter or are voluntarily provided by the developer, an amenities bond shall be required. The procedure for posting the amenities bond shall be the same as that required by § 360-30 of this chapter for posting a performance bond, except that the estimate of the cost of completion of the required private improvements shall be prepared by the applicant's or developer's engineer and shall be certified by such engineer to be a fair and reasonable estimate of such costs. The Borough, upon the recommendation of the Borough Engineer, may refuse to accept such estimate for good cause shown. Disputes shall be resolved in accordance with the procedure specified in § 360-30.
A. 
As a condition of granting final approval of a subdivision or land development that requires the posting of a performance bond or an amenities bond or to which conditions are attached to the grant of final approval, Borough Council shall require that the developer: a) execute a development agreement with the Borough, in a form acceptable to the Borough Solicitor, containing any conditions attached to the approval of the plan and provisions that are reasonably required to guarantee the proper installation of public and private improvements related to the subdivision and/or land development and provisions necessary to indemnify the Borough in connection therewith; and b) pay all required application filing, review and inspection fees required under § 360-100 of this chapter.
B. 
Said agreement shall be executed, the required performance bond or amenities bond shall be posted and all required fees shall be paid before the Borough Secretary shall affix his or her signature and the Borough's Seal to the final plat for recording purposes.
C. 
In the event that the development agreement is not executed within the 90 days required for recording of the final plat, approval of the final plat shall expire, unless approval is reinstated as provided for in § 360-34.
Upon approval of a final plat by the Borough, the developer shall, within 90 days of such final approval or 90 days after the date of delivery of an approved plat signed by the governing body following completion of conditions imposed for approval, whichever is later, record such plat in the Allegheny County Department of Real Estate (formerly known as the Office of the Allegheny County Recorder of Deeds).
A. 
In the event that the plan has not been recorded within the required 90 days, the Borough Secretary is authorized to reinstate the signatures of the proper officers of the Borough indicating approval, provided there are no changes in the major subdivision previously granted approval and all the requirements of this chapter regarding posting of a performance bond or amenities bond and execution of a development agreement have been met and, further, provided the plan is submitted for reinstatement of approval within 180 days following the date of the original final approval by Borough Council.
B. 
Any request for reinstatement of final approval which is submitted after 180 days from the date of the original granting of final approval by Borough Council shall be required to resubmit an application for final approval in conformance with the requirements of §§ 360-25 through 360-35 of this chapter.
Within 90 days of the date of recording of the final plat in the Allegheny County Department of Real Estate (formerly known as the Office of the Allegheny County Recorder of Deeds), the applicant shall deliver to the Borough Secretary one Mylar and three paper prints of the final plat as recorded, containing all required signatures and dates of approval.