[Ord. 2010-3, 12/16/2010, § 1]
The fee required by this Part is the municipal review fee. The municipal review fee shall be established by Hummelstown Borough to defray review costs incurred by Hummelstown Borough and the Borough Engineer. The applicant shall pay all fees.
[Ord. 2010-3, 12/16/2010, § 1]
1. 
The fees required by this Part shall, at a minimum, cover:
A. 
Administrative and clerical costs.
B. 
Review of the SWM site plan and report by Hummelstown Borough.
C. 
Pre-construction meetings.
D. 
Inspection of stormwater management facilities/BMPs and drainage improvements during construction.
E. 
Final inspection upon completion of the stormwater management facilities/BMPs and drainage improvements presented in the SWM site plan.
F. 
Any additional work required to enforce any permit provisions regulated by this Part, correct violations, and assure proper completion of stipulated remedial actions.
[Ord. 2010-3, 12/16/2010, § 1]
1. 
The owner of any land upon which permanent BMPs will be placed, constructed, or implemented, as described in the SWM site plan, shall record the following documents in the Office of the Recorder of Deeds of Dauphin County, within 30 days of approval of the SWM site plan by Hummelstown Borough:
A. 
The SWM site plan.
B. 
Operations and maintenance (O&M) agreement (Appendix A).
C. 
Easements under § 26-141.
2. 
Hummelstown Borough may suspend or revoke any approvals granted for the project site upon discovery of the failure of the owner to comply with this Section.