[Ord. No. 2020-04, 10/1/2020]
When requested by the Township or the Director of Public Works,
a user must submit information on the nature and characteristics of
its wastewater within 90 days of the request. The Township Engineer
and the Director of Public Works are authorized to prepare a form
for this purpose and may periodically require users to update this
information.
[Ord. No. 2020-04, 10/1/2020]
1. Users Required to Obtain Permit.
A. Significant Industrial Users. No significant industrial user shall discharge wastewater into the sewerage system without first obtaining a wastewater discharge permit from the Township and the Director of Public Works, except that a significant industrial user that has filed a timely application pursuant to Subsection
2B may continue to discharge for the time period specified therein.
B. Other Users. The Township or the Director of Public Works may require
other users to obtain wastewater discharge permits as necessary to
carry out the purposes of this chapter.
2. Time by Which Permit Is Required.
A. Existing Connections. Any user required to obtain a wastewater discharge permit who was discharging wastewater into the sewerage system prior to the effective date of this section and who wishes to continue such discharges in the future shall, within 90 days after said date, apply to the Township and the Director of Public Works for a wastewater discharge permit in accordance with §
18-703, and shall not cause or allow discharges to the sewerage system to continue after 180 days following the effective date of this section except in accordance with a wastewater discharge permit issued by the Township and the Director of Public Works.
B. New Connections. Any user required to obtain a wastewater discharge permit who proposes to begin or recommence discharging into the sewerage system must obtain such permit prior to the beginning or recommencing of such discharge. An application for this wastewater discharge permit, in accordance with §
18-703, must be filed at least 90 days prior to the date upon which any discharge will begin or recommence.
3. Violations of Permits. Any violation of the terms and conditions
of a wastewater discharge permit shall be deemed a violation of this
chapter and subjects the wastewater discharge permittee to the sanctions
set out in Parts 12 and 15.
4. Other Legal Obligations. Obtaining a wastewater discharge permit
does not relieve a permittee of its obligation to comply with all
federal and state pretreatment standards or requirements or with any
other requirement of federal, state, or local law.
[Ord. No. 2020-04, 10/1/2020]
1. Contents of Application. All users required to obtain a wastewater
discharge permit must submit a permit application. The Township and
the Director of Public Works may require all users to submit as part
of an application the following information:
A. All information required by §
18-801, Subsection
3.
B. Contact information of the operator and the owner.
C. Description of activities, facilities, and plant processes on the
premises, including a list of all raw materials and chemicals used
or stored at the facility which are, or could accidentally or intentionally
be, discharged to the sewerage system and the POTW.
D. Number and type of employees and proposed or actual hours of operation.
E. Each product produced by type, amount, process or processes, and
rate of production.
F. Type and amount of raw materials processed (average and maximum per
day).
G. Site plans, floor plans, mechanical and plumbing plans, and details
to show all sewers, floor drains, and appurtenances by size, location,
and elevation, and all points of discharge.
H. Time and duration of discharges.
I. The location for monitoring all wastes covered by the permit.
J. Any other information as may be deemed necessary by the Township
or the Director of Public Works to evaluate the wastewater discharge
permit application.
K. Incomplete or inaccurate applications will not be processed and will
be returned to the user for revision.
2. Signatures and Certification.
A. All wastewater discharge permit applications must be signed by an
authorized representative of the user and contain the following certification
statement:
"I certify under penalty of law that this document and all attachments
were prepared under my direction or supervision in accordance with
a system designed to assure that qualified personnel properly gather
and evaluate the information submitted. Based on my inquiry of the
person or persons who manage the system, or those persons directly
responsible for gathering the information, the information submitted
is, to the best of my knowledge and belief, true, accurate, and complete.
I am aware that there are significant penalties for submitting false
information, including the possibility of fine and imprisonment for
knowing violations."
B. If the designation of an authorized representative is no longer accurate
because a different individual or position has responsibility for
the overall operation of the facility or overall responsibility for
environmental matters for the company, a new written authorization
satisfying the requirements of this section must be submitted to the
Township prior to or together with any reports to be signed by an
authorized representative.
C. A facility determined to be a nonsignificant categorical industrial
user by the Township or the Director of Public Works pursuant to this
chapter must annually submit the signed above certification statement.
[Ord. No. 2020-04, 10/1/2020]
1. Decisions on Permit Applications. The Township and the Director of
Public Works will evaluate the data furnished by the user and may
require additional information. Within 60 days of receipt of a complete
wastewater discharge permit application, the Township and the Director
of Public Works will determine whether or not to issue a wastewater
discharge permit. The Township and the Director of Public Works may
deny any application for a wastewater discharge permit. The Township
or the Director of Public Works shall provide public notice of the
issuance of a wastewater discharge permit.
2. Petition for Reconsideration. Any person, including the user, may
petition the Township and the Director of Public Works to reconsider
the terms of a wastewater discharge permit, within 30 days after notice
of its issuance. Failure to submit a timely petition for reconsideration
shall be deemed to be a waiver of the administrative appeal. In its
petition, the appealing party must indicate the wastewater discharge
permit provisions objected to, the reasons for this objection, and
the alternative condition, if any, it seeks to place in the wastewater
discharge permit. If the Township and the Director of Public Works
fail fall to act within 30 days after the filing of a petition for
reconsideration, the request for reconsideration shall be deemed to
be denied.
3. No Stay Pending Reconsideration. The effectiveness of a wastewater
discharge permit shall not be stayed pending a decision on a request
for reconsideration.
4. Final Administrative Decisions. Decisions not to reconsider a wastewater discharge permit, not to issue a wastewater discharge permit, or not to modify a wastewater discharge permit shall be considered final administrative decisions. Aggrieved parties seeking review of administrative decisions may do so in accordance with §
18-1803, and applicable City ordinances and state law.
[Ord. No. 2020-04, 10/1/2020]
1. In General. A wastewater discharge permit shall be issued for a specified
time period, not to exceed five years from the effective date of the
permit. A wastewater discharge permit may be issued for a period less
than five years, at the discretion of the Township and the Director
of Public Works. Each wastewater discharge permit will indicate a
specific date upon which it will expire.
2. Cessation of Operations or Transfer of Ownership. Wastewater discharge
permits shall be voidable upon cessation of operations or transfer
of business ownership.
3. Replacement. All wastewater discharge permits issued to a particular
user are void upon the issuance of a new wastewater discharge permit
to that user.
[Ord. No. 2020-04, 10/1/2020]
1. In General. A wastewater discharge permit shall include such conditions
as are deemed reasonably necessary by the Township and the Director
of Public Works to prevent pass through or interference, protect the
quality of the water body receiving the treatment plant's effluent,
protect worker health and safety, facilitate sludge management and
disposal, and protect against damage to the POTW.
2. Required Provisions. Wastewater discharge permits must contain:
A. A statement that indicates wastewater discharge permit duration,
which in no event shall exceed five years.
B. A statement that the wastewater discharge permit is nontransferable without prior notification to the Township and the City in accordance with §
18-708, and provisions for furnishing the new owner or operator with a copy of the existing wastewater discharge permit.
C. Effluent limits based on applicable pretreatment standards.
D. Self-monitoring, sampling, reporting, notification, and recordkeeping
requirements. These requirements shall include an identification of
pollutants to be monitored, sampling location, sampling frequency,
and sample type based on federal, state, and local law.
E. A statement of applicable civil and criminal penalties for violation
of pretreatment standards and requirements, and any applicable compliance
schedule. Such schedule may not extend the time for compliance beyond
that required by applicable federal, state, or local law.
F. Requirements to control slug discharge, if determined by the Director
of Public Works to be necessary.
3. Optional Provisions. Wastewater discharge permits may contain, but
need not be limited to, the following conditions:
A. Limits on the average and/or maximum rate of discharge, time of discharge,
and/or requirements for flow regulation and equalization.
B. Requirements for the installation of pretreatment technology, pollution
control, or construction of appropriate containment devices, designed
to reduce, eliminate, or prevent the introduction of pollutants into
the treatment works.
C. Requirements for the development and implementation of spill control
plans or other special conditions, including management practices
necessary to adequately prevent accidental, unanticipated, or nonroutine
discharges.
D. Development and implementation of waste minimization plans to reduce
the amount of pollutants discharged to the POTW.
E. The unit charge or schedule of user charges and fees for the management
of the wastewater discharged to the POTW.
F. Requirements for installation and maintenance of inspection and sampling
facilities and equipment, including flow measurement devices.
G. A statement that compliance with the wastewater discharge permit
does not relieve the permittee of responsibility for compliance with
all applicable federal, state, and local pretreatment standards, including
those which become effective during the term of the wastewater discharge
permit.
H. Other conditions as deemed appropriate by the Township or the Director
of Public Works to ensure compliance with this chapter and federal,
state, and local laws, rules, and regulations.
[Ord. No. 2020-04, 10/1/2020]
1. The Township and the Director of Public Works may modify a wastewater
discharge permit for good cause, including, but not limited to, the
following reasons:
A. To incorporate any new or revised federal, state, or local pretreatment
standards or requirements.
B. To address significant alterations or additions to the user's operation,
process, or wastewater volume or character since the time of wastewater
discharge permit issuance.
C. To address a change in the POTW that requires either a temporary
or permanent reduction or elimination of the authorized discharge.
D. To respond to information indicating that the permitted discharge
poses a threat to the POTW, personnel, or the receiving waters.
E. Due to a violation of any terms or conditions of the wastewater discharge
permit.
F. Due to misrepresentations or the failure to fully disclose all relevant
facts in the wastewater discharge permit application or in any required
reporting.
G. Due to a revision of or a grant of variance from categorical pretreatment
standards pursuant to 40 CFR 403.13.
H. To correct typographical or other errors in the wastewater discharge
permit.
I. To reflect a transfer of the facility ownership or operation to a new owner or operator, provided that the permit is transferable under §
18-708.
[Ord. No. 2020-04, 10/1/2020]
1. Wastewater discharge permits may be transferred to a new owner or
operator only if the permittee gives at least 90 days' advance notice
to the Township and the Director of Public Works, and the Township
and the Director of Public Works approves the wastewater discharge
permit transfer. Failure to provide advance notice of a transfer renders
the wastewater discharge permit void as of the date of the facility
transfer. The notice must include a written certification by the new
owner or operator which:
A. States that the new owner and/or operator has no immediate intent
to change the facility's operations and processes.
B. Identifies the specific date on which the transfer is to occur.
C. Acknowledges full responsibility for complying with the existing
wastewater discharge permit.
[Ord. No. 2020-04, 10/1/2020]
1. The Township or the Director of Public Works may revoke a wastewater
discharge permit for good cause, including, but not limited to, the
following reasons:
A. Failure to notify the Township and the Director of Public Works of
significant changes to the wastewater prior to the changed discharge.
B. Failure to provide prior notification to the Township and the Director of Public Works of changed conditions pursuant to §
18-805.
C. Misrepresentation or failure to fully disclose all relevant facts
in the wastewater discharge permit application.
D. Falsifying self-monitoring reports.
E. Tampering with monitoring equipment.
F. Refusing to allow the Township or the Director of Public Works timely
access to the facility premises and records.
G. Failure to meet effluent limitations.
I. Failure to pay sewer charges.
J. Failure to meet compliance schedules.
K. Failure to complete a wastewater survey or the wastewater discharge
permit application.
L. Failure to provide advance notice of the transfer of business ownership
of a permitted facility.
M. Violation of any pretreatment standard or requirement, or any terms
of the wastewater discharge permit or this chapter.
[Ord. No. 2020-04, 10/1/2020]
A user with an expiring wastewater discharge permit shall apply for wastewater discharge permit reissuance by submitting a complete permit application, in accordance with §
18-702, a minimum of 180 days prior to the expiration of the user's existing wastewater discharge permit.
[Ord. No. 2020-04, 10/1/2020]
1. If another municipality, or user located within another municipality,
contributes wastewater to the POTW, the City shall enter into an intermunicipal
agreement with the contributing municipality.
2. Prior to entering into an agreement required by Subsection
1, above, the Director of Public Works shall request the following information from the contributing municipality:
A. A description of the quality and volume of wastewater discharged
to the POTW by the contributing municipality;
B. An inventory of all users located within the contributing municipality
that are discharging to the POTW; and
C. Such other information as the Director of Public Works may deem necessary.
3. An intermunicipal agreement, as required by Subsection
1 above, shall contain the conditions:
A. A requirement for the contributing municipality to adopt a sewer use ordinance which is at least as stringent as this chapter and local limits, including required baseline monitoring reports (BMRs) which are at least as stringent as those set out in §
18-801 of this chapter. The requirement shall specify that such ordinance and limits must be revised as necessary to reflect changes made to the City's Ordinance or local limits;
B. A requirement for the contributing municipality to submit a revised
user inventory on at least an annual basis;
C. A provision specifying which pretreatment implementation activities,
including wastewater discharge permit issuance, inspection and sampling,
and enforcement, will be conducted by the contributing municipality;
which of these activities will be conducted by the Director of Public
Works; and which of these activities will be conducted jointly by
the contributing municipality and the Director of Public Works;
D. A requirement for the contributing municipality to provide the Township
and the Director of Public Works with access to all information that
the contributing municipality obtains as part of its pretreatment
activities;
E. Requirements for monitoring the contributing municipality's discharge;
F. A provision ensuring the Township and the Director of Public Works
access to the facilities of users located within the contributing
municipality's jurisdictional boundaries for the purpose of inspection,
sampling, and any other duties deemed necessary by the Township and
the Director of Public Works; and
G. A provision specifying remedies available for breach of the terms
of the intermunicipal agreement.