Street
|
Activity
|
Description
|
Ord./Res.
|
Date
|
---|---|---|---|---|
336 Extension
|
Maintaining
|
Res. 6-1964
|
5/18/1964
| |
340 Extension North and South
|
Maintaining
|
Res. 6-1964
|
5/18/1964
| |
437 Extension
|
Maintaining
|
Res. 6-1964
|
5/18/1964
| |
439 Extension
|
Maintaining
|
Res. 6-1964
|
5/18/1964
| |
Aberdeen Drive
|
Accepting
|
Hankey Farms Plan No. 3
|
Ord. 56
|
11/2/1961
|
Acorn Lane
|
Accepting and dedicating
|
In the Point West Plan of Lots, Phase 13
|
Res. 3-17
|
3/14/2017
|
Anchor Court
|
Accepting and dedicating
|
In the Seabright Plan of Lots, Phases 3 and 4
|
Res. 22-14
|
8/26/2014
|
Andreaina Lane
|
Maintaining
|
Res. 6-1964
|
5/18/1964
| |
Andrew Drive
|
Accepting
|
In the Development of Metro Property Developers
|
Res. 4-1998
|
8/25/1998
|
Azalea Drive
|
Accepting
|
Holly Hill Phase 2 Plan of Lots
|
Res. 3-2003
|
5/27/2003
|
Back Street
|
Accepting and dedicating
|
From Grove Street to Wall Street
|
Ord. 88
|
4/7/1967
|
Baldwin Street
|
Accepting and dedicating
|
From State Route 30 to Dead-End
|
Ord. 88
|
4/7/1967
|
Bantam Road
|
Accepting
|
Hankey Farms Plan No. 2
|
Ord. 51
|
11/3/1960
|
Beaver Run Drive
|
Accepting
|
In the Waldon Woods Plan of Lots
|
Res. 5-1996
|
3/26/1996
|
Bowland Street
|
Accepting
|
H.W. Robbins Plan of Lots
|
Ord. 54
|
9/7/1961
|
Bozik Lane
|
Maintaining
|
Res. 6-1964
|
5/18/1964
| |
Briar Path
|
Improving
|
Having a centerline distance 304 feet or 0.15 miles from Forest
Glen to the southeast corner of Lot No. 332 in said Plan of lots
|
Res. 21-1981
|
11/1/1981
|
Bridal Lane
|
Accepting and dedicating
|
Fayette Farms PRD, Phases 1-A, 1-B, 1-C, 2A-1, 2A-2, 2-C, 2-C-2,
3-C and 4
|
Res. 21-18
|
10/9/2018
|
Briar Path
|
Accepting
|
From the southeast corner of Lot 332, 640 feet to the center
of the south boundary of Lot 427.
|
Res. 14-1989B
|
9/12/1989
|
Brooketree Court
|
Accepting
|
In the Development of the Brooketree Plan of Lots
|
Res. 10-1999
|
11/23/1999
|
Butternut Drive
|
Accepting and dedicating
|
In the Point West Phase 6 and portions of Phase 7 Plan of Lots
|
Res. 10-14
|
2/25/2014
|
California Hollow Road
|
Transferring
|
From Station 118+29 to Station 170+92
|
Res. 14-1983
|
12/20/1983
|
Calumet Court
|
Accepting and dedicating
|
Fayette Farms PRD, Phase 11
|
Res. 85-23
|
12/12/2023
|
Canterbury Driver
|
Accepting and dedicating
|
The Canterbury Woods, Phase 1
|
Res. 22-18
|
10/9/2018
|
Carolina Drive
|
Accepting
|
Glen Gormley Farm Plan
|
Ord. 55
|
10/10/1961
|
Carolina Drive
|
Accepting and dedicating
|
From Dead-End to Dead-End
|
Ord. 88
|
4/7/1967
|
Carolyn Drive
|
Accepting
|
In the Matters Plan of Lots.
|
Ord. 14
|
5/5/1955
|
Center Street
|
Accepting and dedicating
|
From Grove Street to Wall Street
|
Ord. 88
|
4/7/1967
|
Chauvet Drive
|
Accepting
|
In the Development of Metro Property Developers
|
Res. 5-2000
|
7/25/2000
|
Chelsea Drive
|
Accepting
|
In the Development of the Chelsea Glen Plan of Lots
|
Res. 5-2007
|
6/12/2007
|
Chestershire Drive
|
Accepting
|
Hankey Farms Plan Nos. 2, 4, and 5
|
Ord. 51
|
11/3/1960
|
Chestnut Street
|
Accepting
|
Beginning at the intersection of said street with Stop Street,
N. W. to Hoffman Avenue in said plan
|
Ord. 16
|
7/7/1955
|
Clyde Penberthy Road
|
Maintaining
|
Res. 6-1964
|
5/18/1964
| |
Commodore Drive
|
Accepting and dedicating
|
In the Seabright Plan of Lots No. 1, in the first revision to
the Seabright Plan of Lots No. 1, in the Seabright Plan of Lots No.
2, and in the first revision to the Seabright Plan of Lots No. 2
|
Res. 22-14
|
8/26/2014
|
Compass Court
|
Accepting and dedicating
|
In the Seabright Plan of Lots No. 1, and in the Seabright Plan
of Lots, Phases 3 and 4
|
Res. 22-14
|
8/26/2014
|
Couch Alley
|
Maintaining
|
Res. 6-1964
|
5/18/1964
| |
Cove Court
|
Accepting and dedicating
|
In the Seabright Plan of Lots No. 1, and in the Seabright Plan
of Lots, Phases 3 and 4
|
Res. 22-14
|
8/26/2014
|
Crawford Street
|
Maintaining
|
Res. 6-1964
|
5/18/1964
| |
Crossroads Drive
|
Accepting
|
Res. 13-1997
|
10/14/1997
| |
Darlene Drive
|
Accepting
|
In the Matters Plan of Lots.
|
Ord. 14
|
5/5/1955
|
Davis Avenue
|
Accepting
|
Beginning at its intersection with the westerly side of Cliff
Mine Road at the northeasterly corner of property of W.T. McKenzie
|
Ord. 15
|
6/2/1955
|
Dawn Street
|
Accepting and dedicating
|
From Ivy Street to L.R. 02011
|
Ord. 88
|
4/7/1967
|
Derby Lane
|
Accepting and dedicating
|
Fayette Farms PRD, Phase 7
|
Res. 32-21
|
6/22/2021
|
Derby Lane
|
Accepting and dedicating
|
Fayette Farms PRD, Phase 9
|
Res. 34 -21
|
6/22/2021
|
Deer Run Drive
|
Accepting
|
In the Waldon Woods Plan of Lots
|
Res. 5-1996
|
3/26/1996
|
Dempe Street
|
Accepting and dedicating
|
From L.R. 02246 to L.R. 02246
|
Ord. 88
|
4/7/1967
|
Dixie Drive
|
Accepting and dedicating
|
From L.R. 681 to Old Lincoln Hwy.
|
Ord. 88
|
4/7/1967
|
Dupont Drive
|
Accepting and dedicating
|
Portions within the Point West Plan of Lots, Phases 9, 10, 11
and 12A
|
Res. 3-17
|
3/14/2017
|
Dupont Drive
|
Accepting and dedicating
|
Portions of Pointe-West Phase 12B Subdivisions Plan
|
Res. 51-21
|
11/9/2021
|
Easton Lane
|
Accepting
|
As a resolution road beginning on Pinkerton Run Road to a point
extending back from said road for a distance of 1,380 feet being 12.5
feet wide throughout
|
Res. 25-1981
|
11/10/1981
|
Elk Rush Drive
|
Accepting
|
Development of Redwood Estates
|
Res. 1-2002
|
3/12/2002
|
Elk Rush Drive
|
Accepting
|
In the Developments developed by Timberglen Limited and Redwood
Estates Limited
|
Res. 9-1998
|
12/8/1998
|
Emily Lane
|
Accepting
|
Beginning on Noblestown Road to a point extending back from
said road for a distance of 480 feet, being 20 feet wide throughout
|
Res. 4-1980
|
5/13/1980
|
Ethel Street
|
Accepting and dedicating
|
From L.R. 02246 to Frances Street
|
Ord. 88
|
4/7/1967
|
Fairfield Lane
|
Accepting
|
In the Point West Phase 2 Plan of Lots
|
Res. 16-2007
|
12/20/2007
|
Fairfield Lane
|
Accepting and dedicating
|
Past Woodbriar, in the Point West Phase 4 Plan of Lots
|
Res. 9-14
|
2/25/2014
|
Farmcrest Dive
|
Accepting
|
In the Development of the Brooketree Plan of Lots
|
Res. 10-1999
|
11/23/1999
|
Farmcrest Drive
|
Accepting
|
Including the intersection with Palamino Drive being the portion
of said Farmcrest Drive abutted by Lots 617 to 624, both included
Lots 752 to 757
|
Ord. 68
|
7/11/1963
|
Fayette Street
|
Vacating
|
24 foot passes through the property owned by Frank Ergen, being
part of lots Nos. 43 and 44 in the Marshall Amended Plan of Lots
|
Ord. 2
|
8/7/1952
|
Fayette Street
|
Accepting and dedicating
|
From State Route 30 to Dead-End
|
Ord. 88
|
4/7/1967
|
Fayette Street
|
Vacating
|
From Patterson Street to TR-30, also known as LR-538
|
Ord. 136
|
5/24/1977
|
Fern Drive
|
Accepting
|
Holly Hill Phase 3 Plan of Lots
|
Res. 3-2003
|
5/27/2003
|
Finks Run Road
|
Transferring
|
From Station 132+86 to Station 249+52
|
Res. 14-1983
|
12/20/1983
|
First Street
|
Accepting and dedicating
|
From L.R. 02246 to Dead-End
|
Ord. 88
|
4/7/1967
|
Florida Drive
|
Accepting
|
Glen Gormley Farm Plan
|
Ord. 85
|
8/18/1966
|
Florida Drive
|
Accepting and dedicating
|
From Dead-End to Dead-End
|
Ord. 88
|
4/7/1967
|
Forest Glen
|
Improving
|
Having a centerline distance of 2,767 feet or 0.33 miles from
Logan Road to the northwest corner of Lot No. 324 in said plan of
lots
|
Res. 21-1981
|
11/1/1981
|
Forest Glen
|
Accepting
|
From the northwest corner of Lot 324, 671 feet to the northeast
corner of Lot 452
|
Res. 14-1989B
|
9/12/1989
|
Forest Glen
|
Accepting
|
From Walden Way to the turnaround (in the Developments developed
by Timberglen Limited and Redwood Estates Limited)
|
Res. 9-1998
|
12/8/1998
|
Fox Chase
|
Improving
|
Having a centerline distance of 25 feet from Walden Way to the
northeast corner of Lot No. 340 in said plan of lots
|
Res. 21-1981
|
11/1/1981
|
Fox Chase Drive
|
Accepting
|
In the Waldon Woods Plan of Lots
|
Res. 5-1996
|
3/26/1996
|
Frances Street
|
Accepting and dedicating
|
From Ethel Street to Trailor Street
|
Ord. 88
|
4/7/1967
|
Gateway Drive
|
Accepting and dedicating
|
Point West Plan of Lots, Phase 9
|
Res. 3-17
|
3/14/2017
|
Gay Street
|
Accepting and dedicating
|
From Sitarik Road to Ivy Street
|
Ord. 88
|
4/7/1967
|
Glenn Street
|
Accepting
|
H.W. Robbins Plan of Lots
|
Ord. 54
|
9/7/1961
|
Gormley Street
|
Accepting and dedicating
|
From Oakdale Borough Line to Dead-End
|
Ord. 88
|
4/7/1967
|
Grace Street
|
Accepting and dedicating
|
From Montour Street to Dead-End
|
Ord. 88
|
4/7/1967
|
Green Meadow Drive Extension
|
Laying out
|
Ord. 258
|
9/3/1992
| |
Green Meadow Drive
|
Accepting
|
Development of Redwood Estates
|
Res. 1-2002
|
3/12/2002
|
Hakos Lane
|
Maintaining
|
Res. 6-1964
|
5/18/1964
| |
Half Crown Road
|
Vacating
|
From the Kelso Road right-of-way known as LR-396 to Seabright
Road known as LR-02340
|
Ord. 135
|
5/24/1977
|
Half Crown Road
|
Vacating
|
Right-of-way
|
Ord. 387
|
3/11/2008
|
Hall Hill
|
Maintaining
|
Res. 6-1964
|
5/18/1964
| |
Hankey Farms Drive
|
Accepting
|
Hankey Farms Plan No. 1
|
Ord. 44
|
6/2/1960
|
Hanna Plan Roads
|
Maintaining
|
Res. 6-1964
|
5/18/1964
| |
Harbor Drive
|
Accepting and dedicating
|
In the Seabright Plan of Lots No. 1, and in the Seabright Plan
of Lots, No. 2
|
Res. 22-14
|
8/26/2014
|
Harvester Court
|
Accepting
|
In the Development of the Brooketree Plan of Lots
|
Res. 10-1999
|
11/23/1999
|
Hemlock Court
|
Accepting
|
Holly Hill Phase 3 Plan of Lots
|
Res. 3-2003
|
5/27/2003
|
Hereford Road
|
Accepting
|
Hankey Farms Plan No. 1
|
Ord. 44
|
6/2/1960
|
Heritage Drive
|
Accepting and dedicating
|
Fayette Farms PRD, Phases 1-A, 1-B, 1-C, 2A-1, 2A-2, 2-C, 2-C-2,
3-C and 4
|
Res. 21-18
|
10/9/2018
|
Hickory Circle
|
Improving
|
Having a centerline from Pin Oak to cul-de-sac of 344 feet
|
Res. 21-1981
|
11/1/1981
|
Hill Place Drive
|
Accepting and dedicating
|
Point West Plan of Lots, Phases 13 and 14
|
Res. 3-17
|
3/14/2017
|
Hill Road
|
Accepting
|
From Station 0+00 to Station 69+07 (exclude 16 foot bridge at
Station 1+95)
|
Res. 11-1996
|
7/23/1996
|
Hilltop Circle
|
Accepting
|
Development of Redwood Estates
|
Res. 1-2002
|
3/12/2002
|
Hoffman Avenue
|
Accepting
|
Beginning at its intersection of State Street (Oakdale Road,
Route No. 02246), and extending to its intersection with Chestnut
Street.
|
Ord. 16
|
7/7/1955
|
Hollyberry Circle
|
Accepting and dedicating
|
Point West Plan of Lots, Phase 11
|
Res. 3-17
|
3/14/2017
|
Holly Hill Drive
|
Accepting
|
Holly Hill Phase 4 Plan of Lots
|
Res. 3-2003
|
5/27/2003
|
Holstein Road
|
Accepting
|
Hankey Farms Plan No. 2
|
Ord. 49
|
10/6/1960
|
Home Drive
|
Accepting
|
Development of Metro Property Developers
|
Res. 2-1999
|
1/12/1999
|
Horseshoe Drive
|
Accepting and dedicating
|
Fayette Farms PRD, Phase 7
|
Res. 32-21
|
6/22/2021
|
Horseshoe Drive
|
Accepting and dedicating
|
Fayette Farms PRD, Phase 8
|
Res. 33-21
|
6/22/2021
|
Horseshoe Drive
|
Accepting and dedicating
|
Fayette Farms PRD, Phase 11
|
Res. 85-23
|
12/12/2023
|
Horseshoe Drive
|
Accepting and dedicating
|
Fayette Farms PRD, Phase 12
|
Res. 86-23
|
12/12/2023
|
Ivy Street
|
Accepting and dedicating
|
From Dawn Street to Dead-End
|
Ord. 88
|
4/7/1967
|
Jeffrey Circle
|
Accepting
|
In the Development of the Jeffreytown Plan of Lots
|
Res. 9-2001
|
6/12/2001
|
Keebe Road
|
Maintaining
|
Res. 6-1964
|
5/18/1964
| |
Kelso Road
|
Transferring
|
From Station 0+00 to Station 132+86
|
Res. 6-1987
|
4/15/1987
|
Kelso Road
|
Transferring
|
From Station 18+95.33 to Station 131+70
|
Res. 10-1994
|
12/31/1987
|
Kramer Road
|
Maintaining
|
Res. 6-1964
|
5/18/1964
| |
Larrys Lane
|
Maintaining
|
Res. 6-1964
|
5/18/1964
| |
Leghorn Road
|
Accepting
|
Hankey Farms Plan No. 2
|
Ord. 45
|
3/3/1960
|
Leghorn Road
|
Accepting
|
Hankey Farms Plan No. 1
|
Ord. 44
|
6/2/1960
|
Lesnick Lane
|
Maintaining
|
Res. 6-1964
|
5/18/1964
| |
Lilac Court
|
Accepting
|
Holly Hill Plan of Lots
|
Res. 3-2003
|
5/27/2003
|
Locust Avenue
|
Accepting and dedicating
|
From L.R. 02246 to Dead-End
|
Ord. 88
|
4/7/1967
|
Look-Out Drive
|
Accepting and dedicating
|
From Florida Drive to Carolina Drive
|
Ord. 88
|
4/7/1967
|
Lookout Drive
|
Accepting
|
Glen Gormley Farm Plan
|
Ord. 85
|
8/18/1966
|
Lutz Road
|
Maintaining
|
Res. 6-1964
|
5/18/1964
| |
Maga Lane
|
Maintaining
|
Res. 6-1964
|
5/18/1964
| |
Main Street
|
Constructing bridge
|
Over Robinson Run, South Branch, connecting Main Street with
Nobelstown Road in the Village of Sturgeon
|
Ord. 10
|
9/2/1954
|
Margaretta Street
|
Accepting and dedicating
|
From L.R. 02246 to Dead-End
|
Ord. 88
|
4/7/1967
|
Market Place Drive
|
Accepting
|
In the Development of the A&R Plan of Lots #2
|
Res. 7-2006
|
5/23/2006
|
Marshall Street
|
Changing name
|
From Marshall Street to Resolution Road
|
Res. 8-1977
|
9/27/1977
|
Mayer Drive
|
Accepting
|
Glen Gormley Farm Plan
|
Ord. 55
|
10/10/1961
|
Mayer Drive
|
Accepting and dedicating
|
From Look-Out Drive to Carolina Drive
|
Ord. 88
|
4/7/1967
|
McGill Road
|
Vacating
|
Between Gamble Road and Noblestown Road
|
Ord. 351
|
5/27/2003
|
McKee Street
|
Accepting and dedicating
|
From Sturgeon Street to Margaretta Street
|
Ord. 88
|
4/7/1967
|
Midfield Circle Drive
|
Accepting
|
In the Point West Phase I Plan of Lots
|
Res. 13-2007
|
11/27/2007
|
Midfield Circle Drive
|
Accepting
|
In the Development of Pointe West
|
Res. 15-1997
|
10/14/1997
|
Mike Kress Road
|
Maintaining
|
Res. 6-1964
|
5/18/1964
| |
Mill Street
|
Accepting
|
Extending from its intersection with the easterly side of State
Street, (Oakdale Road, Route No. 02246), and extending eastwardly
to its intersection with Short Street
|
Ord. 16
|
7/7/1955
|
Montour Street
|
Accepting
|
Beginning at the intersection of said Montour with Gee Mine
Road and High Street
|
Ord. 19
|
11/23/1955
|
Montour Street
|
Accepting and dedicating
|
From L.R. 02015 to Grace Street
|
Ord. 88
|
4/7/1967
|
Montour West Boulevard
|
Accepting
|
In the Montour West Industrial Park
|
Ord. 107
|
6/30/1972
|
Moose Head Drive
|
Accepting
|
In the Developments developed by Timberglen Limited and Redwood
Estates Limited
|
Res. 9-1998
|
12/8/1998
|
Multiflora Drive
|
Accepting and dedicating
|
In the Point West Phase 6 Plan of Lots
|
Res. 10-14
|
2/25/2014
|
Nadick Lane
|
Maintaining
|
Res. 6-1964
|
5/18/1964
| |
New World Extension
|
Maintaining
|
Res. 6-1964
|
5/18/1964
| |
Nobelstown Road
|
Constructing bridge
|
Over Robinson Run, South Branch, connecting Main Street with
Nobelstown Road in the Village of Sturgeon
|
Ord. 10
|
9/2/1954
|
Noble Avenue
|
Accepting
|
Beginning at its intersection of Chestnut Street in said plan.
|
Ord. 16
|
7/7/1955
|
North Lane
|
Accepting and dedicating
|
From First Street to Dead-End
|
Ord. 88
|
4/7/1967
|
Oakdale Alley
|
Maintaining
|
Res. 6-1964
|
5/18/1964
| |
Oakdale Road
|
Accepting
|
Glen Gormley Farm Plan
|
Ord. 55
|
10/10/1961
|
Old Mill Road
|
Accepting and dedicating
|
In the Bright Oaks PRD Plan, Phases 1 and 2
|
Res. 11-16
|
11/8/2016
|
Old North Branch Road
|
Vacating
|
Adjacent to and/or joining the property now or formerly owned
by James P. and Mary Jane Walker
|
Ord. 286
|
9/26/1995
|
Old Route 30
|
Abandoning
|
Adjacent to the property now or formerly of St. Columbkille
Roman Catholic Church
|
Ord. 137
|
8/2/1977
|
Old Route 978
|
Vacating
|
Adjacent to and/or joining the property nor or formerly owned
by James Molinaro and the Martin heirs.
|
Ord. 293
|
8/13/1996
|
Old Township Road 02015
|
Vacating
|
From Station marker 117 + 24 (SLD 119 + 32) through Station
Number 133 + 06.092 (SLD 141 + 80)
|
Ord. 125
|
12/9/1975
|
Palamino Drive
|
Accepting
|
Being the portion of said Palamino Drive which abuts Lots 624
to 637 both included and return with Lots 745 to 752.
|
Ord. 68
|
7/11/1963
|
Palomino Drive
|
Accepting
|
Hankey Farms Plan No. 3
|
Ord. 56
|
11/2/1961
|
Patrick Lane
|
Transferring
|
From Station 0+00 to Station 14+98 (exclude 11.5 foot bridge
at Station 12+6)
|
Res. 12-1986
|
11/17/1986
|
Patterson
|
Maintaining
|
Res. 6-1964
|
5/18/1964
| |
Patterson Row
|
Maintaining
|
Res. 6-1964
|
5/18/1964
| |
Paul Sturgeon Road
|
Maintaining
|
Res. 6-1964
|
5/18/1964
| |
Persian Drive
|
Accepting and dedicating
|
From Aberdeen Drive to Dead-End
|
Ord. 88
|
4/7/1967
|
Persian Road
|
Accepting
|
Hankey Farms Plan No. 3
|
Ord. 56
|
11/2/1961
|
Pheasant Walk Drive
|
Accepting
|
In the Waldon Woods Plan of Lots
|
Res. 5-1996
|
3/26/1996
|
Pin Oak
|
Improving
|
Having a centerline distance from Loran Road to Walden Way
|
Res. 21-1981
|
11/1/1981
|
Pine Valley Drive
|
Accepting
|
In the Development of Chelsea Glenn Plan No. 2
|
Res. 7-2005
|
8/23/2005
|
Pine View Drive
|
Accepting
|
In the Developments developed by Timberglen Limited and Redwood
Estates Limited
|
Res. 9-1998
|
12/8/1998
|
Pinkerton Run Road
|
Transferring
|
From Station 18+95 33 to Station 131+70
|
Res. 5-1987
|
4/15/1987
|
Pleasant Rise Drive
|
Accepting and dedicating
|
In the Point West Phases 4 and 6 Plan of Lots
|
Res. 9-14
|
2/25/2014
|
Pointe West Drive
|
Accepting
|
In the Point West Phase 2 Plan of Lots
|
Res. 16-2007
|
12/20/2007
|
Pointe West Drive
|
Accepting
|
In the Point West Phase I Plan of Lots
|
Res. 13-2007
|
11/27/2007
|
Raymond Drive
|
Accepting and dedicating
|
Fayette Farms PRD, Phases 1-A, 1-B, 1-C, 2A-1, 2A-2, 2-C, 2-C-2,
3-C and 4
|
Res. 21-18
|
10/9/2018
|
Resolution Road
|
Changing name
|
From Marshall Street to Resolution Road
|
Res. 8-1977
|
9/27/1977
|
Ridge Road
|
Transferring
|
Portion of Ridge Road which is situate in the Township of North
Fayette.
|
Ord. 118
|
7/8/1975
|
Ridge Road
|
Vacating
|
From L.R. 257 to its terminus with Robinson Township at Pinkerton
Run Road.
|
Ord. 243
|
10/8/1991
|
Robbins Street
|
Accepting
|
In the section known as Champion Hill.
|
Ord. 18
|
11/23/1955
|
Ruffed Grouse Drive
|
Accepting
|
In the Developments developed by Timberglen Limited and Redwood
Estates Limited
|
Res. 9-1998
|
12/8/1998
|
Saddle Ridge Drive
|
Accepting and dedicating
|
Fayette Farms PRD, Phases 1-A, 1-B, 1-C, 2A-1, 2A-2, 2-C, 2-C-2,
3-C and 4
|
Res. 21-18
|
10/9/2018
|
Saddle Ridge Drive
|
Accepting and dedicating
|
Fayette Farms PRD, Phase 4
|
Res. 30-21
|
6/22/2021
|
Saddle Ridge Drive
|
Accepting and dedicating
|
Fayette Farms PRD, Phase 5
|
Res. 31-21
|
6/22/2021
|
Saddle Ridge Drive
|
Accepting and dedicating
|
Fayette Farms PRD, Phase 7
|
Res. 32-21
|
6/22/2021
|
Saddle Ridge Drive
|
Accepting and dedicating
|
Fayette Farms PRD, Phase 8
|
Res. 33-21
|
6/22/2021
|
Saddle Ridge Drive
|
Accepting and dedicating
|
Fayette Farms PRD, Phase 9
|
Res. 34-21
|
6/22/2021
|
Saffron Hill
|
Maintaining
|
Res. 6-1964
|
5/18/1964
| |
School Street
|
Accepting
|
H.W. Robbins Plan of Lots
|
Ord. 54
|
9/7/1961
|
School Street Extension
|
Maintaining
|
Res. 6-1964
|
5/18/1964
| |
Settlers Place
|
Accepting
|
Beginning in Mahoney Road (T-370), the northeasterly corner
of the property now or formerly of Frank R. Sack, to a point on the
line dividing the within mentioned Settlers Place Plan from the property
now or formerly of Timberglen.
|
Ord. 168
|
5/10/1983
|
Shedlock Road
|
Maintaining
|
Res. 6-1964
|
5/18/1964
| |
Short Street
|
Accepting
|
Beginning at its intersection with Mill Street, aforesaid, and
extending northeastwardly to its intersection with Church Street.
|
Ord. 16
|
7/7/1955
|
Silo Court
|
Accepting
|
In the Development of the Brooketree Plan of Lots
|
Res. 10-1999
|
11/23/1999
|
Sitarik Road
|
Vacating
|
Extending from the westerly side of Wittengale Road to a point
on the northerly side of the Snyder Plan of Lots.
|
Ord. 113
|
4/25/1974
|
Smith Road
|
Maintaining
|
Res. 6-1964
|
5/18/1964
| |
Snyder Plan Roads
|
Maintaining
|
Res. 6-1964
|
5/18/1964
| |
Spring Hill Drive
|
Accepting and dedicating
|
Fayette Farms PRD, Phases 1-A, 1-B, 1-C, 2A-1, 2A-2, 2-C, 2-C-2,
3-C and 4
|
Res. 21-18
|
10/9/2018
|
Spring Street
|
Vacating
|
That portion of an unpaved roadway connecting Spring Street
to Hudson Street.
|
Ord. 89
|
9/21/1967
|
State Highway Old L.R., 257 (Route 22-30)
|
Vacating
|
From the westerly line of Noblestown Road to the easterly side
line of Washington Road adjoining Hanna Plan of Lots.
|
Ord. 38
|
12/3/1959
|
State Highway Route 02015
|
Vacating
|
From the intersection with the Fayetteville-Imperial Road, L.R.
538, at Chain Station 119-32, northeastwardly to Chain Station 141-80,
at the northerly terminus of relocation of said road as L.R. 02015-1.
|
Ord. 9
|
9/2/1954
|
Stop Street, N.W.
|
Accepting
|
Beginning at its intersection with State Street (Oakdale Road,
Route No. 02246), in the Plan of Noblestown to the intersection with
Chestnut Street
|
Ord. 16
|
7/7/1955
|
Stop Street, S.E.
|
Accepting
|
Beginning at its intersection with the easterly side with State
Street (Oakdale Road, Route No. 02246), and extending thence southeastwardly
crossing Short Street.
|
Ord. 16
|
7/7/1955
|
Sturgeon Plan Road
|
Maintaining
|
Res. 6-1964
|
5/18/1964
| |
Sturgeon Street
|
Accepting and dedicating
|
From L.R. 02246 to Dead-End
|
Ord. 88
|
4/7/1967
|
Summit Park Drive
|
Res. 2-2011
|
1/25/2011
| ||
Summit Park Drive Bridge
|
Accepting
|
For the construction of the bridge
|
Res. 7-1986
|
5/13/1986
|
Swaoger Street
|
Accepting
|
In the Development of the Jeffreytown Plan of Lots
|
Res. 9-2001
|
6/12/2001
|
Swiss Drive
|
Accepting
|
Hankey Farms Plan No. 3
|
Ord. 56
|
11/2/1961
|
Timber Trail
|
Improving
|
Having a centerline distance of 521 feet or 0.10 miles from
the southwest corner of Lot No. 238 in said plan of lots to Walden
Way.
|
Res. 21-1981
|
11/1/1981
|
Timber Trail
|
Improving
|
Having a centerline distance of 25 feet from Forest Glen to
the northeast corner of Lot. No. 362 in the said plan of lots.
|
Res. 21-1981
|
11/1/1981
|
Timberglen Drive
|
Accepting
|
From Walden Way to the driveway leading to Lots 3 through 14
of the Timberglen Phase I Plan
|
Res. 14-1989B
|
9/12/1989
|
Timberglen Drive
|
Accepting
|
In the Development of Chelsea Glenn Plan No. 2
|
Res. 7-2005
|
8/23/2005
|
Timberglen Drive North
|
Accepting
|
Development of Redwood Estates
|
Res. 1-2002
|
3/12/2002
|
Timberglen Drive North
|
Accepting
|
In the Developments developed by Timberglen Limited and Redwood
Estates Limited
|
Res. 9-1998
|
12/8/1998
|
Toward Road
|
Maintaining
|
Res. 6-1964
|
5/18/1964
| |
Township Road T-358
|
Vacating
|
Extending from the line dividing North Fayette Township from
Robinson Township in a southwesterly direction to a point on the property
now or formerly of H.F. Zellefrow.
|
Ord. 117
|
4/22/1975
|
Township Route No. 346
|
Vacating
|
From its intersection with U.S. PA Routes 22-30 on Station 217
to its intersection with Pa. State Route 978 at Station 76.
|
Ord. 25
|
6/7/1956
|
Trailor Street
|
Accepting and dedicating
|
From Frances Street to Dempe Street
|
Ord. 88
|
4/7/1967
|
Unnamed
|
Transferring
|
Beginning at the intersection of Legislative Route 680 and Township
Road 413 thence in a northwesterly direction over Township Road 413
to its intersection with Legislative Route 257
|
Res. 5-1963
|
10/10/1963
|
Unnamed
|
Accepting
|
Res. 3-1966
|
3/18/1966
| |
Unnamed
|
Transferring
|
From Station 7+50 to Station 184+76
|
Res. 14-1984
|
12/31/1984
|
Unnamed
|
Transferring
|
From Station 0+00 to Station 94+16
|
Res. 14-1985
|
11/19/1985
|
Unnamed
|
Transferring
|
From Station 0+00 to Station 48+91
|
Res. 13-1985
|
12/31/1985
|
Unnamed
|
Transferring
|
From Station 0+00 to Station 32+49
|
Res. 27-1987
|
12/31/1987
|
Unnamed
|
Accepting
|
In the RIDC Park
|
Res. 10-1992
|
7/28/1992
|
Unnamed
|
Accepting
|
In the RIDC Park
|
Res. 9-1995
|
5/9/1995
|
Unnamed
|
Accepting
|
In the Estates at Hawthorne
|
Res. 22-1995
|
12/12/1995
|
Village Circle
|
Accepting and dedicating
|
Fayette Farms PRD, Phases 1-A, 1-B, 1-C, 2A-1, 2A-2, 2-C, 2-C-2,
3-C and 4
|
Res. 21-18
|
10/9/2018
|
Virginia Drive
|
Accepting
|
Glen Gormley Farm Plan
|
Ord. 55
|
10/10/1961
|
Virginia Drive
|
Accepting and dedicating
|
From L.R. 681 to Lutz Road
|
Ord. 88
|
4/7/1967
|
Vista Court
|
Accepting and dedicating
|
Fayette Farms PRD, Phases 1-A, 1-B, 1-C, 2A-1, 2A-2, 2-C, 2-C-2,
3-C and 4
|
Res. 21-18
|
10/9/2018
|
Walden Way
|
Improving
|
Having a centerline distance of 834 feet or 0.18 miles from
the southwest corner of Lot No. 201 to the southwest corner of Lot
No. __________
|
Res. 21-1981
|
11/1/1981
|
Walden Way
|
Improving
|
Having a centerline distance of 1,749 feet or 0.33 miles from
U.S. Route 22 and 30 to the northeast corner of Lot No. 52 in said
plan
|
Res. 21-1981
|
11/1/1981
|
Walden Way
|
Improving
|
Having a centerline distance of 910 feet or 0.17 miles from
the northeast corner of Lot No. 332 in said plan of lots.
|
Res. 21-1981
|
11/1/1981
|
Walen Way
|
Accepting
|
From Forest Glen 840 feet to Briar Path
|
Res. 14-1989B
|
9/12/1989
|
Walnut Strand
|
Improving
|
Having a centerline distance of 147 feet or 0.03 miles from
Pin Oak to the northeast corner of Lot No. 41 in said plan.
|
Res. 21-1981
|
11/1/1981
|
Walnut Strand
|
Improving
|
Having a centerline distance of 1,085 feet or 0.21 miles from
the southwest point of Lot No. 221 in said plan to Timber Trail.
|
Res. 21-1981
|
11/1/1981
|
Walnut Street
|
Accepting and dedicating
|
From Patterson Street to Dead-End
|
Ord. 88
|
4/7/1967
|
West Allegheny Road
|
Assigning name
|
Beginning at Steubenville Pike and extending in a northerly
direction a distance of 1.0 miles to a point terminated by the Montour
Railroad.
|
Res. 6-1984
|
5/8/1984
|
Western Circle Drive
|
Accepting
|
In the Development of Pointe West
|
Res. 15-1997
|
10/14/1997
|
Western Circle Drive
|
Accepting
|
In the Point West Phase I Plan of Lots
|
Res. 13-2007
|
11/27/2007
|
Windover Drive
|
Accepting
|
In the Development of the Brooketree Plan of Lots
|
Res. 10-1999
|
11/23/1999
|
Windover Drive (cul-de-sac)
|
Accepting
|
In the Brooktree Plan of Lots No. 3
|
Res. 10-2008
|
7/8/2008
|
Windover Drive (cul-de-sac)
|
Accepting
|
In the Brooktree Plan of Lots No. 3
|
Res. 15-2008
|
12/9/2008
|
Woodcrest Drive
|
Accepting
|
In the development of the Woodcrest of North Fayette Condominium
Community.
|
Res. 19-2009
|
11/10/2009
|
Woodridge Drive
|
Accepting and dedicating
|
In the Point West Phase 6 Plan of Lots
|
Res. 10-14
|
2/25/2014
|
Zupancic Lane
|
Maintaining
|
Res. 6-1964
|
5/18/1964
|