[Ord. 146, 2/18/1992, § 900]
1. The following drawings are provided as supplementary information
and pictorial documentation to certain parts of the preceding specifications.
2. These drawings do not depict or represent all requirements as specified
within the preceding Part. Refer to all sections for specific information.
[Ord. 146, 2/18/1992, § 901; as amended by Ord.
167, 12/17/1996]
1. S-1 Type A (Standard) Manhole.
2. S-2 Type B (Shallow) Manhole.
3. S-3 Precast Drop Manhole Base (New Construction Only).
4. S-4 Drop Manhole (New Construction Only).
5. S-5 Standard Type A and Type B Field Cast Drop Manholes (Tie-in to
Existing Manholes Only).
6. S-6 Standard Manhole Ladder Rung Requirements.
7. S-7 Standard Self-Sealing Manhole Casting.
8. S-8 Typical (Go/No Go) Hand Pulled Mandrel (5% Deflection).
9. S-9 Typical Lateral and Cleanout Installation Within Right-of-Way.
10. S-10 Typical Lateral/Cleanout Construction (Onlot).
11. S-11 Typical (Deep) Lateral Connection.
12. S-12 Sleeve Procedure for Cleanouts and Vent Pipes.
13. S-13 Installation of Lateral Connections (After Main Installation).
14. S-14 Course Aggregate Requirements.
15. S-15 PennDOT Form 408 Concrete Requirements.
16. S-16 Pipe Bedding Requirements and Typical Trench Cross-Section Within
Right-of-Way and Beneath All Existing Roadways and Driveways.
17. S-17 Pipe Bedding Requirements and Typical Trench Cross-Section (Undeveloped
Areas).
18. S-18 Examples of Full Width Cartway Overlay Requirements.
19. S-19 General Paving Requirements.
20. S-20 Typical Sidewalk Restoration.
21. S-21 Standard Curb Restoration Requirements.
22. S-22 Seeding Requirements (Bucks County Conservation District).
23. S-23 Seeding Requirements (PennDOT Form 408 Specifications).
24. S-24 Sodding Specifications.
25. S-25 Sodding Specifications (Continued).
26. S-26 New Sewer/Existing Utility Crossing (Sewer Under Utility) Case
I and Case II.
27. S-27 New Sewer/Utility Crossing (Sewer Over New or Existing Utility):
Case I and Case II; Vertical Separations from 0 to 30 Inches.
28. S-28 New Sewer/New Utility Crossings; Vertical Separation Greater
than 30 Inches.
29. S-29 New Utility/Sewer Crossing (Utility Over Existing Sewer); Vertical
Depuration 18 Inches or Less.
30. S-30 Stream Crossing Detail.
31. S-31 External Manhole Chimney Seal.
32. S-32 Internal Manhole Chimney Seal.
33. S-33 Minimum Cone Dimensions for Manhole Chimney and Joint Seal.