The license application fee for each campground shall be $300 (§
105-2).
Whenever a check in any amount payable to the Township of Eagleswood is returned for insufficient funds, a service charge of $20 shall be added to the account (§
109-2).
Certification regarding the Flood Hazard Boundary Map or the
Flood Insurance Rate Map of the Township of Eagleswood: $10 (§ 145-24).
An application for an enlargement, extension, amendment or transfer of a license shall be accompanied by a fee amounting to 1/2 of the basic annual fee for the specific type of license involved, unless the fee for such an application is more particularly specified by a specific provision contained in any law, ordinance or regulation (§
166-3).
The annual license fee for each mobile home park shall be $700, plus $9 per month for each mobile home located in such park (§
176-5).
[Amended 2-28-2022 by Ord. No. 2022-03; 11-27-2023 by Ord. No. 2023-07]
A. Upon the sale or transfer of title, the certificate of occupancy
for a residential property, including the review of statement and
inspection, shall be $40. A fee of $15 shall be paid for each subsequent
reinspection required due to a previously failed inspection.
B. Upon the sale or transfer of title, a certificate of occupancy for
a commercial property, including the review of statement and inspection,
shall be $75. A fee of $50 shall be paid for each subsequent reinspection
required due to a previously failed inspection.
Application for a tree removal permit: $25 (§
263-5).
Boat stall or space at the public dock stalls at West Creek: a permit fee of $500 per year (§
278-7).
Refer to Chapter
285, Subdivision of Land, for escrow requirements.
A. Application for an informal hearing of a minor subdivision (residential and/or nonresidential): $100, plus $25 per lot (§
285-37).
B. Minor subdivision application fee: $150, plus $50 per lot, plus the applicable fee for a variance request, if necessary (§
285-37).
C. Application for an informal major subdivision hearing and/or sketch major subdivision plan (residential and/or nonresidential): $200 plus $10 per lot (§
285-37).
D. Preliminary major subdivision plat application fee: $500, plus $50 per lot, plus the applicable fee for a variance request, if necessary (§
285-37).
E. Final major subdivision plat application fee: $500, plus $25 per lot (§
285-37).
F. Requests for extensions to post-performance guarantee: $250 per extension (§
285-37).
G. Requests for extensions of major subdivision approval: $500 per extension (§
285-37).
I. Subdivision inspection fees: an amount not to exceed, except for extraordinary circumstances, the greater of $500 or 5% of the cost of improvements (§
285-37).
J. Environmental Commission review: an additional application fee of $250 (§
285-37).
K. Educational fees to be paid by an applicant submitting an application to the Land Use Board for review: $50, to defray the cost of tuition for required land use law and planning classes (§
285-37).
Refer to Chapter
295, Zoning, for escrow requirements.
A. Informal conditional use or site plan hearing and/or sketch site plan application fee (per meeting) (§
295-39):
|
Building Gross Floor Area
(square feet)
|
Application Fee
|
---|
|
Less than 1,000 or portion thereof
|
$100, plus $25 per acre
|
|
1,000 to 2,499 or portion thereof
|
$300, plus $25 per acre
|
|
2,500 or more or portion thereof
|
$500, plus $25 per acre
|
B. Preliminary site plan. The application fee to be paid shall be the sum of the site area and building area charges in accordance with the following schedule and conditions (§
295-39):
(1) Site area charge.
(a)
Gross site area of less than one acre: $250.
(b)
Gross site area of one or more acres, but less than 10 acres:
$250 for the first acre, plus $50 for each additional acre or portion
thereof.
(c)
Gross site area of 10 or more acres, but less than 50 acres:
$750 for the first 10 acres, plus $50 for each additional acre or
portion thereof.
(d)
Gross site area of 50 or more acres: $1,500 for the first 50
acres, plus $20 for each additional acre or portion thereof.
(2) Building area charge: $50 per each 1,000 square feet or portion thereof
of building gross floor area.
C. Final site plan application fee: $500 for the first acre, plus $50 per additional acre or portion thereof (§
295-39).
D. Minor site plan application fee: same as the application fee for a preliminary site plan application (§
295-39).
E. Requests for extensions (§
295-39).
(1) Requests for extensions to post-performance guarantee: $250 per extension.
(2) Requests for extension of site plan approval: $500 per extension.
Refer to Chapter
295, Zoning, for escrow requirements.
A. Conditional uses.
(1) Conditional use application fee when a site plan is not required: $250 (§
295-39).
(2) Conditional use application fee when a site plan is required: $200 (§
295-39).
B. Application fee for a request to hear and decide appeals pursuant to N.J.S.A. 40:55D-70a: $250 per request or appeal (§
295-39).
C. Application fee for a request to hear and decide interpretations pursuant to N.J.S.A. 40:55D-70b: $250 per request or appeal (§
295-39).
D. Variance requests pursuant to N.J.S.A. 40:55D-70c(1) and (2).
(1) Application fee for a variance request for a detached single-family dwelling permitted in the zoning district and not part of a site plan or subdivision application: $250 per variance (§
295-39).
(2) Application fee for a variance request for all other uses or structures, which may or may not be part of a site plan or subdivision application: $100 per variance (§
295-39).
E. Variance requests pursuant to N.J.S.A. 40:55D-70d.
(1) Application fee for a detached single-family dwelling not part of a site plan or subdivision application: $200 (§
295-39).
(2) Application fee for all other uses or structures, which may or may not be part of a site plan or subdivision application: $250 (§
295-39).
F. Application for a request to direct the issuance of permits for buildings or structures pursuant to N.J.S.A. 40:55D-34: $100 per request (§
295-39).
G. Application for a request for an appeal pursuant to N.J.S.A. 40:55D-36: $100 per request (§
295-39).
H. Zoning permit:
(2) Annual fee for a zoning permit for a home occupation: $100 (§
295-21).
I. Special meeting fees.
(1) With Land Use Board: $1,000 per special meeting (§
295-39).
(2) With professional staff of the Land Use Board: $250 per hour (§
295-39).
J. Site plan inspection fees: an amount not to exceed, except for extraordinary circumstances, the greater of $500 or 5% of the cost of improvements (§
295-39).
K. Environmental Commission review: an additional application fee of $125 (§
295-39).
L. Educational fees to be paid by an applicant submitting an application to the Land Use Board for review: $50, to defray the cost of tuition for required land use law and planning classes (§
295-39).
M. Forestry permit.
(2) Administrative fee: $250, which shall serve as reimbursement for any administrative costs incurred by the municipality during the ten-year permit period [§
295-71D(5)].
[Added 4-25-2016 by Ord.
No. 2016-2]
A. Any vendor who wishes to participate in the annual Country Fair shall
pay the Township of Eagleswood a fee of $20 and be entitled to receive
a ten-foot-by-ten-foot space to sell its products at the fair. If
a vendor wishes to purchase more than one ten-foot-by-ten-foot space,
then the vendor shall be charged $20 for each additional ten-foot-by-ten-foot
space to be utilized by the vendor.
B. Any vendor who contributes a product to the Township with a value
of at least $10 for each ten-foot-by-ten-foot space which the vendor
wishes to obtain shall be required only to pay $10 for each ten-foot-by-ten-foot
space.
C. The product or products provided to the Township with a value of
$10 or more shall be raffled off to participants during the Country
Fair.
D. Any vendor which maintains a 501(c)(3) identification shall not be
obligated to pay a fee to participate as a vendor at the Country Fair.