[Ord. 2003-0-2, --/--/2003, § 101-41]
1. 
The sewerage facilities must be designed and constructed in accordance with the technical specifications established by the Township.
2. 
The design drawing submittals must be certified by a Pennsylvania registered professional engineer representing the applicant.
3. 
Sewerage facilities proposed to serve new developments shall be properly sized to consider the ultimate needs of the area to be served, as designated by the Township's Act 537 Official Sewage Plan.
4. 
Sewerage facility extensions shall be designed to utilize gravity interceptors. If necessary, after evaluation of alternate means is exhausted, use of a pump station may be approved, subject to the Township's plans and specifications for pump stations. Where a pump station or low pressure sewer system is proposed, the Township Engineer will investigate gravity alternatives before a pump station or low pressure system is approved.
5. 
The applicant shall bear all costs incident to the application, permits, construction, inspection, and dedication of the facilities.
6. 
The applicant is also responsible for all costs in upgrading limiting capacities in existing down stream sewerage facilities to serve the ultimate needs of the designated area. A sufficient balance must be maintained in an escrow account to reimburse the Township for costs associated with evaluating limiting sections.
7. 
The applicant must execute the appropriate agreements, in a form acceptable to the Township Solicitor.