Table 27-7
| ||||
---|---|---|---|---|
CVO District Implementation Requirements
| ||||
(1) New Construction
|
(2) Building Permit Exceeding $100,000
|
(3) Item Being Improved
|
(4) Change in Use
| |
✓
|
✓*
| |||
✓
|
✓
| |||
Architectural Materials and Building Orientation (§ 27-308)
|
✓
|
✓*
| ||
Sidewalks and Walkways (§ 27-308)
|
✓
|
✓
|
✓
| |
Pedestrian Lighting (§ 27-308)
|
✓
|
✓
| ||
✓
|
✓
|
✓
| ||
✓
|
✓
| |||
✓
|
✓**
| |||
✓
|
✓
|
✓
| ||
✓
|
✓
| |||
✓
|
✓
|
*
|
Only applies to the expansion of the building footprint.
|
**
|
Does not apply to the maintenance, re-striping, sealing
or repaving of a parking lot. Repaving includes resurfacing and any
excavation and replacement of the base or sub-base of an existing
parking area necessary to resurface the same.
|
Table 27-8
| ||||
---|---|---|---|---|
UBO District Implementation Requirements
| ||||
(1) New Construction
|
(2) Building Permit Exceeding $200,000
|
(3) Item Being Improved
|
(4) Change is Use
| |
✓
|
✓*
| |||
✓
|
✓
|
✓
| ||
✓
|
✓
|
✓
| ||
✓
|
✓
| |||
✓
|
✓
| |||
✓
|
✓**
| |||
✓
|
✓
| |||
✓
|
✓
|
✓
| ||
✓
|
✓
| |||
✓
|
✓
|
*
|
Only applies to the expansion of the building footprint.
|
**
|
Does not apply to the maintenance, re-striping, sealing
or repaving of a parking lot. Repaving includes resurfacing and any
excavation and replacement of the base or sub-base of an existing
parking area necessary to resurface the same.
|
Street Speed Limit
(mph)
|
Minimum Driveway/Access Drive Spacing
(feet)
| |
---|---|---|
25 or less
|
105
| |
30
|
125
| |
35
|
150
| |
40
|
185
| |
45 or more
|
230
|
These spatial limitations are based on average vehicle acceleration
and deceleration rates and are considered necessary to maintain safe
traffic operation. Spacing shall be measured from the midpoint of
each driveway and/or access drive.
|