[Ord. 2014-02, 9/23/2014]
1. Fees have been established by the municipality as set forth by a resolution as adopted and amended from time to time, or as otherwise allowed by law, to defray plan review and construction inspection costs incurred by the municipality. All fees and estimated costs listed in §
23-602, Subsection
1, and as established by a resolution of the governing body shall be paid by the applicant at the time of SWM site plan submission as a fee and/or by establishment of an escrow deposit as set forth by resolution.
2. A review and inspection fee and escrow deposit schedule has been established by resolution of the governing body based on the size of the regulated activity and based on the municipality's costs for reviewing SWM site plans, O&M plans and agreements and as-built plans, and conducting inspections pursuant to §
23-501. The municipality shall periodically update the review and inspection fee schedule to ensure that review costs are adequately reimbursed.
[Ord. 2014-02, 9/23/2014]
1. The fees and escrow deposit required of the applicant by this chapter
shall at a minimum cover:
B. The review of the SWM site plan by the municipality, the Municipal
Engineer, Solicitor and other municipal consultants;
C. Coordination and meetings with the applicant;
D. The inspection of erosion and sediment control measures, BMPs, conveyances
and other related improvements during construction;
E. Review of project communications, reports, and additional supporting
information;
G. The final inspection upon completion of the BMPs, conveyances, and
other stormwater management facilities and related improvements presented
in the SWM site plan; and
H. Review of final as-built plan submission and revised calculations,
and inspections as needed.
2. The applicant shall also reimburse all expenses incurred by the municipality
for any additional work or municipal consultant fees, including, but
not limited to, solicitors' fees required to enforce any permit
provisions regulated by this chapter, correct violations, and ensure
proper completion of remedial actions.