The following documentation shall be provided in accordance
with applicable provisions, unless the applicant certifies that such
study or statement was submitted as part of the preliminary plan and
such study or statement continues to be accurate:
A. A feasibility study on sewer facilities for the tract in accordance with §
165-31.
B. A hydrogeological study in accordance with §
165-32.
C. A statement from any applicable authority, utility, or jurisdiction
that they are capable of providing service to the development and
that any extensions of service into the development can be constructed
to their standards.
D. A traffic impact study in accordance with §
165-53.
E. An environmental impact assessment report in accordance with §
165-54.
F. A wetland study in accordance with the requirements of the United States Army Corps of Engineers and PADEP and as further described in §
165-54.
G. A stormwater management plan in accordance with the Township Stormwater
Management Ordinance.
H. All floodplain information as required by Chapter
102 of the Township Code and proof of notification to the Federal Emergency Management Agency concerning any modifications to the floodplain that are proposed.
I. Evidence that required permits and approvals have been obtained from
PennDOT, PADEP, and United States Army Corps of Engineers as applicable,
or that proper applications have been submitted for such permits and
approvals.
J. A notation on the plan relating to the conformance with the requirement for a highway occupancy permit from the PennDOT, in accordance with §
165-22 of this chapter.
K. Whenever any improvements are proposed in connection with a subdivision
or land development, it shall be the responsibility of the applicant
to provide adequate engineering and related designs, construction
specifications, performance guarantees, and ownership and maintenance
responsibilities in accordance with the standards and requirements
set forth in this chapter, as applicable.
L. An erosion and sediment pollution control plan approved by the County
Conservation District, or evidence that such approval process is underway.
M. Monuments and markers shall be installed as provided in §
165-40. Global positioning system (GPS) locations shall be provided in writing to the Township for each new or replacement monument or marker. The monument or marker locations do not necessarily need to be set using a GPS survey, but the GPS locations are intended to make it easier in the future to find their correct location if they are buried or unlawfully moved. For these purposes, the level of accuracy of the GPS locations should be to the nearest two feet.