Table 26-V-1 Summary of Aquifer Testing Requirements
| |||||
---|---|---|---|---|---|
Permit Requirements
|
Well Classification
| ||||
1
|
2
|
3
| |||
RESIDENTIAL (NO. OF UNITS)
|
1-3
|
4-8
|
9-22
|
23-30
|
31+
|
NON- RESIDENTIAL (GPD)
|
0-1000
|
1001 - 2600
|
2,601 - 6000
|
6,001 - 10,000
|
10,000+
|
WATER QUALITY TEST
|
Required
|
Required
|
Required
|
Required
|
Required
|
WATER RESOURCES ANALYSIS REPORT
|
Not Required
|
Required
|
Required
|
Required
|
Required
|
NO. OF OBSERVATION WELLS
|
0
|
2
|
2
|
2
|
3
|
PUMPING TEST (HRS.)
|
4
|
72
|
72
|
72
|
72
|
(1)
|
Test wells may also be used as observation wells. Any observation
wells must be within the anticipated area of influence of the test
well. The use of existing wells is preferred.
|
(2)
|
There shall be a minimum of two observation wells, except for
Class 1 wells; one shall be on strike and the other perpendicular
to strike.
|
Summary (including any projected adverse impacts).
| |
Projected Water Needs.
| |
Domestic or Commercial use.
| |
Fire Company.
| |
Geology and Geologic Map.
| |
Aquifers.
| |
Recharge areas.
| |
Regional flow.
| |
Lineaments.
| |
Aquifer Characteristics.
| |
Aquifer Tests:
| |
Time-Drawdown data.
| |
Transmissivity and Storativity.
| |
Distance-Drawdown data.
| |
Extent of Cone of Depression.
| |
Safe Yield of Well.
| |
Water Quality.
| |
Hydrologic Budget.
| |
Drought Analysis - predicting water elevations for a ten- and
fifty-year drought Long term monitoring program must include provisions
for continuous recording of background water levels of the source
aquifer and, depending upon site conditions and proposed water use,
continuous surface water level recording.
| |
Qualifications.
|