[Ord. 1030, 3/14/2016]
All subdivision proposals and development proposals containing
at least 10 lots or at least one acre, whichever is the lesser, in
the Floodplain Conservation District where base flood elevation data
are not available, shall be supported by hydrologic and hydraulic
engineering analyses that determine base flood elevations and floodway
information. The analyses shall be prepared by a licensed professional
engineer in a format required by FEMA for a conditional letter of
map revision or letter of map revision. Submittal requirements and
processing fees shall be the responsibility of the applicant.