Table 5-1
Type of Developments Requiring a Traffic Impact Study
| ||
---|---|---|
Type of Development
|
Threshold Criteria
| |
PennDOT Highway Occupancy Permit (HOP) required
|
3,000 or more Average Daily Trips (ADT's) (NOTE: The anticipated
number of peak hour trips, trips per day, and classification of proposed
land use shall be determined using the current edition of ITE's
Trip Generation Manual, most recent edition, as amended. Threshold
criteria are PennDOT's.) generated
| |
1,500 or more day
| ||
100 or more vehicles entering or exiting the development within
a one hour period
| ||
No HOP required
|
500 or more Average Daily Trips
| |
50 or more Average Daily Trips during site's peak hours
|