[R.O. 1992 § 425.020; Ord. No. 16-11557, 8-15-2016, effective 3-1-2017; Ord. No. 24-13957, 5-20-2024]
A.
All newly installed fire hydrants as part any new development shall be flow tested by a registered professional engineer. This shall be done at the developer's expense.
B.
City staff shall be present for all flow testing.
C.
All fire flow results, signed by a registered professional engineer, shall be submitted to the City for review and approval before hydrant painting.