[Ord. No. 509, 6/18/2014]
1. The Borough of Hatfield shall inspect all phases of the installation
of the best management practices (BMPs) and/or stormwater management
(SWM) facilities as deemed appropriate by the Borough of Hatfield.
2. During any stage of the work, if the Borough of Hatfield determines
that the BMPs and/or stormwater management facilities are not being
installed in accordance with the approved SWM site plan, the Borough
of Hatfield shall revoke any existing permits or other approvals and
issue a cease and desist order until a revised SWM site plan is submitted
and approved, as specified in this Part, and until the deficiencies
are corrected.
3. A final inspection of all BMPs and/or stormwater management facilities
may be conducted by the Borough of Hatfield to confirm compliance
with the approved SWM site plan prior to the issuance of any occupancy
permit.
4. The applicant and/or developer shall be responsible for providing
as-built plans of all SWM BMPs included in the approved SWM site plan.
The as-built plans and an explanation of any discrepancies, which
were reviewed and received approval by the Borough of Hatfield, shall
be submitted to the Borough of Hatfield.
5. The as-built submission shall include a certification of completion
signed by a qualified professional verifying that all SWM BMPs have
been constructed according to the approved plans and specifications.
If any qualified professionals contributed to the construction plans,
they must sign and seal the completion certificate.
6. When appropriate, the Borough may require the applicant, developer
or landowner to enter into an agreement with the Borough providing
for the maintenance of any BMP or stormwater facility, and an easement
for the Borough to inspect any such facilities or BMPs, and to require
the landowner to maintain or repair any such BMPs or stormwater facilities
and, in default thereof, to allow the Borough to maintain or repair
such BMPs or stormwater facilities at the landowner's expense.