[Ord. No. 509, 6/18/2014]
1. 
For subdivisions and land developments, the applicant shall provide financial security acceptable to the Borough of Hatfield for the timely installation and proper construction of all stormwater management (SWM) facilities as:
A. 
Required by the approved SWM site plan equal to or greater than the full construction cost of the required controls; or
B. 
The amount and method of payment provided for in Chapter 22, Subdivision and Land Development.
2. 
For other regulated activities, the Borough of Hatfield may require financial security from the applicant.
[Ord. No. 509, 6/18/2014]
1. 
The owner of any land upon which stormwater facilities and BMPs will be placed, constructed, or implemented, as described in the stormwater facility and BMP O&M plan, shall record the following documents, in a form acceptable to the Borough Solicitor, in the office of the Recorder of Deeds for Montgomery County, prior to the construction of the stormwater facility and BMP O&M plan by the Borough of Hatfield:
A. 
The O&M plan, or a summary thereof;
B. 
O&M agreements under § 26-164; and
C. 
Easements under § 26-165.
2. 
The Borough of Hatfield may suspend or revoke any approvals granted for the project site upon discovery of failure on the part of the owner to comply with this section.
3. 
No regulated earth disturbance activities within the Borough of Hatfield shall commence until approval by the Borough of Hatfield of a BMP operations and maintenance plan which describes how the permanent (e.g., post-construction) stormwater BMPs will be properly operated and maintained. The following items shall be included in the stormwater facility and BMP O&M plan:
A. 
Plans or map(s) of the project area, in a form that meets the requirements for recording at the offices of the Recorder of Deeds of Montgomery County, and shall be submitted on 24 inch by 36 inch or 30 inch by 42 inch sheets. The contents of the map(s) shall include, but not be limited to:
(1) 
A clear identification of the location and nature of stormwater facilities and BMPs.
(2) 
The location of the project site relative to highways, municipal boundaries or other identifiable landmarks.
(3) 
Existing and final contours at intervals of two feet, or others as appropriate.
(4) 
Existing streams, lakes, ponds, or other bodies of water within the project site area.
(5) 
Other physical features, including flood hazard boundaries, sinkholes, streams, existing drainagecourses, and areas of natural vegetation to be preserved.
(6) 
The locations of all existing and proposed utilities, sanitary sewers, and water lines on site and within 50 feet of property lines of the project site.
(7) 
Proposed final changes to the land surface and vegetative cover, including the type and amount of impervious area that would be added.
(8) 
Proposed final structures, roads, paved areas, and buildings.
(9) 
A twenty-foot-wide access easement around all stormwater facilities and BMPs that would provide ingress to and egress from a public right-of-way.
B. 
A description of how each stormwater facility and BMP will be operated and maintained and the identity and contact information associated with the person(s) responsible for O&M.
C. 
The name of the project site, the name and address of the owner of the property, and the name of the individual or firm preparing the plan.
D. 
A statement, signed by the property owner, acknowledging that the stormwater facilities and BMPs are fixtures that cannot be altered or removed without the prior written approval of the Borough of Hatfield.
4. 
The stormwater facility and BMP O&M plan for the project site shall establish responsibilities for the continuing O&M of all stormwater facilities and BMPs, as follows:
A. 
If a plan includes structures or lots which are to be separately owned and in which streets, sewers and other public improvements are to be dedicated to the Borough of Hatfield, stormwater facilities and BMPs may also be offered for dedication to and maintained by the Borough of Hatfield, which is not required to accept any such facilities or BMPs; or
B. 
If a plan includes O&M by a homeowners' association or single ownership, or if sewers and other public improvements are to be privately owned and maintained by lot owners, the O&M of stormwater facilities and BMPs shall be the responsibility of the owner or private management entity on whose property the stormwater facility or BMP exists.
5. 
The Borough of Hatfield shall make the final determination on the continuing O&M responsibilities. The Borough of Hatfield reserves the right to accept or reject the O&M responsibility for any or all of the stormwater facilities and BMPs.
6. 
Facilities, areas, or structures used as BMPs shall be enumerated as permanent real estate appurtenances and recorded as deed restrictions or conservation easements that run with the land.
7. 
The O&M plan shall be recorded as a restrictive deed covenant that runs with the land.
8. 
The Borough may deny approval of subdivision, land development or construction plans or take enforcement actions against an owner for any failure to satisfy the provisions of this Part.
[Ord. No. 509, 6/18/2014]
1. 
The Borough of Hatfield shall review the stormwater facilities and BMP O&M plan for consistency with the purposes and requirements of this Part and any permits issued by the PADEP.
2. 
The Borough of Hatfield shall notify the applicant, in writing, whether the stormwater facility and BMP O&M plan is approved.
3. 
The Borough of Hatfield shall require a "record drawing" of all stormwater facilities and BMPs.
[Ord. No. 509, 6/18/2014]
1. 
The owner shall sign an O&M agreement, approved by the Borough Solicitor, with the Borough covering all stormwater facilities and BMPs that are to be privately owned. The O&M agreement shall be transferred with transfer of ownership. A sample agreement appears in Appendix A.[1]
[1]
Editor's Note: The appendixes are included as attachments to this chapter.
2. 
Other items may be included in the O&M agreement where determined necessary to guarantee the satisfactory O&M of all stormwater controls and BMPs. The O&M agreement shall be subject to the review and approval of the Borough.
3. 
Unless accepted for dedication by the Borough, or as otherwise agreed, the owner of the land on which the stormwater facility or BMP is located is responsible for the O&M of the SWM BMPs. If the owner fails to adhere to the O&M agreement, the Borough of Hatfield may perform the services required and charge the owner appropriate fees. Nonpayment of fees may result in a lien against the property. It shall be unlawful to alter or remove any permanent stormwater BMP required by an approved BMP operations and maintenance plan, or to allow the property to remain in a condition which does not conform to an approved BMP operations and maintenance plan, unless an exception is granted in writing by the Borough.
[Ord. No. 509, 6/18/2014]
1. 
Stormwater management easements are required for all areas used for off-site stormwater control, unless a waiver is granted by the Municipal Engineer.
2. 
Stormwater management easements shall be provided by the property owner if necessary for: access for inspections and maintenance; or preservation of stormwater runoff conveyance, infiltration, and detention areas on other BMPs, by persons other than the property owner. The purpose of the easement shall be specified in any agreement under § 26-164.
[Ord. No. 509, 6/18/2014]
If stormwater facilities, detention basins, or BMPs are accepted by the Borough for dedication, the Borough shall require applicants, developers or persons installing stormwater facilities or BMPs to pay a specified amount to the municipal stormwater BMP operation and maintenance fund to help defray costs of operations and maintenance activities. The amount shall be determined by the Borough Engineer.