A.
Granting authority. Wherever a special exception is authorized under this chapter, the authority to administer or grant special exception approval is vested in the Zoning Board of Adjustment.
B.
Purpose. Certain uses, structures, or conditions possess special characteristics such that if developed in certain locations or in certain ways may have significant adverse impacts. In order to safeguard the public interest and the interest of neighboring property owners, these uses, structures, and conditions are designated as uses allowed by special exception.
C.
Types of special exceptions.
(1)
There are two types of special exceptions included in this chapter:
(a)
Uses. Special exceptions for actual "uses" as defined in this chapter and as listed in the Uses Tables (e.g., contractor's storage yard).
(b)
Departures from standards. Special exceptions to allow for certain departures from standards otherwise applicable, articulated throughout this chapter (e.g., allowing for reduced setbacks for garages).
(2)
The process is the same for both types of special exceptions. The term "special exception" is used throughout this chapter for both situations.
D.
Criteria and conditions. The base criteria in § 275-22.2 apply to all special exceptions. In addition, certain particular uses have specific criteria and/or conditions which must also be met in order for those uses to be approved as listed below in § 275-22.3, Conditions for particular uses. For those uses which are not specifically discussed below, it is necessary only that the base criteria be satisfied.
E.
Burden of persuasion. The applicant shall bear the burden of persuasion, through the introduction of sufficient evidence as may be required by this chapter or by the Zoning Board of Adjustment in its reasonable discretion, that the proposal will comply with this chapter.
F.
Pertinent information. In reviewing an application for a special exception, the ZBA shall consider the following information, as applicable to the case:
(1)
Compliance with the applicable requirements contained in this chapter;
(2)
The results of any special investigative or scientific studies prepared in association with the proposed development;
(3)
Special reports or analysis of the project or its impacts, prepared by the City or consultants;
(4)
The findings, goals and objectives of the City's Master Plan;
(5)
The relationship of the development to the timing, location and cost of public improvements scheduled in the Capital Improvements Program;
(6)
Testimony and evidence introduced at the public hearing on the application; and
(7)
Any other appropriate information or documentation.
G.
Terms of approval. The ZBA may also impose, in addition to any applicable conditions specified in this chapter, such additional conditions as it finds reasonably appropriate to safeguard the neighborhood or otherwise serve the purposes of this chapter, including, but not limited to, the following:
(1)
Increasing front, side, and rear setbacks in excess of the minimum requirements of this chapter;
(2)
Screening of the premises from the street or adjacent property in excess of any minimum requirements of this chapter;
(3)
Landscaping in excess of any minimum requirements of this chapter or the Site Plan Regulations;
(4)
Modification of the exterior features of buildings or other structures;
(5)
Limitations on the size of buildings and other structures more stringent than the requirements of this chapter;
(6)
Footprint or lot coverage less than the allowed maximum of this chapter;
(7)
Limitations on the number of occupants and methods and times of operation;
(8)
Regulation of design of access drives, sidewalks, crosswalks, and other traffic features;
(9)
Off-street parking and loading spaces in excess of, or less than, the minimum requirements of this chapter or the Site Plan Regulations; and
(10)
Other performance standards as appropriate.
H.
Existing uses and structures. Any use that was lawfully established prior to the adoption of this chapter and which now may require a special exception is now permitted and may continue in the same manner and to the same extent as conducted prior to the adoption of this chapter. However, special exception approval shall be secured from the ZBA before the use or structure or building in which the use is conducted may be intensified, enlarged, expanded, moved, or significantly altered.
I.
Expiration. A special exception shall become null and void after three years from the date of approval unless a building permit is issued, a plat is recorded, or other appropriate action is taken pursuant to the special exception within that time frame.