[Ord. 2011-12-10, 12/12/2011]
1. The Borough Engineer or his Borough assignee shall inspect phases
of the installation of the permanent stormwater management facilities
as deemed appropriate by the Borough Engineer. It is the responsibility
of the permittee to notify the Borough Engineer 48 hours in advance
of the beginning of construction of stormwater management facilities.
Individual residential on-lot stormwater management systems shall
be inspected by the Borough staff.
2. During any stage of the work, if the Borough Engineer determines
that the permanent stormwater management facilities are not being
installed in accordance with the approved stormwater management site
plan, the Borough shall revoke any existing approvals issued under
this chapter until a revised stormwater management site plan is submitted
and approved, as specified in this chapter.