Estimated Construction Cost
(From Building Permit Application)
|
Fee Formula
| |
---|---|---|
$1 to $500
|
$10.41
| |
$501 to $2,000
|
$10.41 for the first $500 plus $0.26 for each additional $100
or fraction thereof up to and including $2,000
| |
$2,001 to $25,000
|
$14.31 for the first $2,000 plus $1.04 for each additional $1,000
or fraction thereof up to and including $25,000
| |
$25,001 to $50,000
|
$38.25 for the first $25,000 plus $0.78 for each additional
$1,000 or fraction thereof up to and including $50,000
| |
$50,001 to $100,000
|
$57.77 for the first $50,000 plus $0.52 for each additional
$1,000 or fraction thereof up to and including $100,000
| |
$100,001 to $500,000
|
$83.80 for the first $100,000 plus $0.46 for each additional
$1,000 or fraction thereof up to and including $500,000
| |
$500,001 to $1,000,000
|
$271.18 for the first $500,000 plus $0.42 for each additional
$1,000
| |
$1,000,001 and up
|
$479.38 for the first $1,000,000 plus $0.26 for each additional
$1,000 or fraction thereof
| |
Manufactured structures setup fee
|
$10.41 per section, with a minimum fee of $20.82 per permit
|
Operation Permit Fee Table
| |||
---|---|---|---|
Operations and Materials
|
Permit Required
|
Permit Fee
| |
Aircraft hangars
|
For servicing or repairing aircraft
|
$100 per year
| |
Airport terminal buildings
|
For operation
|
$100 per year
| |
Ambulatory health care occupancy
|
To operate an ambulatory health care occupancy
|
See Occupancy Permit Fee Table
| |
Ammonium nitrate
|
For storage
|
$250 per year
| |
Apartment buildings and dormitories
|
To operate an apartment building or dormitory
|
See Occupancy Permit Fee Table
| |
Automobile wrecking yards
|
To operate automobile wrecking yards
|
$100 per year
| |
Battery system
|
To operate stationary lead-acid battery systems having an electrolyte
capacity of more than 100 gallon (379 liters) in sprinklered buildings
or 50 gallon (189 liters) in nonsprinklered buildings
|
$75 per year
| |
Business occupancies
|
To operate a business occupancy
|
See Occupancy Permit Fee Table
| |
Candles, open flames, and portable cooking
|
To use in connection with assembly areas, dining areas of restaurants,
or drinking establishments
|
$30; single use; $60 multi-use
| |
Cellulose nitrate film
|
For storage, handling, or use
|
$100 per year
| |
Cleanrooms
|
For operation
|
$150 per year
| |
Combustible material storage
|
To store more than 2,500 ft3 (70.8
m3) gross volume
|
$250 per year
| |
Commercial rubbish-handling operation
|
To operate
|
$150 per year
| |
Consumer fireworks (1.4G)
|
For the sale, on-site handling, manufacture, and storage of
consumer fireworks (1.4G)
|
$150 per year
| |
Covered mall buildings
|
Annual requirement for facilities that utilize mall area for
exhibits or displays with 4 conditions
|
$250 per year
| |
Cutting and welding operation
|
For operations within a jurisdiction
|
$30; single use; $60; multi-use
| |
Day-care occupancies
|
To operate a day-care occupancy
|
See Occupancy Permit Fee Table
| |
Dry-cleaning plants
|
To engage in business of dry cleaning or to change to a more
hazardous cleaning solvent
|
$180 per year
| |
Dust-producing operations
|
To operate a grain elevator, flour mill, starch mill, feed mill,
or plant pulverizing aluminum, coal, cocoa, magnesium, spices, or
sugar, etc.
|
$250 per year
| |
Educational occupancy
|
To operate an educational occupancy
|
See Occupancy Permit Fee Table
| |
Exhibit and trade shows
|
For operation of all exhibits and trade shows held within a
jurisdiction
|
$250 per event
| |
Fairs, no rides
|
To conduct the events
|
$50 per event
| |
Flame effects
|
Use of flame effects before an audience
|
$180 per event
| |
Health care facility
|
To operate a health care occupancy
|
See Occupancy Permit Fee Table
| |
High-piled combustible storage
|
To use any building or portion thereof as a high-piled storage
area exceeding 500 ft2 (46.45 m2)
|
$250 per year
| |
Hot work operations
|
For hot work; for additional permit requirements for hot work
operations, see 41.1.5[1]
|
$30, single use; $60, multi-use
| |
Hotels and bed-and-breakfast establishment
|
To operate a hotel, motel or bed and breakfast establishment
|
See Occupancy Permit Fee Table
| |
Industrial occupancies
|
To operate an industrial occupancy
|
See Occupancy Permit Fee Table
| |
Industrial ovens and furnaces
|
For operation of industrial ovens and furnaces covered by Chapter
51[2]
|
$100 per year
| |
Lumberyards and woodworking plants
|
For storage of lumber exceeding 100,000 board feet
|
$250 per year
| |
Membrane structures, tents, and canopies - permanent
|
For construction, location, erection, or placement
|
$100 per structure
| |
Membrane structures, tents, and canopies - temporary
|
To operate an air-supported temporary membrane structure or
tent having an area in excess of 200 ft2 (18.6 m2) or a canopy in excess of 400
ft2 (37.2 m2).
Exception: temporary membrane structures, tents, or canopy structures
used exclusively for camping
|
$50, single use; $100, multi-use
| |
Mercantile occupancies
|
To operate a mercantile occupancy
|
See Occupancy Permit Fee Table
| |
Organic coatings
|
For operation and maintenance of a facility that manufactures
organic coatings
|
$150 per year
| |
Places of assembly, including special amusement buildings
|
To operate a place of assembly
|
See Occupancy Permit Fee Table
| |
Pyrotechnics before a proximate audience
|
For the display and use of pyrotechnic materials before a proximate
audience
|
$150 per event
| |
Propane filling station
|
Where cylinder refilling takes place
|
$50 per year
| |
Propane tank installation
|
Inspection of all propane installation, residential and commercial
|
$20 for permit
| |
Propane tank use at events
|
Tanks used at events or fairs
|
$20 per tank
| |
Refrigeration equipment
|
To operate a mechanical refrigeration unit or system
|
$50 per year
| |
Repair garages and service stations
|
For operation of service stations and repair garages
|
$50 per year
| |
Residential board and care occupancies
|
To operate a residential board and care occupancy
|
See Occupancy Permit Fee Table
| |
Rocketry manufacturing
|
For the manufacturing of model rocket motors
|
$250 per year
| |
Rooftop heliports
|
For operation of a rooftop heliport
|
$250 per year
| |
Special outdoor events, carnivals, and fairs
|
For the location and operation of special outdoor events, carnivals,
and fairs
|
$60 per event
| |
Special structures and high-rise buildings
|
To operate special structures and high-rise buildings
|
See Occupancy Permit Fee Table
| |
Storage occupancies
|
To operate a storage occupancy
|
See Occupancy Permit Fee Table
| |
Tar kettles
|
For placement of a tar kettle, placement shall be obtained prior
to the placement of a tar kettle
|
$30, single use; $60, multi-use
| |
Tire-rebuilding plants
|
For operation and maintenance of a tire-rebuilding plant
|
$150 per year
| |
Tire storage
|
To use an open area or portion thereof to store tires in excess
of 1,000 ft3 (28.3 m3)
|
$150 per year
| |
Torch-applied roofing operation
|
For the use of a torch for application of roofing materials
|
$30, single use; $60, multi-use
| |
Wildland fire-prone areas
|
For use of hazardous areas within fire-prone areas.
|
$x per year
| |
Wood products
|
To store chips, hogged material, lumber, or plywood in excess
of 200 ft3 (5.7 m3)
|
$150 per year
|
Occupancy Permit Fee Table
| ||||
---|---|---|---|---|
Occupancy Group 1 Annual Renewal A, E, H-1, I-1 and R
(Not Including R-3 Occupancies)
|
Occupancy Group 2 Biannual Renewal H-2, I-3, I-4, B-Medical
and B-College
|
Occupancy Group 3 Triennial Renewal B, H-3, M, S-1
|
Occupancy Group 4 Quadrennial Renewal F-1, F-2, H-4, H-5,
S-2 and U
| |
0 to 3,000 square feet
|
$60
|
$60
|
$60
|
$60
|
3,001 to 5,000 square feet
|
$95
|
$95
|
$95
|
$95
|
5,001 to 7,500 square feet
|
$125
|
$125
|
$125
|
$125
|
7,501 to 10,000 square feet
|
$135
|
$135
|
$135
|
$135
|
10,001 to 12,500 square feet
|
$150
|
$150
|
$150
|
$150
|
12,501 to 15,000 square feet
|
$170
|
$170
|
$170
|
$170
|
15,001 to 17,500 square feet
|
$180
|
$180
|
$180
|
$180
|
17,501 to 20,000 square feet
|
$190
|
$190
|
$190
|
$190
|
20,001 to 30,000 square feet
|
$205
|
$205
|
$205
|
$205
|
30,001 to 40,000 square feet
|
$230
|
$230
|
$230
|
$230
|
40,001 to 50,000 square feet
|
$245
|
$245
|
$245
|
$245
|
50,001 to 60,000 square feet
|
$260
|
$260
|
$260
|
$260
|
60,001 to 70,000 square feet
|
$275
|
$275
|
$275
|
$275
|
70,001 to 100,000 square feet
|
$285
|
$285
|
$285
|
$285
|
100,001 to 150,000 square feet
|
$305
|
$305
|
$305
|
$305
|
150,001 to 200,000 square feet
|
$340
|
$340
|
$340
|
$340
|