A.
Applicability.
(1)
Except as expressly provided herein, stormwater runoff from ALL industrial, commercial, institutional, office, residential and transportation projects including site preparation, construction and redevelopment, and all point source stormwater discharges from said projects shall be managed according to the Stormwater Management Standards, as defined by the Massachusetts Department of Environmental Protection in the Stormwater Management Handbook, including, but not limited to:
(a)
All housing development projects comprising three or more detached single-family dwellings;
(b)
Housing development and redevelopment projects comprised of one or two detached single-family dwellings that have a stormwater discharge that may potentially affect a critical area;
(c)
Construction or expansion of any parking lot where the total number of spaces is 10 or more; and,
(d)
Any application required to comply with the Stormwater Management Standards by the Town of Easton' Wetland Protection Bylaw.
(2)
The Stormwater Management Standards shall not apply to:
(a)
Housing development and redevelopment projects comprised of detached single-family dwellings on one or two lots, provided that there are no stormwater discharges that may potentially affect a critical area;
(b)
Multi-family housing development and redevelopment projects with four or fewer units, including condominiums, cooperatives, apartment buildings and townhouses, provided that there are no stormwater discharges that may potentially affect a critical area;
(c)
Emergency repairs to roads or their drainage systems;
(d)
Applications for Site Plan Approval where no new impervious surface is to be added provided that there are no stormwater discharges that may potentially affect a critical area;
(e)
Applications for Site Plan Approval that result in fewer than 10 parking spaces; nor
(f)
Applications for a Special Permit for a Common Driveway or Estate Lot.
(3)
For phased projects, the determination of whether the Stormwater Management Standards apply is made on the entire project as a whole including all phases. When proposing a development project subject to the Stormwater Management Standards, proponents shall consider environmentally sensitive site design that incorporates low impact development techniques in addition to stormwater best management practices.