Every project subject to the the requirements of this Section
shall submit a Stormwater Management Report. This report should document
the stormwater management system proposed and provide the Town and
its consultants with the information necessary to adequately evaluate
the design.
A. Report Format.
(1) The report shall be ordered such that there is a section labeled
and referenced to correlate directly to each section of the Massachusetts
Department of Environmental Protection Checklist for Stormwater Report.
All sections and information listed below shall be included in the
report, in the order listed. Each section should be clearly labeled
and separated from the previous section.
(2) Other information that should be included in the report in the as
appropriate and within the relevant section includes, but is by no
means limited to: established groundwater elevation,
(3) The report shall be printed double-sided.
B. Report Sections.
(1) Title. This section will identify the project name, location (i.e.
street address and map and lot #), applicant, and engineer
(2) Introduction. This should be a summary narrative that includes:
(a)
A description of existing topography and landscape at the site
(b)
Existing stormwater drainage patterns
(c)
Existing soil conditions and times of concentrations
(d)
Proposed topographic, landscape and soil changes
(e)
Proposed treatment methods and resulting stormwater drainage
patterns
(f)
A summary, in table format, of pre- and post-development curve
numbers, run-off rates and times of concentration.
(3) Stormwater Checklist and Certification. The completed Checklist for
Stormwater Report is to be included in this section
(4) LID Measures.
(a)
Narrative that provides a summary of how the design is environmentally
sensitive and what LID measures are being proposed.
(b)
Detailed description and relevant design information for each
method proposed. Operations and Maintenance plans for each design
element must also be included.
(5) Stormwater Management Standards 1-11. For each standard, the report
should address in sufficient detail each item that is checked on the
Checklist for Stormwater Report. At a minimum, the detail should include
a summary of the supporting calculations. The full drainage analysis
calculations should be provided in an addendum to the report.
(6) Operations and Maintenance Plan.
(a)
Plan must address operations and maintenance of all the proposed
stormwater management structures and elements, including erosion control
methods, during and post-construction
(b)
The Operations and Maintenance Plan should have a section for
each BMP structure or element proposed and shall include the following
detailed information:
[1]
Schedule of maintenance for each BMP
[2]
Description of maintenance required for each BMP to ensure proper
function
[3]
Party responsible for conducting maintenance
|
Note: Reports should not include any information that is not
relevant to the particular project being proposed. For example, portions
of the regulations should not be quoted within the report unless they
provide meaningful relevance; items in the checklist which have not
been checked as applying to the proposed project should not be included.
|
As a standard condition of subdivision approval, upon completion
of the project, the applicant shall submit the following:
A. A letter from a registered professional engineer certifying the structures
and elements as constructed will meet the standards as intended by
the approved plan and detailing any deviations from the approved proposed
plan and their potential effect. A statement the work is in "substantial
compliance" with no detailing of the deviations shall not be accepted.
B. An "As-Built" plan signed and stamped by a registered professional
engineer or land surveyor showing in detail the exact location of
all structures or elements, elevations and the topography of the finished
grades. The issuing authority will issue a letter certifying completion
upon receipt and approval of the final reports and/or upon otherwise
determining that all work of the permit has been satisfactorily completed
in conformance with this chapter.