The following costs and fees shall be established by the Board
of Selectmen:
A. A per-square-foot cost factor, which shall be used to estimate the
cost of new construction.
B. Fees for new construction at a rate per $1,000 of estimated cost
of construction or actual contract price, whichever is greater.
C. Fees for additions, alterations and remodeling at a rate per $1,000
based upon the estimated cost of construction. Estimated construction
cost of additions, alterations and remodeling shall be the actual
contract price. There shall be a minimum fee per permit to be established
by the Board of Selectmen.
D. Copies of the actual contract price shall be submitted with the building
permit application.
E. Building permit fees shall be required for municipally owned buildings
and structures. Building permit fees for buildings and structures
wholly owned by the Town of North Andover may be waived, in whole
or in part, only by the Board of Selectmen based on the Board's determination
of the benefits accruing to the Town from such a waiver. In all cases,
fees will be required for mechanical and utility permits.