The Township shall return monies remaining in the deposit for
inspection costs to the developer upon receipt of the required maintenance
bond, as-built plans of the recorded plan, legal descriptions of all
public improvements installed, specifically road rights-of-way, copies
of any deed restrictions placed on the property, and a certification
by the developer's registered professional surveyor that all
required control monumentation has been installed as shown on the
recorded plan.
Approval of construction shall not constitute an acceptance
of improvements for repairs or maintenance by the Township. All improvements
shall remain in private ownership until such time as their dedication
shall have been accepted by ordinance or resolution of the Board of
Supervisors or until condemned for public use.