Table of Contents
Table of Contents
- Part I: Administrative Legislation
- Ch 1 General Provisions
- Ch 25 Salaries and Compensation
- Part II General Legislation
- Ch 50 Burning, Open
- Ch 59 Construction Codes, Uniform
- Ch 67 Driveways
- Ch 78 Floodplain Management
- Ch 90 Hazardous Materials
- Ch 125 Nuisances
- Ch 132 Official Map
- Ch 161 Sewers and Sewage Disposal
- Ch 170 Stormwater Management
- Ch 170 Art I General Provisions
- ยงย 170-101 Short title.
- ยงย 170-102 Statement of findings.
- ยงย 170-103 Purpose.
- ยงย 170-104 Statutory authority.
- ยงย 170-105 Applicability.
- ยงย 170-106 Exemptions and modified requirements.
- ยงย 170-107 Repealer.
- ยงย 170-108 Severability.
- ยงย 170-109 Compatibility with other ordinances or legal requirements.
- ยงย 170-110 Financial security.
- ยงย 170-111 Waivers.
- ยงย 170-112 Erroneous permit.
- Ch 170 Art II Definitions
- ยงย 170-201 Interpretation.
- ยงย 170-202 Definitions.
- Ch 170 Art III Stormwater Management Standards
- ยงย 170-301 General requirements.
- ยงย 170-302 Permit requirements by other governmental entities.
- ยงย 170-303 Erosion and sediment control.
- ยงย 170-304 Site design process.
- ยงย 170-305 Water quality and runoff volume requirements.
- ยงย 170-306 Infiltration requirements.
- ยงย 170-307 Stream channel protection requirements.
- ยงย 170-308 Stormwater peak rate control requirements.
- ยงย 170-309 Calculation methodology.
- ยงย 170-310 Other requirements.
- ยงย 170-311 Other conveyance and system design standards.
- Ch 170 Art IV Stormwater Management (SWM) Site Plan Requirements
- ยงย 170-401 General requirements.
- ยงย 170-402 SWM site plan contents.
- ยงย 170-403 SWM site plan submission.
- ยงย 170-404 SWM site plan review.
- ยงย 170-405 Revision of SWM site plans.
- ยงย 170-406 Resubmission of inconsistent or noncompliant SWM site plans.
- Ch 170 Art V Performance and Inspection of Regulated Activities, and Final As-Built Plans
- ยงย 170-501 Performance and inspection of regulated activities.
- ยงย 170-502 Final as-built plans.
- Ch 170 Art VI Fees and Expenses
- ยงย 170-601 Municipality SWM site plan review and inspection fees.
- ยงย 170-602 Expenses covered by fees.
- Ch 170 Art VII Operation and Maintenance (O&M) Responsibilities and Easements
- ยงย 170-701 General requirements for protection, operation and maintenance of stormwater BMPs and conveyances.
- ยงย 170-702 Operation and maintenance plans.
- ยงย 170-703 Operation and maintenance agreements.
- ยงย 170-704 Easements and deed restrictions.
- ยงย 170-705 Other post-construction responsibilities.
- ยงย 170-706 Municipal stormwater control and BMP operation and maintenance inspections and BMP operations and maintenance requirements.
- Ch 170 Art VIII Prohibitions
- ยงย 170-801 Prohibited discharges.
- ยงย 170-802 Prohibited connections.
- ยงย 170-803 Roof drains and sump pumps.
- ยงย 170-804 Alteration of BMPs.
- Ch 170 Art IX Enforcement and Penalties
- ยงย 170-901 Public nuisance.
- ยงย 170-902 Right of entry.
- ยงย 170-903 Enforcement.
- ยงย 170-904 Suspension and revocation of permits and approvals.
- ยงย 170-905 Violations and penalties.
- ยงย 170-906 Appeals.
- ยงย 170-907 When effective.
- Ch 185 Subdivision and Land Development
- Ch 193 Taxation
- Ch 212 Vehicles and Traffic
- Ch 240 Zoning
- Disposition List
- Ch DL Disposition List