[Ord. No. 985, 7-5-2018]
Unless otherwise specifically provided or unless clearly required by the context, the words and phrases defined in this Section shall have the meaning set forth in this Section when used in this Article. Words used in this Article, but not defined in this Section, may be defined in Article II of this UDO.
COST
The cost of renovation, repair or restoration shall mean the fair-market value of the materials and services necessary to accomplish a renovation, repair or restoration. Cost shall mean the total cost of all intended work, and no person may avoid the intent of this definition by doing the intended work incrementally.
EFFECTIVE DATE OF THIS UDO
Whenever this UDO refers to the effective date of this UDO, the reference shall include the effective date of any ordinance that amends this UDO, if the ordinance, rather than this UDO as originally adopted, creates a nonconforming situation.
NONCONFORMING USE
A primary use of property existing on the effective date of this UDO that occurs when property is used for a purpose or in any manner made unlawful by the use regulations or performance and design standards applicable to the zoning district in which the property is located. The term also refers to the activity that constitutes the use made of the property. The term does not refer to accessory use of property.
NONCONFORMING STRUCTURE
A structure that was lawfully constructed prior to the effective date of this UDO, but which could not be constructed under the terms of this UDO by reason of restrictions on area, lot coverage, height, setbacks (yards), location on the lot or other requirements concerning structures.
STRUCTURAL VALUE
The then current cost of a structure or its replacement value, if destroyed.
[Ord. No. 985, 7-5-2018]
A. 
Structures. A lawful nonconforming structure may continue to exist so long as it remains otherwise lawful, provided that no reconstruction, enlargement or alteration of the structure shall occur that will increase its nonconformity, except as provided herein.
B. 
Uses Of Land. A lawful nonconforming use of land may be continued so long as it remains otherwise lawful and provided that no enlargement, increase or extension of the lawful nonconforming use of land occurs so that a greater area of land is occupied than that which was occupied on the effective date of this UDO or any amendment thereto that makes the use nonconforming, and that no additional structures or additions to structures existing on the effective date of this UDO shall be constructed on the same lot. Further, no such lawful nonconforming use of land shall be moved or relocated in whole or in part to any other portion of the lot on which it is located, other than that portion occupied at the time of effective date of this UDO. If any lawful nonconforming use of land is not used as such for any reason for a period of more than one hundred eighty (180) consecutive days, any subsequent use of that land shall conform to the terms of this UDO.
[Ord. No. 985, 7-5-2018]
Should any lawful nonconforming structure be damaged by any means to an extent of more than fifty percent (50%) of its replacement cost at the time of damage, it may only be reconstructed in conformance with the provisions of this UDO. Reconstruction of a lawful nonconformity, where permitted, must commence within one (1) year of destruction. In those instances where reconstruction does not commence within this limited time frame, the lawful nonconformity will be considered discontinued and the structure shall only be reconstructed as a permitted use.
[Ord. No. 985, 7-5-2018]
Minor repairs to and routine maintenance of structures and property, where nonconforming situations exist, are permitted and encouraged. Major renovation, i.e., work estimated to cost more than fifty percent (50%) of the structural value of the structure to be renovated, shall not be permitted.
[Ord. No. 985, 7-5-2018]
To determine the structural value and replacement cost of a lawful nonconforming structure, the owner seeking to undertake maintenance, reconstruction or repair, or restoration of a lawful nonconforming structure must submit written estimates, which must be obtained from three (3) separate contractors, detailing the cost of the applicable improvement or repair and the cost of replacement of the entire lawful nonconforming structure. The Zoning Administrator will establish the structural value and/or replacement cost based upon the average of these estimates.