home
Home
code
Code
Code
Index
law
Laws (0)
New Laws (0)
help_center
Help
Help
About Us
ecode
ecode
search
warning
Login
Town of Kennebunkport, ME
chevron_right
2023-11-07
info
chevron_right
Part I: General Ordinances
chevron_right
Chapter 183 Wastewater Use
Part I: General Ordinances
Ch 1
General Provisions
Ch 5
Administrative Code
Ch 9
Alarm Systems
Ch 12
Alcoholic Beverages
Ch 16
Animals
Ch 24
Beaches
Ch 29
Boating
Ch 34
Cable Television
Ch 41
Emergency Management
Ch 46
Fires and Fire Prevention
Ch 49
Fireworks
Ch 55
General Assistance
Ch 61
Harbor and Waterfront
Ch 80
Kennebunk River
Ch 105
Peace and Good Order
Ch 110
Property Assessed Clean Energy
Ch 127
Shellfish Conservation
Ch 129
Short-Term Rentals
Ch 132
Skateboards
Ch 140
Special Events and Mass Gatherings
Ch 147
Streets and Sidewalks
Ch 153
Taxation
Ch 160
Traffic and Vehicles
Ch 172
Victualers
Ch 179
Waste Management
Ch 183
Wastewater Use
Ch 183 Art I
Purpose, Authority, Scope and Intent
ยงย 183-1
Title.
ยงย 183-2
Purpose.
ยงย 183-3
Authority.
ยงย 183-4
Repealer; scope.
Ch 183 Art II
Terminology
ยงย 183-5
Definitions.
Ch 183 Art III
Use of Public Sewers Required
ยงย 183-6
Unlawful deposits.
ยงย 183-7
Discharge to natural outlet.
ยงย 183-8
Private facilities.
ยงย 183-9
All buildings to have sanitary facilities.
ยงย 183-10
Connection to public sewer required.
ยงย 183-11
Exemption.
Ch 183 Art IV
Private Wastewater Disposal
ยงย 183-12
Conditions for use of private system.
ยงย 183-13
Permit required.
ยงย 183-14
Inspections.
ยงย 183-15
Compliance with regulations.
ยงย 183-16
Connection to public sewer and abandonment of private facilities.
ยงย 183-17
Operation and maintenance.
ยงย 183-18
Construal of provisions.
Ch 183 Art V
Building Sewers and Connections
ยงย 183-19
Permit required.
ยงย 183-20
Building sewer permits.
ยงย 183-21
When required.
ยงย 183-22
Costs.
ยงย 183-23
Separate sewer per building; exception.
ยงย 183-24
Use of old building sewers.
ยงย 183-25
Methods and materials.
ยงย 183-26
Location of building sewer.
ยงย 183-27
Connection of drains restricted.
ยงย 183-28
Standards for connections.
ยงย 183-29
Inspections.
ยงย 183-30
Guarding and restoration of excavations.
ยงย 183-31
Closing and sealing of abandoned drains.
ยงย 183-32
Connection fee.
ยงย 183-33
Maintenance of building sewer.
Ch 183 Art VI
Sewer Extensions
ยงย 183-34
Sewer extensions within public way at public expense.
ยงย 183-35
Sewer extensions within public way at private expense.
ยงย 183-36
Sewer extensions located on private property at private expense.
Ch 183 Art VII
Use of Public Sewers
ยงย 183-37
Discharge of waters.
ยงย 183-38
Discharge to storm sewer or natural outlet.
ยงย 183-39
Prohibited discharges.
ยงย 183-40
Prohibited substances.
ยงย 183-41
Actions by Director of Public Works.
ยงย 183-42
Grease, oil and sand interceptors.
ยงย 183-43
Maintenance of facilities.
ยงย 183-44
Manhole.
ยงย 183-45
Information required to determine compliance.
ยงย 183-46
Tests and monitoring.
ยงย 183-47
Pretreatment regulations.
ยงย 183-48
Special agreements.
Ch 183 Art VIII
Sewer Capacity Allocations
ยงย 183-49
Allocation procedure.
ยงย 183-50
Right to reject applications for sewer permits.
ยงย 183-51
Forfeiture or reduction of capacity.
ยงย 183-52
Determination of buildable lot.
Ch 183 Art IX
Lapse of Sewer Permit and Entitlement to Sewer Capacity
ยงย 183-53
Conditions for lapse.
Ch 183 Art X
Protection from Damage
ยงย 183-54
Damaging or tampering with sewage works.
Ch 183 Art XI
Power and Authority of Inspectors
ยงย 183-55
Right of entry.
ยงย 183-56
Entrance on easements.
ยงย 183-57
Indemnification.
Ch 183 Art XII
Penalties
ยงย 183-58
Notice of violation.
ยงย 183-59
Violations and penalties.
ยงย 183-60
Liability for damages.
ยงย 183-61
Other remedies.
ยงย 183-62
Permit for expansion of existing facility.
Ch 183 Art XIII
Sewer Service Charge
ยงย 183-63
Purpose; reserve fund.
ยงย 183-64
Calculation of charges.
ยงย 183-65
Charges for industrial waste.
ยงย 183-66
Special sewer service charge.
ยงย 183-67
Authority of Director of Public Works to change charges.
ยงย 183-68
Charge to become lien on premises.
ยงย 183-69
Federal regulations.
ยงย 183-70
Sewer bill after connection permit issued.
Ch 183 Art XIV
Septic Waste
ยงย 183-71
Disposal of septic waste.
Ch 183 Art XV
Validity
ยงย 183-72
Repealer.
ยงย 183-73
Severability.
Ch 183 Art XVI
Appeals
ยงย 183-74
Authority of Selectmen.
ยงย 183-75
Hearing.
ยงย 183-76
Procedure for instituting appeal.
ยงย 183-77
New appeal after decision.
Ch 183 Art XVII
Effective Date
ยงย 183-78
When effective.
Part II: Zoning Ordinances
Ch 210
Condominium Conversion
Ch 219
Floodplain Management
Ch 240
Land Use
Ch 245
Lighting, Outdoor
Ch 252
Marijuana
Ch 290
Wireless Telecommunications Facilities Siting
Part III: Board of Selectmen Regulations
Ch 315
Goose Rocks Beach Parking Rules and Regulations
Ch 342
Solid Waste Rules and Regulations
Ch 346
Special Amusement Permit Rules and Regulations
Part IV: Planning Board Regulations
Ch 405
Planning Board Rules and Regulations
Ch 415
Subdivision Regulations
Disposition List
Ch DL
Disposition List
arrow_back
print
Print
email
Email
download
Download
share
Share
add_alert
Get Updates
arrow_forward
Chapter 183
Wastewater Use
[HISTORY: Adopted by the Town of Kennebunkport
3-7-1985
; as amended through
2-22-2018
. Subsequent amendments noted where applicable.]
Article I
Purpose, Authority, Scope and Intent
chevron_right
ยงย 183-1
Title.
chevron_right
ยงย 183-2
Purpose.
chevron_right
ยงย 183-3
Authority.
chevron_right
ยงย 183-4
Repealer; scope.
chevron_right
Article II
Terminology
chevron_right
ยงย 183-5
Definitions.
chevron_right
Article III
Use of Public Sewers Required
chevron_right
ยงย 183-6
Unlawful deposits.
chevron_right
ยงย 183-7
Discharge to natural outlet.
chevron_right
ยงย 183-8
Private facilities.
chevron_right
ยงย 183-9
All buildings to have sanitary facilities.
chevron_right
ยงย 183-10
Connection to public sewer required.
chevron_right
ยงย 183-11
Exemption.
chevron_right
Article IV
Private Wastewater Disposal
chevron_right
ยงย 183-12
Conditions for use of private system.
chevron_right
ยงย 183-13
Permit required.
chevron_right
ยงย 183-14
Inspections.
chevron_right
ยงย 183-15
Compliance with regulations.
chevron_right
ยงย 183-16
Connection to public sewer and abandonment of private facilities.
chevron_right
ยงย 183-17
Operation and maintenance.
chevron_right
ยงย 183-18
Construal of provisions.
chevron_right
Article V
Building Sewers and Connections
chevron_right
ยงย 183-19
Permit required.
chevron_right
ยงย 183-20
Building sewer permits.
chevron_right
ยงย 183-21
When required.
chevron_right
ยงย 183-22
Costs.
chevron_right
ยงย 183-23
Separate sewer per building; exception.
chevron_right
ยงย 183-24
Use of old building sewers.
chevron_right
ยงย 183-25
Methods and materials.
chevron_right
ยงย 183-26
Location of building sewer.
chevron_right
ยงย 183-27
Connection of drains restricted.
chevron_right
ยงย 183-28
Standards for connections.
chevron_right
ยงย 183-29
Inspections.
chevron_right
ยงย 183-30
Guarding and restoration of excavations.
chevron_right
ยงย 183-31
Closing and sealing of abandoned drains.
chevron_right
ยงย 183-32
Connection fee.
chevron_right
ยงย 183-33
Maintenance of building sewer.
chevron_right
Article VI
Sewer Extensions
chevron_right
ยงย 183-34
Sewer extensions within public way at public expense.
chevron_right
ยงย 183-35
Sewer extensions within public way at private expense.
chevron_right
ยงย 183-36
Sewer extensions located on private property at private expense.
chevron_right
Article VII
Use of Public Sewers
chevron_right
ยงย 183-37
Discharge of waters.
chevron_right
ยงย 183-38
Discharge to storm sewer or natural outlet.
chevron_right
ยงย 183-39
Prohibited discharges.
chevron_right
ยงย 183-40
Prohibited substances.
chevron_right
ยงย 183-41
Actions by Director of Public Works.
chevron_right
ยงย 183-42
Grease, oil and sand interceptors.
chevron_right
ยงย 183-43
Maintenance of facilities.
chevron_right
ยงย 183-44
Manhole.
chevron_right
ยงย 183-45
Information required to determine compliance.
chevron_right
ยงย 183-46
Tests and monitoring.
chevron_right
ยงย 183-47
Pretreatment regulations.
chevron_right
ยงย 183-48
Special agreements.
chevron_right
Article VIII
Sewer Capacity Allocations
chevron_right
ยงย 183-49
Allocation procedure.
chevron_right
ยงย 183-50
Right to reject applications for sewer permits.
chevron_right
ยงย 183-51
Forfeiture or reduction of capacity.
chevron_right
ยงย 183-52
Determination of buildable lot.
chevron_right
Article IX
Lapse of Sewer Permit and Entitlement to Sewer Capacity
chevron_right
ยงย 183-53
Conditions for lapse.
chevron_right
Article X
Protection from Damage
chevron_right
ยงย 183-54
Damaging or tampering with sewage works.
chevron_right
Article XI
Power and Authority of Inspectors
chevron_right
ยงย 183-55
Right of entry.
chevron_right
ยงย 183-56
Entrance on easements.
chevron_right
ยงย 183-57
Indemnification.
chevron_right
Article XII
Penalties
chevron_right
ยงย 183-58
Notice of violation.
chevron_right
ยงย 183-59
Violations and penalties.
chevron_right
ยงย 183-60
Liability for damages.
chevron_right
ยงย 183-61
Other remedies.
chevron_right
ยงย 183-62
Permit for expansion of existing facility.
chevron_right
Article XIII
Sewer Service Charge
chevron_right
ยงย 183-63
Purpose; reserve fund.
chevron_right
ยงย 183-64
Calculation of charges.
chevron_right
ยงย 183-65
Charges for industrial waste.
chevron_right
ยงย 183-66
Special sewer service charge.
chevron_right
ยงย 183-67
Authority of Director of Public Works to change charges.
chevron_right
ยงย 183-68
Charge to become lien on premises.
chevron_right
ยงย 183-69
Federal regulations.
chevron_right
ยงย 183-70
Sewer bill after connection permit issued.
chevron_right
Article XIV
Septic Waste
chevron_right
ยงย 183-71
Disposal of septic waste.
chevron_right
Article XV
Validity
chevron_right
ยงย 183-72
Repealer.
chevron_right
ยงย 183-73
Severability.
chevron_right
Article XVI
Appeals
chevron_right
ยงย 183-74
Authority of Selectmen.
chevron_right
ยงย 183-75
Hearing.
chevron_right
ยงย 183-76
Procedure for instituting appeal.
chevron_right
ยงย 183-77
New appeal after decision.
chevron_right
Article XVII
Effective Date
chevron_right
ยงย 183-78
When effective.
chevron_right