Sewer laterals and water services shall be installed to the
right-of-way (or easement) line for all lots. Each service shall be
located with a stake color coded in conformance with Industrial Code
53 to denote the type of service they represent.
The monuments shall be installed at those locations shown on
the approved final plan and as located in the field by a licensed
land surveyor. They shall be installed to a depth of at least 30 inches
below finished grade, with the top surface to be flush with finished
grade. Upon the installation of the monuments, the location shall
be certified to the Town by a licensed land surveyor as to their accuracy
(see Appendix L).
[Amended 6-25-2020 by L.L. No. 3-2020]
A. Upon satisfactory completion of the utilities and roads, the entire
area within the right-of-way shall be raked and graded to the approved
plans.
B. The site contractor shall be responsible to fine grade the right-of-way
and maintain erosion control. In those areas where dwelling building
has started, cleanup and site maintenance will then become the responsibility
of the builder.
C. Debris and spoil banks created during the development (not dwelling
building) of the site shall be entirely removed and/or disposed of
from the site. No burying of debris or material shall be allowed on
approved or proposed building lots.
During the time period between initial installation and testing
and acceptance for dedication, debris and/or sediment may accumulate
in the utility systems. The developer shall be responsible to flush
and remove this debris from the system prior to the final inspection
for dedication.