HOW TO USE THIS ORDINANCE
This ordinance contains a comprehensive set of regulations and
requirements intended to provide for the optimum development of land
and to adequately protect property owners and residents within the
City of Ithaca. These regulations are often cross-referenced within
the ordinance; therefore, the user is encouraged to be diligent in
adhering to all applicable related regulations and requirements. That
includes becoming familiar with the various components of Article
4, General Provisions.
Before any construction or expansion of a structure or use regulated
by this ordinance, a zoning permit must be applied for and obtained.
The procedure for doing so is explained in Article 3. Associated with
that procedure is the description of the duties and responsibilities
of the Zoning Administrator pertaining to the issuance of zoning permits
and certificates of occupancy. No building that is to be constructed
under this ordinance can be inhabited without both of these. The applicant
must refer to the Official Zoning Map to identify the district in
which the development or improvement is to occur, and reference the
requirements for the specific proposed use within that district. Each
use within any district is classified as permitted by right or permitted
by special use. All special permitted uses and identified permitted
uses by right must conform to the site development requirements and
associated review procedures in Articles 20, 21 and 22. New construction
or expansion must also conform to the grading and soil erosion control
provisions in Article 30.
Persons proposing property development, particularly larger
residential, commercial or industrial developments, have the option
of adhering to the specific requirements of the district in which
the development is located, utilizing a more flexible design approach
based upon site performance criteria (performance zoning) in Article
18, establishing a planned unit development according to Article 23,
or developing the project utilizing the concept of site condominium
development within the requirements of Article 24.
A quick reference of the dimensional requirements associated
with each district can be found in Article 26, Schedule of Regulations.
Any questions pertaining to the interpretation of a word or term included
in this ordinance can be addressed by referencing the specific word
or term in Article 2, Definitions.
The conditions under which a zoning decision may be appealed,
and the steps to bring an appeal, are described in Article 31, Board
of Appeals. The duties, responsibilities and powers of the Zoning
Administrator, including the issuance of zoning permits and certificates
of occupancy, are defined in Article 32. Finally, the procedure for
amending this ordinance is identified in Article 33.