General. The subdivider shall pay the City of Amery all fees as hereinafter
required and at the times specified before being entitled to recording
of a plat or certified survey map according to a developer agreement.
Engineering fees. The subdivider shall pay a fee equal to the actual cost to the City for all engineering work incurred by the City in connection with the plat or certified survey map, including inspections required by the City pursuant to § 443-25D. The subdivider shall pay a fee equal to the actual cost to the City for such engineering work and inspection as the City Council and/or City Engineer deems necessary to assure that the construction of the required improvements is in compliance with the plans, specifications and ordinances of the City or any other governmental authority. Engineering work shall include the preparation of construction plans, review of preliminary plat, final plat, construction plans, standard specifications and inspection of construction.
Inspection fees. The subdivider shall pay a fee to the City Administrator/Clerk-Treasurer
equal to the actual cost to the City for such inspections as the City
Engineer deems necessary to assure that the construction of the required
improvements is in compliance with the plans, specifications and ordinances
of the City or any other governmental authority.
Administrative fees. The subdivider shall pay a fee to the City equal
to the cost of any legal, administrative or fiscal work which may
be undertaken by the City in connection with the plat or certified
survey map.
Concept plan. There shall be no fee for the City's review of a concept
or sketch plan of a proposed land division. However, such reviews
shall be conducted only as staff time permits.
A subdivider who submits a preliminary plat or condominium plat to
the City Plan Commission and the City Council shall file said preliminary
plat with the City Administrator/Clerk-Treasurer and shall deposit
with the City Administrator/Clerk-Treasurer a fee to cover the costs
of reviewing said application. The fee for a preliminary plat or condominium
plat shall be as prescribed in the Schedule of Fees per each lot.
If the plat is rejected, no part of the fee shall be returned to the
petitioner.
A reapplication fee as prescribed in the Schedule of Fees shall be
paid to the City Administrator/Clerk-Treasurer at the time of reapplication
for approval or amendment of any preliminary plat or condominium plat
which has previously been reviewed.
The subdivider shall pay a fee as prescribed in the Schedule of Fees
for each dwelling unit within the final plat to the City Administrator/Clerk-Treasurer
at the time of first application for final plat approval of said plat
to assist in defraying the cost of review.
A reapplication fee as prescribed in the Schedule of Fees shall be
paid to the City Administrator/Clerk-Treasurer at the time of a reapplication
for approval or amendment of any final plat which has previously been
reviewed.
Should the subdivider submit an amended or revised certified survey,
the resubmittal fee shall be as prescribed in the Schedule of Fees
for each amended or revised certified survey.
Objecting agency review fees. The subdivider shall transmit all fees
required for state agency review to the City Administrator/Clerk-Treasurer
at the time of application. Said review fees shall be retransmitted
to the proper state review agency by the City Administrator/Clerk-Treasurer.
Said fees shall be applicable, where appropriate, to review fees required
by the Wisconsin Department of Transportation, Wisconsin Department
of Administration and the Wisconsin Department of Natural Resources.
Public site fee. If the subdivision does not contain lands to be dedicated as required in this chapter, the City Administrator/Clerk-Treasurer shall require a fee pursuant to § 443-49 for the acquisition and development of public sites to serve the future inhabitants of the proposed subdivision.
Assessments. All outstanding special charges (including, without
limitation, charges for engineering, legal fees, taxes, public works
fees, etc.) due to the City shall be due prior to the signing of the
final plat or certified survey by the City.