[Amended 10-9-2018 by Ord. No. 897]
A. No regulated earth disturbance activities within the Borough shall
commence until approval by the Borough of a stormwater control and
BMP operations and maintenance plan that describes how the permanent
(e.g., post-construction) stormwater controls and BMPs will be properly
operated and maintained.
B. The following language shall be included in the stormwater control
and BMP operations and maintenance plan:
(1) Map(s) of the project area, in a form that meets the requirements
for recording at the offices of the Recorder of Deeds of Montgomery
County, shall be submitted on twenty-four-inch-by-thirty-six-inch
sheets. The contents of the maps(s) shall include, but not be limited
to:
(a)
Clear identification of the location and nature of permanent
stormwater controls and BMPs;
(b)
The location of the project site relative to highways, municipal
boundaries, or other identifiable landmarks;
(c)
Existing and final contours at intervals of two feet, or others
as appropriate;
(d)
Existing streams, lakes, ponds, or other bodies of water within
the project site area;
(e)
Other physical features, including flood hazard boundaries,
sinkholes, streams, existing drainagecourses, and areas of natural
vegetation to be preserved;
(f)
The locations of all existing and proposed utilities, sanitary
sewers, and waterlines within 50 feet of property lines of the project
site;
(g)
Proposed final changes to the land surface and vegetative cover,
including the type and amount of impervious area that would be added;
(h)
Proposed final structures, roads, paved areas, and buildings;
and
(i)
A fifteen-foot-wide access easement to all stormwater controls
and BMPs that would provide ingress to and egress from a public right-of-way.
(2) A description of how each permanent stormwater control and BMP will
be operated and maintained, and the identity and contact information
associated with the person(s) responsible for operations and maintenance;
(3) The name of the project site, the name and address of the owner of
the property, and the name of the individual or firm preparing the
plan; and
(4) A statement, signed by the landowner, acknowledging that the stormwater
controls and BMPs are fixtures that can be altered or removed only
after approval by the municipality.
C. The stormwater control and BMP operations and maintenance plan for
the project site shall establish responsibilities for the continuing
operation and maintenance of all permanent stormwater controls and
BMPs, as follows:
(1) If a plan includes structures or lots that are to be separately owned
and in which streets, sewers, and other public improvements are to
be dedicated to the municipality, stormwater controls and BMPs may
also be dedicated to and maintained by the municipality.
(2) If a plan includes operations and maintenance by a single ownership
or if sewers and other public improvements are to be privately owned
and maintained, then the operation and maintenance of stormwater controls
and BMPs shall be the responsibility of the owner or private management
entity.
D. The municipality shall make the final determination on the continuing
operations and maintenance responsibilities. The municipality reserves
the right to accept or reject the operations and maintenance responsibility
for any or all of the stormwater controls and BMPs.