(1)
|
B, H, I-1, I-2, I-3, I-4, M, R-1, R-2, R-3, R-4, R-5, U
|
Volume x 0.036 (in cubic feet)
|
(2)
|
A-1, A-2, A-3, A-4, A-5, E
F-1, F-2, F-3, S-1, S-2
|
Volume x .027 (in cubic feet)
Up to 1,000,000 cubic feet: $0.0225 per cubic foot. All volume
in excess of 1,000,000 cubic feet: $0.010 per cubic foot
|
(3)
|
Farm use buildings exclusively used for food, sheltering and
livestock
|
Volume x .0010 (in cubic feet)
|
(4)
|
Minimum fee per structure on individual lots (Groups A, B, R)
|
$200.
|
(1)
|
Estimated cost to $50,000.
|
$35. per $1,000. of estimated cost or fraction thereof
|
(2)
|
$50,001. to $100,000.
|
$28. per $1,000. of estimated cost or fraction thereof
|
(3)
|
$100,001. or over
|
$24. per $1,000. of estimated cost or fraction thereof
|
(4)
|
Application fee for the review by the Zoning Officer.
|
$25.
|
(5)
|
Fences, T.V. antennas, satellite dishes, decks, and any other
miscellaneous devices.
|
$35. per $1,000. of estimated cost or fraction thereof
|
(6)
|
Roofing and Siding.
| |
Residential
|
$64.
| |
Commercial
|
$20. per $1,000. of estimated cost or fraction thereof
|
(1)
|
Residential building
|
$150.
|
(2)
|
Commercial building
|
$300.
|
Removal of building from one (1) location to another, or to
a new location on same lot
|
$500.
|
(1)
|
Use groups R-3, R-4, R-5
|
$200.
|
(2)
|
All other use groups
|
$500.
|
Construction of sign (calculated on one side only of double-faced
signs)
|
$4.20 per square foot up to 100 square feet
|
$3.50 per square foot 100 to 350 square feet
| |
$2.50 per square foot 350 square feet & over
| |
$50. minimum
|
(1)
|
Removal of asbestos
|
$25. per $1,000. of estimated cost or fraction thereof
|
(2)
|
Certificate of occupancy for asbestos removal
|
$14.
|
(1)
|
Above-ground pool
|
$156.
|
(2)
|
In-ground pool
|
$215.
|
Alteration
|
$35. per $1,000. of estimated cost or fraction thereof
|
(1)
|
Class 3
| |
Less than 550 square feet
|
$75. per wall
| |
Over 550 square feet
|
$150. per wall
| |
(2)
|
Non-Class 3
| |
Less than 550 square feet
|
$100. per wall
| |
Over 550 square feet
|
$200. per wall
| |
(3)
|
Retaining wall based on alteration
|
$35. per $1,000. of estimated cost or fraction thereof
|
(1)
|
Permit for sales trailer
|
$150.
|
(2)
|
Permit for construction trailer
|
$150.
|
(3)
|
Premanufactured construction, industrialized/modular buildings
|
$15. per $1,000. of estimated cost or fraction thereof
|
(1)
|
Class I buildings
|
$300
|
(2)
|
Class II buildings
|
$200
|
(3)
|
Class III buildings
|
$100
|
A.
|
Fixtures and stacks. Sinks, urinals, water closets, bathtubs,
shower stalls, laundry tubs, floor drains, drinking fountains, dishwashers,
garbage disposals, clothes washers, hot water heaters and similar
devices, and/or any miscellaneous items not herein mentioned specifically
belonging to this class
|
$15.
|
B.
|
Special devices. Grease traps, oil separators, water-cooled
air conditioning units, pumps, boilers, furnaces, sewer ejectors,
backflow devices, water softeners, commercial dishwashers, solar systems
and interceptors
|
$82.
|
C.
|
Utility connections.
| |
(1) Water connections
|
$82.
| |
(2) Sewer connections
|
$82.
| |
D.
|
Fire sprinklers – fire suppression
|
$56.
|
E.
|
Plumbing fees, generally. The minimum fee for any plumbing subcode
permit shall be $58. If more than one (1) subcode is involved, the
minimum construction permit fee also will apply.
|
A.
|
Fixtures and devices.
| ||
(1)
|
Lighting outlets, wall switches, fluorescent fixtures, receptacles
and similar fixtures, and motors or devices less than 1 h.p. or 1
kW:
| ||
(a) One (1)—twenty-five (25)
|
$49.
| ||
(b) Twenty-six (26)—seventy-five (75)
|
$15.
| ||
(2)
|
Electrical ranges, heaters, hot water heaters, dryers, dishwashers,
garbage disposals, air-conditioning units, water pumps and similar
devices—each outlet of a single unit of 20 kW or less
|
$58.
| |
(3)
|
Each additional outlet for devices of 20 kW or more
|
$30.
| |
B.
|
Baseboard heaters.
| ||
(1)
|
One (1) - five (5)
|
$46.
| |
(2)
|
Six (6) - ten (10)
|
$36.
| |
(3)
|
Eleven (11) or more
|
$10.
| |
C.
|
Furnaces and welders (see motor schedule).
| ||
D.
|
Motors or generators.
| ||
(1)
|
Single unit or group not exceeding five (5) motors whose total
capacity does not exceed 1 h.p. or 1 kW
|
$15.
| |
(2)
|
1 h.p. to 20 h.p. or 20 kW
|
$59.
| |
(3)
|
20 h.p. or 20 kW to 75 h.p. or 75 kW
|
$135.
| |
(4)
|
Over 75 h.p. or 75 kW
|
$579.
| |
(5)
|
Transformers
|
$579.
| |
E.
|
Service and meter equipment (new, relocated, replaced or added
to original installation).
| ||
(1)
|
Up to 225 amp service
|
$64.
| |
(2)
|
226 to 1000 amp service
|
$176.
| |
(3)
|
Greater than 1000 amp service
|
$615.
| |
F.
|
Swimming pools.
| ||
(1)
|
Above-ground
|
$75.
| |
(2)
|
In-ground
|
$175.
| |
(3)
|
Fence (new)
|
$58.
| |
G.
|
Protective signaling system.
Smoke alarms, smoke detectors, heat detectors, alarm bells and
lights, pull stations, exit lights, emergency lights and any other
similar devices:
| ||
(1)
|
First twenty (20) devices or fraction thereof
|
$45.
| |
(2)
|
Each additional five (5) devices or fraction thereof
|
$15.
| |
H.
|
Telephone jack wiring.
| ||
(1)
|
For the first five (5) jacks
|
$15.
| |
(2)
|
Over five (5) jacks
|
$5.
| |
I.
|
Burglar alarm system.
|
$49.
| |
J.
|
Electrical signs.
|
$64.
| |
K.
|
Solar photovoltaic systems.
| ||
(1)
|
One (1) to fifty (50) kW
|
$115.
| |
(2)
|
Fifty-one (51) to one hundred (100) kW
|
$215.
| |
(3)
|
Greater than one hundred (100) kW
|
$576.
| |
L.
|
Electrical permits, generally.
The minimum fee for any electrical permit shall be $58. If more
than one (1) subcode is involved, the minimum construction permit
fee also will apply.
|
A.
|
Fireplaces.
|
$68.
| |
B.
|
Wood burning stoves.
|
$68.
| |
C.
|
Gas and/or oil heaters.
|
$68.
| |
D.
|
Tank installation or removal.
| ||
(1)
|
One (1) to one thousand (1,000) gallons
|
$139.
| |
(2)
|
Over one thousand (1,000) gallons
|
$189.
| |
E.
|
Pre-engineered system (commercial).
|
$129.
| |
F.
|
Commercial kitchen exhaust system.
|
$134.
| |
G.
|
Standpipes.
|
$299.
| |
H.
|
Fire protection systems.
| ||
(1)
|
One (1) to twelve (12)
|
$89.
| |
(2)
|
Thirteen (13) to one hundred (100)
|
$164.
| |
(3)
|
One hundred one (101) to two hundred (200) (Commercial)
|
$289.
| |
(4)
|
Two hundred one (201) to four hundred (400) (Commercial)
|
$795.
| |
(5)
|
Four hundred one (401) to one thousand (1,000) (Commercial)
|
$1,049.
| |
(6)
|
Over one thousand (1,000) (Commercial)
|
$1,475.
| |
I.
|
Fire alarm devices.
Smoke alarms, smoke detectors, heat detectors, alarm bells and
lights, pull stations, exit lights, emergency lights and any other
similar devices:
| ||
(a)
|
One (1) to twelve (12)
|
$49.
| |
(b)
|
Thirteen (13) to twenty (20)
|
$58.
| |
(c)
|
Twenty-one (21) to one hundred (100)
|
$135.
| |
(d)
|
One hundred one (101) to two hundred (200)
|
$193.
| |
(e)
|
Two hundred one (201) to one thousand (1,000)
|
$640.
| |
(f)
|
Over one thousand (1,000)
|
$798.
| |
J.
|
Fire subcode fees, generally.
The minimum fee for any fire subcode permit shall be $58. If
more than one (1) subcode is involved, the minimum construction permit
fee also will apply.
|
A.
|
The fees in this Section 113-5 are in lieu of plumbing fees when the mechanical subcode is used and for replacement work.
| ||
B.
|
Use groups R-3 or R-5 only.
| ||
C.
|
Fees.
| ||
(1)
|
Water heater
|
$65.00
| |
(2)
|
Steam or hot water boiler, furnace
|
$85.00
| |
(3)
|
Air conditioning only
|
$50.00
| |
(4)
|
Air conditioning when replaced with a furnace
|
no fee
| |
(5)
|
Hydronic piping Hydronic piping for geothermal, baseboard, floor
heating, etc. (includes hydrostatic pressure test where applicable)
|
$35.00
| |
(6)
|
Fireplaces
|
$50.00
| |
(7)
|
Generator or pool heater
|
$50.00
| |
(8)
|
Fuel oil tank up to 1000 gallons
|
$139.00
| |
(9)
|
Fuel oil tank 1000 to 2000 gallons
|
$189.00
| |
(10)
|
Gas, oil or LPG systems (including rearrangement, extension
or new).
| ||
(a) Use Group R-3 or R-5 piping
|
$65.00
| ||
(b) All other use group piping
|
$95.00
|