[Amended 5-8-2024 by Ord. No. 4-24]
A. The improvements prescribed in this chapter are required as a condition
of approval of a subdivision or land division. The required improvements
described in this chapter and the Subdivision Improvement Policy shall
be installed, furnished and financed at the sole expense of the land
divider or subdivider. The cost of such improvements may, at the sole
discretion of the Board, be financed through special assessments.
B. Nonspecified standards. The following required improvements in this
chapter shall be installed in accordance with adopted Greenville Standard
Specifications and Details and Subdivision Improvement Policy. Where
standards and specifications have not been adopted, the improvements
shall be made in accordance with good engineering practices and approved
prior to the start of construction by the engineer.
[Amended 5-8-2024 by Ord. No. 4-24]
The land divider/subdivider shall design and construct streets,
roads and alleys based on the requirements of this chapter, the Standard
Specifications and Details, the Subdivision Improvement Policy, and
all roadway construction and materials used shall be installed in
accordance with the construction methods as listed in the appropriate
sections of the "State of Wisconsin Department of Transportation Standard
Specifications for Road and Bridge Construction" and its supplements,
whichever is more restrictive. The design requirements of this chapter
shall apply to all streets and roads proposed for dedication to Greenville,
regardless of whether such streets or roads are part of a new subdivision
or certified survey map.
A. Street construction. After sanitary sewer, storm sewer, water, and
other necessary utilities have been installed, if required by Greenville,
the land divider/subdivider shall construct and dedicate as part of
the land division/subdivision, streets and curbs and gutters.
B. Completion of street construction.
(1) The Board may issue a waiver of these requirements in unusual or
special circumstances such as excessively severe weather conditions,
heavy construction temporarily in area or construction material shortages
(such as concrete or asphalt). The issuance of a waiver shall be at
the sole discretion of the Board.
(2) The land divider/subdivider requesting a waiver shall do so in writing,
presenting such information and documentation as required by the Board.
The waiver shall detail which improvement requirements are temporarily
waived and for what period of time.
C. Curb and gutter. After the installation of all utility and stormwater
drainage improvements, the land divider/subdivider shall construct
concrete curbs and gutters, where required, in accordance with plans
and standard specifications approved by the Board. The Board shall
require the installation of storm sewer and curb and gutter in all
subdivisions. Wherever possible, provision shall be made at the time
of construction for driveway access curb cuts.
The subdivider shall pay a reasonable fee for every lineal foot
of urbanized road frontage in the subdivision for the purpose of planting
street trees. This fee is to be determined by the Board and is kept
in an account by Greenville until the subdivision can be planted;
the fee shall be paid prior to recording of the final plat or CSM.
At the discretion of Greenville, fees may be paid by lot owners at
the time of building permit application as their fair share of the
subdivision's street tree planting costs. Street trees will be planted
by Greenville, or a designee thereof, according to the Greenville
Arboricultural Specifications Manual.
The land divider/subdivider shall install at the intersections
of all streets proposed to be dedicated a street name sign of a design
and installation specified by the Engineer.
The land divider/subdivider shall provide for the installation
of streetlights according to a plan approved by Greenville according
to the power company specifications.
A. Decorative lighting fixtures shall be required within the Village.
B. Streetlights shall be operable at the time electricity is made available.
C. All streetlighting costs, including operation and maintenance, shall
be annually assessed by Greenville to all lots created by the land
division/subdivision on an equal basis and such assessment shall be
noted on the face of the certified survey map or subdivision plat.
D. The land divider/subdivider shall pay the utility directly for the
cost of streetlight installation.
E. Lighting shall be dark-sky compliant.
For a CSM or subdivision plat served by municipal sewer and
water created after January 1, 2004, directly adjoining three or more
lots on a CSM or subdivision plat recorded prior to January 1, 2004,
the Board may require the minimum lot sizes for new lots directly
adjoining the established lots of 80% of the average lot size of the
established lots or 20,000 square feet, whichever is less, and a minimum
rear yard of not less than 50 feet as a lot size transition area.