[Adopted 10-7-2019 by Ord. No. 2019-02]
As used in this article, the following terms shall have the
meanings indicated:
The Engineer of Straban Township.
A cavity formed by cutting, digging or scooping.
Any street within the Township that has been paved, repaired,
or otherwise opened or excavated by the Township or an authorized
agent of the Township within the last two years from the date of adoption
of this article.
Any person to whom a permit may be issued under the terms
of this article.
Any individual, partnership, firm, corporation, association,
trust, estate, or any other legal entity or their legal representatives,
agents or assigns. The masculine includes the feminine, the singular
shall include the plural where indicated by context.
The paved area of any public street, highway, sidewalk, alley,
avenue or other public grounds within the Township.
It shall be unlawful for any person to make any opening or excavation
in any right-of-way of the Township unless and until a permit therefor
has been issued as hereinafter provided. The Zoning Officer shall
be responsible for the issuance of permits under the conditions of
this article and upon consent from the Township Engineer or Township
Roadmaster. The Zoning Officer shall have the right to refuse to issue
such permit whenever in his judgment such opening or excavation would
be hazardous or otherwise undesirable under the circumstances for
which the particular permit has been requested. The terms of this
article shall not apply to the opening or excavation of any right-of-way
by the Township or an agent authorized by the Township.
A.
Any person wishing to make any opening or excavation in any right-of-way
of the Township shall, not less than 14 days in advance of the tentative
time such work is to commence, submit an application for a permit
to do such work. Such application shall be submitted on forms prepared
by the Township for such purpose and available at the Township office.
In all cases, the application shall be submitted in the name of the
person making and/or legally responsible for the opening or excavation,
as well as, if applicable, the property owner for whom the cut or
excavation is being undertaken. In the event that an applicant must
make multiple cuts within a right-of-way as part of one project, all
cuts can be contained within one application; however, fees will be
based on the total number of excavations.
B.
In the event of any emergency in which a sewer or water main, conduit,
pipe or utility in or under any street or within the right-of-way
breaks, bursts or otherwise is in such condition as to immediately
endanger the property, life, health or safety of any individual, the
person owning or controlling such sewer main, conduit pipe or utility,
without first applying for and obtaining an excavation permit hereunder,
shall immediately take proper emergency measures to cure or remedy
the dangerous condition. However, such person shall apply for an excavation
permit not later than the end of the next business day.
A.
A permit fee in the amount as set forth in the Township Fee Schedule,
as amended from time to time by resolution of the Board of Supervisors,
shall be charged by the Township for the issuance of an excavation
permit, which shall be in addition to all other fees for permits or
charges relative to any proposed construction work, with the following
exceptions:
(1)
Additional fees. If the Township anticipates that the cost of reviewing
the required application information or inspecting the permitted work
will exceed the application or inspection fees listed in the Township
Fee Schedule by a significant amount, the following additional fees
will be assessed:
(a)
Additional application fee. The Township will estimate the additional
amount of salary, overhead and expenses, the permit will so indicate,
and the permittee shall be charged for additional salary, overhead
and expenses incurred by the Township for administration.
(b)
Additional inspection fees. If the Township determines that
the permitted work is of sufficient magnitude or importance to warrant
assignment of one or more persons to inspect the permitted work on
more than a spot inspection basis, or more than the typical number
of inspections are anticipated, the permit will so indicate and the
permittee shall be charged for additional salary, overhead and expenses
incurred by the Township for inspection.
(c)
The charges will be calculated either on an actual basis or
a standard unit cost basis.
(2)
Newly paved streets. Should a permit be applied for to excavate within
or open a newly paved street, a diminution fee will be added to the
permit fees listed in the Township Fee Schedule.
B.
No permit shall be issued by the Township until all fees have been
paid.
A.
Before an excavation permit is issued, the applicant shall deposit
with the Township security in the form of a performance bond, irrevocable
letter of credit, certified check, cash, or other security acceptable
to the Township to be held without interest, in the amount as approved
by the Township Engineer. A certificate or other evidence from an
insurance company certifying that the permittee has comprehensive
general liability insurance is also required. The required security
shall be conditioned upon completion of all work required as a result
of the excavation which was made in the right-of-way and upon payment
by the permittee of all costs incurred by the Township and/or others
as a result of such work. The security shall remain in place for two
years to allow for two years of seasonal temperatures prior to a final
inspection. All work within the Township right-of-way shall be performed
within the following standards:
(1)
Publication No. 408, Specifications.
(2)
Publication No. 35, Approved Construction Materials Bulletin 15).
(3)
Publication No. 72, Standards for Roadway Construction.
(4)
Straban Township Trench Restoration Detail and any other applicable
Township regulations for roadway construction/excavation.
B.
Prior to the Township releasing the bond, the Township Engineer and/or
other appropriate Township staff shall inspect the excavation and
determine whether all work was properly completed. All pavement restoration
shall be in accordance with the Straban Township Trench Restoration
Detail. Restoration of disturbed areas within the right-of-way but
outside of the pavement shall be done in a manner to restore the area
to the conditions existing, or better than, prior to the disturbance,
which may include placement of stone, seeding, mulching, etc.
C.
The general liability insurance shall be written on a comprehensive
form, including explosion coverage, if needed, and hold the Township
and its officers harmless against any and all claims arising from
the excavation permit for which the Township, Board of Supervisors,
and any Township officer may be made liable by reason of any accident
or injury to persons or property through the fault of the permittee
either in not properly guarding the excavation or for any other injury
resulting from the negligence of the permittee. Recovery on such bond
for any injury or accident shall not exhaust the bond, but it shall
in its entirety cover any or all future accidents or injuries during
the excavation work for which it is given. In the event of any suit
or claim against the Township by reason of the negligence or default
of the permittee, upon the Township's giving written notice to the
permittee of such sit or claim, any final judgment against the Township
requiring it to pay for such damage shall be conclusive upon the permittee.
D.
The aforesaid insurance policy for general liability is to protect
the Township and others against damage or claims arising out of the
work, and the certificate of insurance shall provide that the policy
shall be in force at the time of the application and cannot be canceled
without 30 days' prior notice to the Township. Said bond and insurance
certificate need not be submitted until the Township Engineer and/or
other appropriate Township employee has indicated that a permit may
be issued, but no permit shall be issued until said bond and certificate
are submitted.
Should any permittee, person or any subcontractors working on
behalf of a permittee or person be responsible for four distinct excavations
or openings of a street, all of which are within 100 feet, it shall
be the responsibility of the permittee and/or person to overlay the
entire width of the street corresponding to the 100 linear feet which
contains the excavations with the following exceptions:
A.
The entity performing the excavations is the Township, or a contractor
working on behalf of the Township.
B.
The Township Roadmaster, Township Engineer, or appropriate Township
staff have inspected the roadway and determined that the overlay is
not necessary due to the condition of the roadway or future paving
plans on the roadway.
A.
It shall be the duty of any person to whom a permit is issued or
by whom any opening or excavation is made as aforesaid to provide
and maintain proper and adequate guards, barriers and lights to prevent
accidents, and they shall assume all risks and be liable for all damages
by reason of the openings and excavations and by reason of any failure
to properly fill the hole or trench and maintain the disturbed surface
in a safe condition, and shall acknowledge that the permittee shall
indemnify the Township from any and all claims related to the excavation
of the street in the application for a driveway permit.
B.
The permittee shall be responsible for the safety of pedestrians
and vehicular traffic during the course of the work and shall provide
suitable barricades and warning lights and shall at all times maintain
the flow of traffic upon the street within which the excavation is
made, unless specific authority to close the street is obtained. Watchmen
shall be provided and kept on duty whenever necessary to maintain
the proper flow of vehicular traffic or otherwise as required by the
Township. All traffic control shall be in accordance with PennDOT
Publication 213, Temporary Traffic Control Guidelines, as amended.
C.
If a permittee fails to institute adequate protective measures as
required in this section, the Township may, in its discretion and
in consideration of the public health, safety and welfare, provide
adequate safety measures. The permittee shall be responsible for any
and all costs, including personnel time, which the Township may incur,
in any attempt to provide for the safety of pedestrians and/or vehicular
traffic due to the permittee's failure to institute adequate safety
measures as required by this section. In no case shall the Township
assume liability for any of its attempts to provide for the safety
of pedestrians and/or vehicular traffic, and the permittee shall indemnify
the Township of all liability. Any costs charged under this subsection
shall be paid within 30 days of being invoiced to the permittee and
shall be collected in any manner prescribed bylaw.
If the opening/excavation within the right-of-way is not properly
completed to the satisfaction of the Township Engineer, written notification
shall be sent by the Township to the permittee and the property owner
for whom the cut and excavation was undertaken, which notification
shall specify the defects and require repair, replacement or completion
to the satisfaction of the Township Engineer within 15 days from the
date of the notification. If the cut/excavation is not repaired, replaced,
or completed within 15 days, the Township may repair, replace, or
complete the work in the manner deemed proper by the Township Engineer,
and all costs related thereto shall be assessed to the permittee or
the property owner for whom the cut or excavation was undertaken.
Any person violating this article shall, upon a summary conviction
before a District Justice, be sentenced to pay a fine of not more
than $1,000 and costs of prosecution or shall undergo imprisonment
for not more than 30 days, or both.