All proposed developments and subdivisions shall comply with all applicable land, block, lot, setback, density and other requirements of Chapter
118, Zoning, and this chapter.
All loading facilities shall conform to the standards and regulations of Chapter
118, Zoning and this chapter and shall be designed to minimize conflicts with pedestrian and with passenger automobile circulation.
The stormwater management plan shall include all information
required by and be consistent with the standards of the Township stormwater
management as enacted, amended and in effect at the time of the application's
official filing date, and in conformance with the Pennsylvania Storm
Water Management Act (Act 167), as amended, 32 P.S. § 680.1 et
seq., and other state, county and Township regulations that may also
be applicable. The Township and the Westmoreland County Conservation
District shall review the stormwater management plan. The plan shall
not be approved by the Board of Supervisors if the Township Engineer
and the Westmoreland County Conservation District does not approve
the stormwater management plan. The Township Engineer shall provide
a written report to the Board of Supervisors stating the deficiencies
with the stormwater management plan and those reasons shall be a basis
for modification or denial of the plan.
Concrete monuments shall be set at the intersection of all lines
forming angles in the boundary of the subdivision. Iron or steel markers
shall be set at the beginning and ending of all curves along street
property lines; at all points where lot lines intersect curves, either
front or rear; at all angles in property lines of lots; and at all
other lot corners.