Every use of fireworks for an authorized agricultural purpose within the limits of the Township shall be in connection with the raising of crops and the protection of crops from bird and animal damage.
An application for the use of fireworks for an agricultural purpose shall be made in writing to the Township at least 45 days in advance of the date of the use of fireworks, setting forth the agricultural necessity for the discharge of fireworks, specific type of fireworks to be discharged, proposed dates and times of the discharge of fireworks, a detailed site plan, the names and addresses of all property owners located within 500 feet of the outermost edges of a proposed firework's fall out perimeter, the name and address of the operator, and the name and address of the owner(s) of the grounds on which the use of fireworks is to be held, with the consent of such owner(s) thereto in writing attached. All applicants, prior to the issuance of a permit, shall pay the Township an application fee of $100; and provide proof of the required bond. All such fees identified herein may be amended by resolution of the Board, from time to time. A permit for the discharge of fireworks for an approved agricultural use shall be limited to fireworks, dates, times and locations that permit the applicant to satisfy the purpose of this article.