Upon acceptance of the as-built plan information by the Township
Engineer, four paper copies of the as-built plan shall be submitted
to the Township.
|
Thereupon the Township Engineer shall inspect all of the improvements
covered by the obligor's request and shall file a detailed list and
report, in writing, with the Township Committee, and shall simultaneously
send a copy thereof to the obligor not later than 45 days after receipt
of the obligor's request.
|
The list prepared by the Township Engineer shall state, in detail, with respect to each required improvement determined to be incomplete or unsatisfactory, the nature and extent of the incompleteness of each incomplete improvement or the nature and extent of, and remedy for, the unsatisfactory state of each completed required improvement determined to be unsatisfactory. The report prepared by the Township Engineer shall identify each required improvement determined to be complete and satisfactory together with a recommendation as to the amount of reduction to be made in the performance guarantee relating to the completed and satisfactory improvement, in accordance with the itemized cost estimate prepared by the Township Engineer and appended to the performance guarantee pursuant to § 35-13-2.1.
|