Upon presentation of proper credentials, duly authorized representatives
of Middletown Township may enter at reasonable times upon any property
within the Township to inspect the condition of the stormwater structures
and facilities in regard to any aspect regulated by this chapter.
In the event that a person fails to comply with the requirements
of this chapter, or fails to conform to the requirements of any grading
and excavating (aka soil erosion and sedimentation control) permit
or stormwater management plan approval issued hereunder, the Township
shall provide written notification of the violation. Such notification
shall set forth the nature of the violation(s) and establish a time
limit for correction of these violations(s). Failure to comply within
the time specified shall subject such person to the penalty provision
of this chapter. All such penalties shall be deemed cumulative. In
addition, the Township may pursue any and all other remedies available
under state or federal law. It shall be the responsibility of the
owner of the real property on which any regulated activity is proposed
to occur, is occurring, or has occurred, to comply with the terms
and conditions of this chapter. In the case where the violation poses
an immediate threat to the health, safety, and welfare of the community,
no notice under this section shall be required.
Middletown Township Council is hereby authorized and directed
to enforce all of the provisions of this chapter. All inspections
regarding compliance with the stormwater management site plan or simplified
stormwater management site plan shall be the responsibility of the
Township Engineer or other qualified persons designated by the Township
as directed by The Township.
A. A set of design plans approved by the Township shall be on file at
the site throughout the duration of the construction activity. Periodic
inspections may be made by the Township or designee during construction.
B. Adherence to approved plan. It shall be unlawful for any person, firm, or corporation to undertake any regulated activity under §
198-4 on any property except as provided for in the approved stormwater management site plan, simplified stormwater management site plan and pursuant to the requirements of this chapter. It shall be unlawful to alter or remove any control structure required by the plan pursuant to this chapter or to allow the property to remain in a condition which does not conform to the approved plan.
C. Suspension and revocation of approved stormwater management plan.
(1) Any approval under this chapter may be suspended or revoked by the
Township for:
(a)
Noncompliance with, or failure to, implement any provision of
the approved stormwater management plan.
(b)
A violation of any provision of this chapter or any other applicable
law, ordinance, rule, or regulation relating to the project.
(c)
The creation of any condition or the commission of any act during construction or development which constitutes or creates a hazard or nuisance, pollution or which endangers the life or property of others, or as outlined in Article
VIII of this chapter.
(2) A suspended approval of a stormwater management plan shall be reinstated
by The Township when:
(a)
The Township Engineer or his designee has inspected and approved
the corrections to the stormwater management and erosion and sedimentation
control measure(s), or the elimination of the hazard or nuisance;
and/or
(b)
The violation of this chapter, law, rule or regulation has been
corrected.
(3) A stormwater management plan approval cannot be reinstated. The applicant
may apply for a new stormwater management plan approval under the
procedures outlined in this chapter.
(4) The decision to suspend or revoke a permit may be appealed to Township
Council within 30 days of the date of suspension or revocation.