a. 
Applications for development within the Borough shall conform to the design standards provided in this Article. Where applicable, conformance with the Master Plan regarding location of streets, rights-of-way, parks and playgrounds and other such uses shall be required.
b. 
Where a particular project requires construction not covered in these standards, the proposed design will be evaluated on the basis of normally accepted engineering and/or architectural design practices. In the case of nonconstruction related items, the proposed design will be evaluated on the basis of normally accepted engineering, architectural and/or planning practices.
c. 
The Board, when acting upon development applications shall have the power to grant such exceptions from the requirements of this Article as may be reasonable and within its general purpose and intent, if the literal enforcement of one or more provisions is impracticable or will exact undue hardship because of peculiar conditions pertaining to the land in question.
All buildings shall be designed with a parking area and access to a public street. When a site contains more than one (1) building or use, a common architectural theme shall be reflected through the choice of building materials, architectural style, sign controls and color coordination. Special consideration should be given to pedestrian access.
Each individual lot shall have access to a public street. Loading areas and access to loading areas shall be provided and shall be separate from parking areas and aisles. A landscaped buffer with plantings and/or mounding shall be provided between commercial and residential uses. Such buffer shall be a minimum of twenty (20) feet in depth. No use shall create glare, heat, odor, noise or physical vibrations perceptible at a property line. Where a site contains more than one building, a compatible architectural theme shall be reflected through the choice of building materials and the use of landscaped open space.
All residential developments must comply with the most recent edition of the New Jersey Residential Site Improvement Standards and all its amendments.
[New]
a. 
Lot dimensions and area shall not be less than the requirements of the zoning regulations.
b. 
Insofar as practical, side lot lines shall be at right angles to straight street lines and radial to curved street lines.
No lot shall be created on which construction will be rendered impracticable because of existing physical conditions. Where that situation occurs the affected land shall be incorporated into the adjoining lots or contiguous open space.
Block length and width or acreage within bounding roads shall be such as to accommodate the size of lot required by this chapter and to provide for convenient access, circulation, control and safety of street traffic.
[New]
All residential developments must comply with the most recent edition of the New Jersey Residential Site Improvement Standards (RSIS) and all its amendments.
a. 
A particular tract may include more than one (1) phase or project.
b. 
Final approval may be granted separately for each phase or project.
Pedestrian circulation shall be provided and shall be separate from motor vehicle circulation wherever possible.
The dwelling unit mix for a particular tract shall be such that no more than seventy-five (75%) percent of the total number of dwelling units shall have the same number of bedrooms. The dwelling unit mix for each phase of a development or for a project on a tract need not reflect the dwelling unit mix prescribed for the entire tract. In such cases, the Board shall include, as a condition of final approval on a particular phase or project, the provision that future projects or phases shall bring the dwelling unit mix into conformance with the above standard.
To the greatest extent possible, the site plan shall divide intended uses into individual small groups using such features as quadrangles, courts, clustering and landscaping. The monotonous repetition of elements shall be avoided.
[New]
No certificate of occupancy shall be issued for any use until documentation is provided to the Construction Code Enforcement Official that the intended use(s) will comply with the performance standards enumerated below and as per State Uniform Construction Code Act N.J.S.A. 52:27D-119 et seq.
a. 
Storage and Disposal of Waste. No materials or wastes shall be deposited upon a lot in such form or manner that they may be transferred off the lot by natural causes or forces, nor shall any substances be deposited which can cause an underground aquifer to fail to meet applicable State water quality standards. All materials or waste which might cause fumes or dust or which constitute a fire hazard or which may be edible or otherwise attractive to rodents or insects shall be stored indoors and enclosed in appropriate containers adequate to eliminate such hazards. All hazardous materials used on the site shall be disposed of in a safe manner in accordance with applicable State and Federal regulations.
b. 
Ventilation. No use shall obstruct the natural ventilation of adjacent uses. Further, no air conditioners or exhaust fans shall be permitted to discharge exhausted air unless setback from all property lines ten (10) feet or more or unless equipped with baffles to deflect the discharged air away from adjacent uses.
All residential developments must comply with the most recent edition of the New Jersey Residential Site Improvement Standards (RSIS) and all its amendments. Where the RSIS do not address a specific design standard, then the relevant standard addressed in this section shall apply.
[New]
Each development shall have access to a street. Such access shall be designed and constructed for, and shall be evaluated by the Board as to adequacy for entering and exiting vehicles and for emergency vehicles.
a. 
All lots shall have frontage on a public street except that lots for residential uses other than detached single family residential uses may have access from a private street, as approved by the Board.
b. 
All public streets shall be located in a right-of-way dedicated to the Borough and having the following minimum widths, measured from lot line to lot line unless another width is specifically recommended in an adopted element of the Master Plan or on an adopted Official Map for the Borough:
Arterial streets
60 feet
All other streets
50 feet
Developments that adjoin or include existing public streets which do not conform to the above required right-of-way widths shall dedicate the required additional width along one (1) or both sides of said street. If development is proposed along one (1) side of the street only, then one-half (1/2) of the required extra width shall be dedicated.
a. 
Residential developments for other than detached single family residential uses may include private streets.
b. 
No site plan controlling access to streets shall be approved except when the control and disposal of said land controlling access has been placed with the Borough or unless a protective deed restriction has been approved by the Board.
c. 
The applicant shall demonstrate, prior to final approval, a means to maintain the streets. The Board shall require a maintenance agreement. This agreement shall include the Borough's right to enter the premises to make repairs and/or conduct other necessary maintenance. The cost for such repairs and/or maintenance by the Borough shall be paid by the property owner(s) and shall include all legal, administrative, clerical, planning and engineering costs associated with the work.
Streets shall be designed to converge traffic flows at convenient access points. Street design shall discourage through traffic within residential areas. To facilitate traffic flows at major intersections, turning lanes may be required. Acceleration and deceleration lanes shall be installed at exits and entrances to commercial and industrial areas unless the Board is satisfied that such lanes are not required.
a. 
The arrangement of streets shall be such as to provide for the extension of existing streets.
b. 
Private access to nonresidential uses shall not be through a residentially zoned lot or lots.
c. 
The approval by the Board of any map or plat delineating streets shall in no way be construed as an acceptance of any street indicated thereon.
Clear sight triangles shall be provided at all street intersections. Within such triangles, no vision obstructing object shall be permitted within the height of thirty (30) inches and eight (8) feet above the elevation of the intersecting street. The size of the sight triangle shall be as established in subsection 30-507.1.
All culs-de-sac of a permanent nature (where provision for the future extension of the street to the boundary of the adjoining property is impractical or impossible) or of a temporary nature (where provision is made for the future extension of the street to the boundary line of an adjoining property) shall be no more than six hundred (600) feet in length and provide access to no more than forty (40) dwelling units and shall provide a turnaround at the end with a radius of fifty (50) feet at the curbline. For public streets, an additional ten (10) foot wide utility and planting strip shall be provided around the entire cul-de-sac for a total right-of-way radius of sixty (60) feet. The center point for the radius shall be off-set to a point where the radius becomes tangent to the right curbline of the associated street.
a. 
Subgrade. Topsoil shall be stripped from the proposed roadbed for the entire width of pavement, shoulders, gutters, curbs, sidewalks or other required improvements. All unsuitable material shall be removed. The subgrade shall be compacted to a density of not less than ninety-five (95%) percent under optimum moisture conditions. All embankments shall conform to current New Jersey State Highway Specifications, as amended.
b. 
Pavement Materials. The quality of surfacing and base materials used shall adhere to the minimum standards set forth by the County or State when said street is within their jurisdiction. For streets under the jurisdiction of the Borough the following standards shall apply:
1. 
As a minimum, any new street shall be constructed according to the specifications and procedures set forth in the New Jersey State Highway Department Standard Specifications (1983) as amended.
2. 
The base course shall be five (5) inches stabilized base placed on four (4) inches of subbase Type 5A, which has been inspected and approved by the Borough Engineer.
3. 
The surface course for all classes of Borough streets shall consist of one and one-half (1 1/2) inches of bituminous concrete, Type FABC-1, Mix No. 5.
4. 
An alternate pavement section may be approved by the Board if the applicant can demonstrate to the Board's satisfaction that the proposed pavement section is adequate to serve the anticipated volume and type of traffic. However, for any pavement section approved, the surface course must be bituminous concrete Type FABC-1, Mix No. 5.
Pavement width shall be as follows:
Arterial streets
40 feet with 20 feet on either side of centerline
All other streets
30 feet with 15 feet on either side of centerline
The Board may approve a reduction in the pavement width as follows:
a. 
Local Public and Private Streets. If the street is a cul-de-sac providing access to not more than twenty (20) dwelling units or if the street provides no parallel parking to meet the parking requirements of subsection 30-520.1, the minimum pavement width may be reduced to twenty-four (24) feet.
b. 
Collector Streets. If the street will not have on-street parking, or residential uses with frontage on the collector, the pavement width may be reduced to twenty-six (26) feet, with a four (4) foot wide graded shoulder on each side.
Curbing for Borough streets shall be granite block with a six (6) inch curb face on all streets, except on arterial streets, which shall have an eight (8) inch curb face. However, on streets under the jurisdiction of the County or State, curbing shall be in accordance with the requirements of the appropriate authority.
An alternate form of curbing may be approved by the Board if the applicant can demonstrate to the Board's satisfaction that a substantial cost savings will result and that no loss in the useful life of the curbing and no increase in maintenance costs will occur. On private streets, the Board may waive the requirements for curbing if the applicant can demonstrate that no adverse impact will occur to the pavement, that drainage will not be impaired, and that the drainage system and facilities can easily be maintained.
On Borough streets other than minor streets and on private streets, the Board may waive the requirements for curbing if the street is specifically designed for construction without curbing, if drainage will not be impaired, if there will be no adverse impact to the pavement, if the drainage system can easily be maintained, and if it can be shown that any increased cost in maintenance will be offset by the overall improvement in road design.
a. 
If Belgian block, stones shall not be less than ten (10) inches in height and shall be constructed to show a vertical face above the roadway pavement of six (6) inches,
b. 
If concrete, the curbing shall meet the following specifications:
1. 
The concrete to be used for curbs shall be Class B Concrete as specified in the New Jersey State Highway Specifications for Curbs and Gutters.
2. 
Expansion joints shall be provided at maximum intervals of ten (10) feet and shall be sealed as specified by the Borough Engineer.
3. 
The curb at driveway openings shall be depressed to the extent that one and one-half (1 1/2) inches extends above the finished pavement.
4. 
Concrete curbs for local roads shall be eight (8) inches wide at the base and not less than seven (7) inches wide at the top. Their height shall not be less than twenty inches (20") and shall be constructed to show a vertical face above the pavement of six (6) inches. The rear top corner of the curb shall have a radius of one-fourth (1/4) inch, and the front top corner shall have a radius of one and one-half (1 1/2) inches.
c. 
Depressed curb ramps for the handicapped shall be installed at all curb radii where sidewalks intersect the curb in accordance with the laws of the State of New Jersey.
a. 
Sidewalks shall be installed along Borough streets in all developments in order to ensure safe pedestrian movement within the development and into adjacent areas. Additionally, sidewalks shall be installed in all areas wherever pedestrian traffic is anticipated to occur such as between parking areas and buildings or between buildings. Sidewalks shall be four (4) feet wide and constructed of four (4) inch thick Class B concrete, as specified in the New Jersey State Highway Specifications, as amended, and in accordance with the Borough Standard Details.
b. 
The Board may waive or modify the requirements for sidewalks if it is demonstrated by the applicant that adequate provision for pedestrian circulation has been provided through such methods as pedestrian paths, except that sidewalks may still be required along principal routes to schools.
c. 
Driveway aprons shall be constructed between the curb (or edge of pavement) and the sidewalk, or in the absence of sidewalk, for a distance of four (4) feet back from the curb, (or edge of pavement). The standard for materials shall be six (6) inches of Class B concrete as specified in the New Jersey State Highway Specifications, as amended.
The maximum grade for a new street shall depend on road classifications. Maximum grades shall be as follows:
Maximum
10%
Desirable
4%
Minimum
0.5% to 0.75%
The geometry of roads shall meet the following minimum design criteria:
Rate of Vertical Curvature
(K Values) Rounded for Design
Posted Speed Limit
Vertical Curves Minimum Stopping Sight Distance
Crest Vertical Curves
Sag Vertical Curves
Horizontal Curves Minimum Radius
25 mph or less
150 feet
20
20
200 feet
35 mph
250 feet
40-50
50
350 feet
45 mph
350 feet
80-100
70-90
500 feet
a. 
Positive drainage shall be provided to drain surface water runoff from the roadway pavement.
b. 
A five (5) foot shoulder with a five (5%) percent cross slope shall abut the edge of pavement.
c. 
All swales shall be designed to carry a twenty-five (25) year frequency storm for the drainage area served.
d. 
Drainage swales shall have a maximum side slope of 3:1.
e. 
All swales shall have a minimum grade of one-half (0.5%) percent to prevent silting and a maximum slope that will prevent erosion. Paved inverts and/or energy dissipators may be required.
f. 
The invert of all swales shall be a minimum of three (3) inches below the pavement section.
g. 
All swales shall be hydroseeded or similarly treated to ensure a stable erosion control surface immediately after construction.
h. 
The street right-of-way shall be widened to include all drainage swales where Borough maintenance of such swales will be required to ensure that the drainage system will function in a manner that protects the pavement from stormwater infiltration.
A new street name shall not conflict with or be mistaken for an existing street name in the municipality or postal zip code unless the street is a logical extension of an existing street. The street numbering system shall be as approved by the Borough Engineer.
Street name signs shall be placed at all street intersections within or abutting the development. Such signs shall be of a type approved by the Borough and shall be placed in accordance with the Borough's Standards or at the direction of the Borough Engineer.
[New]
All residential developments must comply with the most recent edition of the New Jersey Residential Site Improvement Standards (RSIS) and all its amendments. Where the RSIS do not address a specific design standard then the relevant standard established in this section shall apply.
The required dimensions of a clear sight triangle shall depend on the posted speed of the uncontrolled or major roadway. The sight triangle shall be laid out so that a driver ten (10) feet from the right-of-way line of the uncontrolled or major street can see approaching traffic at the following distances and an easement controlling construction shall be established for all portions of the clear sight triangle not in a public right-of-way. The sight triangle shall be clear of any obstructions from thirty (30) inches above grade to a point eight (8) feet above grade, except utility poles shall be permitted provided they do not present a safety hazard.
Posted Speed Limit
Minimum Required Clear-Sight Distance
25 mph
250 feet
35 mph
350 feet
45 mph
450 feet
Intersections shall be approached on all sides by a straight and level area, a minimum of forty (40) feet in length the maximum grade of which shall be as follows:
Classification
Maximum Up Grade
Maximum Down Grade
45 mph or greater
2%
2%
25 mph to 44 mph
5%
3%
Intersections shall be separated from adjacent roadway intersections by the minimum distances set forth below. The minimum distance shall be measured centerline to centerline along the intersecting street, and shall be dependent upon the type of intersection and the posted speed limit of the roadway between the two (2) intersections. Two (2) "T" intersections with approaches from opposite directions shall be considered full intersections.
Posted Speed Limit
Full Intersection
"T" Intersection
25 mph
300
200
35 mph
350
250
45 mph
450
300
[New]
All residential developments must comply with the most recent edition of the New Jersey Residential Site Improvement Standards (RSIS) and all its amendments. Where the RSIS do not address a specific design standard then the relevant standard established in this section shall apply.
a. 
All driveways shall be a minimum of ten (10) feet in width and shall be constructed of at least four (4) inches of compacted subbase material and two (2) inches of three-eight (3/8) inch roadway stone or comparable material. Where driveways adjoin paved parking lots, these driveways shall be paved to the same standards as the parking lot. Aprons shall be provided in accordance with the provisions of this chapter.
b. 
Driveway grades shall not exceed ten (10%) percent at any point along the entire length of the driveway. In addition, the driveway grade shall not exceed eight (8%) percent for a distance of eight (8) feet from the curb line and a transition curve shall be provided between said eight (8%) percent grade and any increase in grade.
c. 
The side slopes of driveways shall be topsoiled, seeded, fertilized and mulched or otherwise stabilized to prevent erosion. If banks exceed a 2:1 slope, and the slope face is not stable rock, retaining walls shall be constructed in a manner approved by the Borough Engineer.
d. 
No driveway shall be located within five (5) feet of a side lot line unless it is a common driveway for attached duplex or multifamily dwelling. No driveway pavement area shall be wider than one-half (1/2) the width of a lot.
With the exception of single-family detached dwellings, all off-street parking areas shall meet the following requirements:
a. 
All off-street parking shall be paved with a minimum of one and one-half (1.5) inches of bituminous concrete (FABC) placed on top of a minimum of three and one-half (3.5) inches of stabilized base and a minimum of four (4) inches of compacted subbase, Type 5A, or an equivalent as approved by the Borough Engineer.
b. 
All parking and loading areas shall be curbed with granite block or concrete curbing constructed to Borough Standard specifications unless the applicant can demonstrate that elimination of the curbing will not decrease the useful life of the pavement, have a negative effect on drainage, or increase maintenance costs.
c. 
All parking and loading areas shall have a convenient means of ingress and egress.
1. 
The applicant shall demonstrate to the Board that ingress and egress will not adversely affect the flow of traffic on Borough streets.
2. 
Traffic circulation shall be designed to minimize the use of aisles serving parking areas.
3. 
For nonresidential uses, parking areas with more than twenty-five (25) spaces shall have separate entrances and exits.
4. 
Where a combined entrance and exit is provided, the access road shall be a minimum of twenty-four (24) feet in width.
5. 
Where separate entrances and exits are provided, the minimum roadway width shall be fifteen (15) feet.
d. 
If a parking lot has an area of less than eight thousand (8,000) square feet, an area equal to five (5%) percent of the lot shall be maintained as open space. If a parking lot has an area of greater than eight thousand (8,000) square feet, an area equal to ten (10%) percent of the lot shall be maintained as open space. Said open space shall be within the perimeter of the lot and shall be appropriately planted or designed for the retention of existing trees. All plantings shall be protected by curbing, bumpers or bollards. Within any parking area there shall be at least one two and one-half (2 1/2) (D.B.H) caliper or larger shade tree for each ten (10) spaces.
e. 
All portions of the property not used for off-street parking, loading or access shall be attractively landscaped with lawns, trees and shrubs as approved by the Board. Parking areas visible from a street shall, through the use of landscaping, be intermittently screened.
f. 
Striping and directional and traffic safety signs shall be provided throughout the parking, loading and circulation areas in accordance with the Manual of Uniform Traffic Control Devices.
g. 
All lighting shall be so arranged and shielded to reflect light downward and away from adjoining streets and properties.
Each site plan shall provide for the removal of all solid wastes and shall further provide for temporary on-site storage of all solid waste materials.
Adequate access shall be provided to all solid waste storage facilities. Such access shall accommodate the type of vehicle normally used for the collection of wastes.
a. 
Storage of wastes which produce no discernible odor may be outdoors.
b. 
Outdoor solid wastes storage facilities shall be visually screened from elsewhere on the project and from all property lines.
c. 
Storage of wastes which produce a discernible odor shall be within a building.
Requirements set forth in the Borough of Roseland Municipal Ordinance Number 28-1986, its amendments, and the New Jersey Statewide Mandatory Source Separation and Recycling Act and all subsequent revisions shall be complied with. Specifically, all Subdivision and Site Plan Applications submitted to the Borough must provide for the recycling of designated materials. The following items should be addressed:
a. 
Identify materials to be collected.
b. 
Identify proposed recyclable material storage locations.
c. 
Identify locations where recyclable materials are to be picked up.
d. 
Identify frequency of collections.
e. 
Identify quantity of recyclable materials expected to be generated.
f. 
Where outdoor storage is proposed, the storage area shall be suitably screened from view.
[Ord. No. 5-2000 §§ I and II; amended 3-17-2020 by Ord. No. 01-2020]
a. 
Purpose: The general purpose of this section is to protect and promote the public health, safety and welfare, the quality of life, and the ability to view the night sky by establishing regulations and a process of review for exterior lighting. This section establishes standards for exterior lighting in order to accomplish the following:
1. 
To provide safe roadways for motorists, cyclists and pedestrians;
2. 
To ensure that sufficient lighting can be provided where needed to promote safety and security;
3. 
To protect against adverse offsite impacts of lighting, such as direct glare, light trespass, obtrusive light, sky glow, and excessive lighting;
4. 
To protect and reclaim the ability to view the night sky, and help preserve the quality of life and the tourist experience;
5. 
To promote efficient and cost-effective lighting that will conserve energy and resources to the greatest extent possible;
6. 
To allow for flexibility in the style of lighting fixtures;
7. 
To provide exterior lighting guidelines; and
8. 
To provide assistance to property owners and occupants in bringing nonconforming lighting into conformance with this section.
b. 
Applicability: All exterior lighting installed after the effective date hereof in any and all zoning districts in the Borough shall be in conformance with the requirements established by this section and any other applicable ordinances. This includes, but is not limited to, new lighting, replacement lighting, or any other lighting whether attached to structures, poles, the earth, or any other location, including lighting installed by any third party. All existing lighting installed prior to the effective date hereof in any and all zoning districts in the Borough of Roseland shall be addressed as follows:
1. 
All existing lighting located on a subject property that is part of an application for development or building permit is required to be brought into conformance with this section. Conformity shall occur prior to issuance of a certificate of occupancy, final inspection or final plat recordation, when applicable. For other permits, the applicant shall have a maximum of 30 days from date of permit issuance to bring the lighting into conformance.
2. 
All existing exterior commercial lighting that is not in conformance with this section shall be brought into conformance with this section by June 30, 2018.
3. 
All existing lighting that does not meet the requirement of section 17.124.060 of this title,[1] which states that "any parking, yard or building illumination in (any) zoning (district) shall be so directed as to protect adjacent properties from glare and direct lighting", is required to be brought into conformance with section 17.132 of this title.[2]
[1]
Editor's Note: So in original.
[2]
Editor's Note: So in original.
4. 
All other existing exterior residential lighting, not affected by Subsection b1 and 3 of this section, that does not comply with this section is required to be brought into conformance with this section by June 30, 2019.
5. 
In the event of a discrepancy in applicable ordinances, the most restrictive shall apply.
c. 
Exemptions: The following are not regulated by this section:
1. 
Lighting within public right-of-way or easement for the principal purpose of illuminating streets or roads. No exemption shall apply to any lighting within the public right of way or easement when the purpose of the luminaire is to illuminate areas outside the public right-of-way or any easement, unless regulated with a streetlighting ordinance.
2. 
Lighting for public monuments and statuary.
3. 
Lighting solely for signs (lighting for signs is regulated by the Sign Ordinance).
4. 
Repairs to existing luminaires not exceeding 25% of total installed luminaires.
5. 
Temporary lighting for theatrical, television, performance areas and construction sites.
6. 
Underwater lighting in swimming pools and other water features.
7. 
Temporary lighting and seasonal lighting provided that individual lamps are less than 10 watts and 70 lumens.
8. 
Lighting that is only used under emergency conditions.
9. 
In lighting zones LZ-2, LZ-3 and LZ-4, low voltage landscape lighting controlled by an automatic device that is set to turn the lights off at one hour after the site is closed to the public or at a time established by the authority.
d. 
The Planning Board, the Zoning Board, the Building Official and/or the Zoning Official shall have the authority to require new lighting and/or modification of existing lighting, pursuant to Subsection 30-510.1b1 of this section to meet the requirements of this section.
e. 
Lighting Plans Required: All applications for development and/or building permits shall include lighting plans showing location, type, height, color temperature, lumen output and amount of all proposed and existing fixtures. The applicant shall provide sufficient information to verify that lighting conforms to the provisions of this section. The Planning Board, Zoning Board, the Building Official and/or the Zoning Official shall have the authority to request additional information in order to achieve the purposes of this section.
f. 
Definitions: As used in this section, the following terms shall have the meanings indicated:
ABSOLUTE PHOTOMETRY
Photometric measurements (usually of a solid-state luminaire) that directly measures the footprint of the luminaire.
ARCHITECTURAL LIGHTING
Lighting designed to reveal architectural beauty, shape and/or form and for which lighting for any other purpose is incidental.
ASTRONOMIC TIME SWITCH
An automatic lighting control device that switches outdoor lighting relative to time of solar day with time of year correction.
BACKLIGHT
For an exterior luminaire, lumens emitted in the quarter sphere below horizontal and in the opposite direction of the intended orientation of the luminaire. For luminaires with symmetric distribution, "backlight" will be the same as front light.
BUG
The luminaire classification system that classifies backlight (B), uplight (U) and glare (G) to evaluate luminaire optical performance related to light trespass, sky glow, and high angle brightness control. The BUG ratings are based on a zonal lumen calculation for secondary solid angles, based on data from photometric testing procedures approved by the IESNA.
CANOPY
A covered, unconditioned structure with at least one side open for pedestrian and/or vehicular access. (An unconditioned structure is one that may be open to the elements and has no heat or air conditioning.)
COMMON OUTDOOR AREAS
One or more of the following: a parking lot; a parking; a common entrance or public space structure or covered vehicular entrance shared by all occupants of the domiciles.
CURFEW
A time defined by the governing body when outdoor lighting is reduced or extinguished.
EMERGENCY CONDITIONS
Generally, lighting that is only energized during an emergency; lighting fed from a backup lighting power source; or the path for illuminating of egress solely during a fire or other emergency situation; or, lighting for security purposes used solely during an alarm.
FOOTCANDLE
The unit of measure expressing the quantity of light received on a surface. One footcandle is the illuminance produced by a candle on a surface one foot square from a distance of one foot.
FORWARD LIGHT
For an exterior luminaire, lumens emitted in the quarter sphere below horizontal and in the direction of the intended orientation of the luminaire.
FULLY SHIELDED LUMINAIRE
A luminaire constructed and installed in such a manner that all light emitted by the luminaire, either directly from the lamp or a diffusing element, or indirectly by reflection or refraction from any part of the luminaire, is projected below the horizontal plane through the luminaire's lowest light-emitting part.
GLARE
Lighting entering the eye directly from luminaires or indirectly from reflective surfaces that causes visual discomfort or reduced visibility.
HARDSCAPE
Permanent hardscape improvements to the site including parking lots, drives, entrances, curbs, ramps, stairs, steps, medians, walkways and non-vegetated landscaping that is 10 feet or less in width. Materials may include concrete, asphalt, stone, gravel, etc.
HARDSCAPE AREA
The area measured in square feet of all hardscape. It is used to calculate the total site lumen limit in both the prescriptive method and performance methods. Refer to "hardscape" definition.
HARDSCAPE PERIMETER
The perimeter measured in linear feet is used to calculate the total site lumen limit in the performance method. Refer to "hardscape" definition.
IDA
The International Dark-Sky Association.
IESNA
The Illuminating Engineering Society of North America.
IMPERVIOUS MATERIAL
A material that is sealed to severely restrict water entry and movement.
INDUSTRY STANDARDS LIGHTING SOFTWARE
Lighting software that calculates point- by-point illuminance that includes reflected light using either ray-tracing or radiosity methods.
LAMP
A generic term for a source of optical radiation (i.e., light), often called a "bulb" or tube." Examples include incandescent, fluorescent, high-intensity discharge (HID) lamps, and low-pressure sodium (LPS) lamps, as well as light-emitting diode (LED) modules and arrays.
LANDSCAPE LIGHTING
Lighting of trees, shrubs, or other plant material as well as ponds and other landscape features.
LANDSCAPE LIGHTING, LOW VOLTAGE
Landscape lighting powered at less than 15 volts and limited to luminaires having a rated initial luminaire lumen output of 525 lumens or less.
LED
Light emitting diode.
LIGHT POLLUTION
Any adverse effect of artificial light including, but not limited to, glare, light trespass, skyglow, energy waste, compromised safety and security, and impacts on the nocturnal environment.
LIGHT TRESPASS
Light that falls beyond the property it is intended to illuminate.
LIGHTING
Electric, man-made or artificial lighting. See "lighting equipment."
LIGHTING EQUIPMENT
Equipment specifically intended to provide gas or electric illumination, including, but not limited to, lamp(s), luminaire(s), ballast(s), poles, posts, lens(es), and related structures, electrical wiring, and other necessary or auxiliary components.
LIGHTING ZONE
An overlay zoning system establishing legal limits for lighting for particular parcels, areas, or districts in a community.
LUMEN
The unit of measure used to quantify the amount of light produced by a lamp or emitted from a luminaire (as distinct from "watt," a measure of power consumption).
LUMINAIRE
The complete lighting unit (fixture), consisting of a lamp, or lamps and ballast(s) (when applicable), together with the parts designed to distribute the light (reflector, lens, diffuser), to position and protect the lamps, and to connect the lamps to the power supply.
LUMINAIRE LUMENS
For luminaires with relative photometry, it is calculated as the sum of the initial lamp lumens for all lamps within an individual luminaire, multiplied by the luminaire efficiency. If the efficiency is not known for a residential luminaire, assume 70%. For luminaires with absolute photometry, it is the total luminaire lumens. The lumen rating of a luminaire assumes the lamp or luminaire is new and has not depreciated in light output.
LUX
The SI unit of illuminance. One lux is one lumen per square meter. 1 Lux is a unit of incident illuminance approximately equal to 1/10 footcandle.
MOUNTING HEIGHT
The height of the photometric center of a luminaire above grade level. The horizontal spacing of poles is often measured in units of "mounting height." Example: "The luminaires can be spaced up to four mounting heights apart."
NEW LIGHTING
Lighting for areas not previously illuminated; newly installed lighting of any type except for replacement lighting or lighting repairs.
OBJECT
A permanent structure located on a site. "Objects" may include statues or artwork, garages or canopies, outbuildings, etc.
OBJECT HEIGHT
Shall mean the highest point of an entity, but shall not include antennas or similar structures.
ORNAMENTAL LIGHTING
Lighting that does not impact the function and safety of an area but is purely decorative, or used to illuminate architecture and/or landscaping, and installed for aesthetic effect.
ORNAMENTAL STREET
Lighting shall mean a luminaire intended for illuminating streets that serves a decorative function in addition to providing optics that effectively deliver street lighting. It has a historical period appearance or decorative appearance, and has the following design characteristics:
1. 
Designed to mount on a pole using an arm, pendant, or vertical tenon;
2. 
Opaque or translucent top and/or sides;
3. 
An optical aperture that is either open or enclosed with a flat, sag or drop lens;
4. 
Mounted in a fixed position; and
5. 
With its photometric output measured using Type C photometry per IESNA LM-75-01.
OUTDOOR LIGHTING
Lighting equipment installed within the property line and outside the building envelopes, whether attached to poles, building structures, the earth, or any other location; and any associated lighting control equipment.
PARTLY SHIELDED LUMINAIRE
A luminaire with opaque top and translucent or perforated sides, designed to emit most light downward.
PEDESTRIAN HARDSCAPE
Stone, brick, concrete, asphalt or other similar finished surfaces intended primarily for walking, such as sidewalks and pathways.
PHOTOELECTRIC SWITCH
A control device employing a photocell or photodiode to detect daylight and automatically switch lights off when sufficient daylight is available.
PROPERTY LINE
The edges of the legally-defined extent of privately owned property.
RELATIVE PHOTOMETRY
Photometric measurements made of the lamp plus luminaire, and adjusted to allow for light loss due to reflection or absorption within the luminaire. Reference standard: IES LM-63.
REPAIR(S)
The reconstruction or renewal of any part of an existing luminaire for the purpose of its ongoing operation, other than relamping or replacement of components including capacitor, ballast or photocell. Note that retrofitting a luminaire with new lamp and/or ballast technology is not considered a repair and for the purposes of this section the luminaire shall be treated as if new. "Repair" does not include normal relamping or replacement of components including capacitor, ballast or photocell.
REPLACEMENT LIGHTING
Lighting installed specifically to replace existing lighting that is sufficiently broken to be beyond repair.
SALES AREA
An uncovered area used for sales of retail goods and materials, including but not limited to automobiles, boats, tractors and other farm equipment, building supplies, and gardening and nursery products.
SHIELDED DIRECTIONAL LUMINAIRE
A luminaire that includes an adjustable mounting device allowing aiming in any direction and contains a shield, louver, or baffle to reduce direct view of the lamp.
SIGN
Advertising, directional or other outdoor promotional display of art, words and/or pictures.
SKY GLOW
The brightening of the nighttime sky that results from scattering and reflection of artificial light by moisture and dust particles in the atmosphere. Skyglow is caused by light directed or reflected upwards or sideways and reduces one's ability to view the night sky.
TEMPORARY LIGHTING
Lighting installed and operated for periods not to exceed 60 days, completely removed and not operated again for at least 30 days.
TEMPORARY SEASONAL LIGHTING
Lighting installed and operated in connection with holidays or traditions.
THIRD PARTY
A party contracted to provide lighting, such as a utility company.
TIME SWITCH
An automatic lighting control device that switches lights according to time of day.
TRANSLUCENT
Allowing light to pass through, diffusing it so that objects beyond cannot be seen clearly (not transparent or clear).
UNSHIELDED LUMINAIRE
A luminaire capable of emitting light in any direction including downwards.
UPLIGHT
Shall mean, for an exterior luminaire, flux radiated in the hemisphere at or above the horizontal plane.
VERTICAL ILLUMINANCE
Illuminance measured or calculated in a plane perpendicular to the site boundary or property line.
a. 
Color Temperature: All exterior lighting shall utilize light sources not to exceed 3,000 kelvin.
b. 
Light Trespass and Overlighting: All existing and/or new exterior lighting shall not cause light trespass and shall protect adjacent properties from glare and excessive lighting. All vehicle lighting originating from a commercial property shall be shielded from other adjacent properties. Incidental light trespass (lighting emanating from turning motor vehicles or motion sensor lighting) is permitted.
c. 
All lighting emitting from any zoning lot shall not cause the light level along any property line, as measured at a height of 60 inches above grade in a plane at any angle of inclination, to exceed the limitations listed in Figure 1: Light Trespass Matrix.
Figure 1: Light Trespass and Overlighting Matrix
Zone of Light Source
Impacted Zone
Maximum Footcandle Limits
Noncommercial Zones
(C, C/R, R-1, R-2, R-3, R-4, R-5, R-6, AH-1/R-7, AH-2/R-8, AH-3/R-9)
Noncommercial Zones
(C, C/R, R-1, R-2, R-3, R-4, R-5, R-6, AH-1/R-7, AH-2/R-8, AH-3/R-9)
0.1 footcandle
Noncommercial Zones
(C, C/R, R-1, R-2, R-3, R-4, R-5, R-6, AH-1/R-7, AH-2/R-8, AH-3/R-9)
Commercial Zones
(B-1, B-2, OB-1, OB-2, OB-3)
0.5 footcandle
Commercial Zones
(B-1, B-2, OB-1, OB-2, OB-3)
Noncommercial Zones
(C, C/R, R-1, R-2, R-3, R-4, R-5, R-6, AH-1/R-7, AH-2/R-8, AH-3/R-9)
0.1 footcandle
Commercial Zones
(B-1, B-2, OB-1, OB-2, OB-3)
Commercial Zones
(B-1, B-2, OB-1, OB-2, OB-3)
0.5 footcandle
d. 
Nonessential Exterior Commercial and Residential Lighting: All nonessential exterior commercial and residential lighting shall be turned off after business hours and/or when not in use. Lights on a timer shall be used. Sensor-activated lights shall be used to replace existing lighting that is desired for security purposes.
e. 
Area Lights:
1. 
All area lights, including streetlights and parking area lighting, shall be level mounted and 85° full cutoff-type fixtures.
2. 
Residential streetlights shall be limited to 1,125 lumens, unless otherwise recommended by the Public Works Department.
3. 
Nonresidential streetlights shall be limited to 1,500 lumens, unless otherwise recommended by the Public Works Department.
4. 
Lights on major intersections on state highways shall be limited to 3,000 lumens, unless otherwise recommended by the Public Works Department.
5. 
Parking area lights are encouraged to be greater in number, lower in height and lower in light level, as opposed to fewer in number, higher in height and higher in light level.
6. 
Parking lot lighting shall not exceed IESNA recommended illuminance (footcandle) level and are encouraged to utilize the lowest range available.
7. 
All freestanding area lights within a residential zone, except streetlights, shall be mounted at a height no greater than the value "3 + (D/3)," where "D" is the distance in feet to the nearest property boundary.
8. 
Luminaire Mounting Height: Freestanding luminaires shall be no higher than 25 feet above the stand/pole base; except that luminaires used for recreational playing fields shall be exempt from the height restriction, provided all other provisions of this section are met and the light is used only while the field is in use; and except that streetlights used on major roads may exceed this standard if necessary as determined by the Borough Council, as advised by a lighting engineer. Building-mounted luminaires shall be attached only to walls, and the top of the fixture shall not exceed the height of the parapet or roof, whichever is greater.
9. 
Area lights on a timer, sensor activated, or turned off at 10:30 p.m. are exempt from Subsection 30-510.2b of this section, provided all other standards of this section are met.
f. 
Uplighting: Uplighting is prohibited in all zoning districts, except where otherwise permitted in this section.
g. 
Public Outdoor Lighting: Public outdoor lighting, including holiday lighting, shall be permitted to ensure the safety and enjoyment of the intended public use. All public lighting shall comply with the standards established herein and shall be turned off after hours of operation or when not in use. When practically possible, motion sensors may be used. Public outdoor lighting is exempt from lighting curfews and exempt from section 17.132.030B[1] of this section.
[1]
Editor's Note: So in original.
h. 
Lighting Fixtures:
1. 
All exterior lighting shall comply with the acceptable lighting fixtures located in Figure 2. All exterior lighting fixtures shall be full cutoff fixtures with the light source fully shielded, except as exempted in this section.
2. 
Figure 2 is incorporated into this section as a guideline for the public and the Borough for use in meeting the intent of this section. Figure 2 serves only as an example. The Borough does not endorse or discriminate against any manufacturer or company that may be shown, portrayed or mentioned by the examples.
Figure 2: Lighting Fixture Guidelines
i. 
Lighting Fixture Exceptions and Additional Requirements: See Figure 3a.
Figure 3a: Light Fixture Exceptions and Additional Requirements
Type of Lighting (Full Cutoff)
Light Fixture
Light Trespass Standards
Additional Requirements
Canopy lighting
Required
Not exempt
- All canopy lighting shall be recessed.
- sufficiently so as to ensure that no light source is visible from or causes glare on public rights of way or adjacent property.
Holiday lights
Not required
Exempt
- Shall only be displayed from November 20 to March 20.
- Exempt from color temperature requirements set forth in this section.
- All new holiday lighting shall be LED lighting, or bulb that has been demonstrated to be the most energy efficient technology available.
- Flashing holiday lighting is permitted.
- All private holiday lighting shall be turned off at the close of business hours in the Community Core zoning district, and after 10:30 p.m. in all other zoning districts. Outdoor public lighting shall not be subject to holiday lighting curfew.
Flagpole lighting
Not required
Exempt
- Upward flagpole lighting is permitted for governmental flags only.
- The maximum lumen output shall be 1,300 lumens.
- Flags are encouraged to be taken down at sunset to avoid the need for lighting.
Floodlights
Not required
Not exempt
- Floodlights with external shielding shall be angled provided that no light escapes above a twenty-five-degree angle measured from the vertical line from the center of the light extended to the ground.
- Floodlights shall not cause glare or light to shine directly on adjacent property or public rights of way.
- Shall be encouraged to be motion sensor activated.
Neon lights
Not required
Not exempt
- Neon lights are only permitted pursuant to the Sign Ordinance.
Sensor-activated lighting
Required
Exempt
- Shall be located so as to prevent lighting into adjacent properties or into a public right of way.
- Lighting shall activate only when motion on the property is detected and shall deactivate within no more than five minutes.
- Lighting shall not be triggered by any activity off the property or in the public right of way.
- The maximum lumen output shall be 600 lumens.
Temporary lighting
Required
Exempt
- Lumens output shall be approved by the Department of Public Works.
Temporary emergency lighting
Not required
Exempt
- Utilized by public safety services. Exempt from provisions of this section.
Motor vehicle fueling stations and motor vehicle service stations
Required
Not exempt
- The average footcandle lighting level at the pump for new and existing service stations is required to be no greater than 30 footcandle average, as set by the IESNA for urban service stations.
Towers for radio communication and navigation
Not required
Not exempt
- All radio, communication and navigation towers that require lights shall have dual lighting capabilities.
- For daytime, the white strobe light may be used; and for nighttime, only red lights shall be used.
- Lighting that is required by legal jurisdictions are exempt from this provision.
a. 
Any light source that does not meet the requirements of this section is prohibited.
b. 
Searchlights, beacons, laser source, and other high-intensity light fixtures are prohibited.
c. 
Except as otherwise allowed by this title, any lighting that is flashing, blinking, rotating, chasing, or rapidly changing in color or intensity is prohibited.
d. 
Neon lights shall be prohibited, except as may be permitted pursuant to § 30-403.17, Signs.
e. 
Window border lighting shall be prohibited.
a. 
The Lighting Zones shall determine the limitations for lighting as specified in this section. The Lighting Zones shall be shown in Figure 3b:
Figure 3b: Lighting Zones
Lighting Zone
Applicable Zoning Districts
Description
LZ-0: No ambient lighting
C Conservation Zone
Areas where the natural environment will be seriously and adversely affected by lighting. Impacts include disturbing the biological cycles of flora and fauna and/or detracting from human enjoyment and appreciation of the natural environment. Human activity is subordinate in importance to nature. The vision of human residents and users is adapted to the darkness, and they expect to see little or no lighting. When not needed, lighting should be extinguished.
LZ-1: Low ambient lighting
Single-Family Residential Zones
(R-1, R-2, R-3, R-4)
Areas where lighting might adversely affect flora and fauna or disturb the character of the area. The vision of human residents and users is adapted to low light levels. Lighting may be used for safety and convenience but it is not necessarily uniform or continuous. After curfew, most lighting should be extinguished or reduced as activity levels decline.
LZ-2: Moderate ambient lighting
Multi-Family Residential & Office Zones
(R-5, R-6, AH-1/R-7, AH-2/R-8, AH-3/R-9, OB-1, OB-2, OB-3)
Areas of human activity where the vision of human residents and users is adapted to moderate light levels. Lighting may typically be used for safety and convenience but it is not necessarily uniform or continuous. After curfew, lighting may be extinguished or reduced as activity levels decline.
LZ-3: Moderately high ambient lighting
Commercial Zones
(B-1, B-2)
Areas of human activity where the vision of human residents and users is adapted to moderately high light levels. Lighting is generally desired for safety, security and/or convenience and it is often uniform and/or continuous. After curfew, lighting may be extinguished or reduced in most areas as activity levels decline.
LZ-4: High ambient lighting
N/A
Areas of human activity where the vision of human residents and users is adapted to high light levels. Lighting is generally considered necessary for safety, security and/or convenience and it is mostly uniform and/or continuous. After curfew, lighting may be extinguished or reduced in some areas as activity levels decline.
b. 
The following outdoor lighting restrictions in Figure 4 shall apply to sites and structures based on their assigned lighting zone:
Figure 4: Lighting Zone-Based Restrictions
Lighting Zones
Color Temperature CCT Allowed Range
Light Reduction
R = Required/V = Voluntary
Maximum Light Output Percentage
LZ-0
1,900K - 3,000K
R-1 hour after close of business
25%
LZ-1
1,900K - 3,000K
R-1 1/2 hours after close of business
25%
LZ-2
1,900K - 3,500K1
R-2 hours after close of business
50%
LZ-3
1,900K - 4,800K2
V-2 hours after close of business
50%
Notes:
1.
While LZ-2 and LZ-3 have higher allowable color temperature ranges, it is still strongly recommended to use warmer color temperatures (3,000 K or lower) whenever practicable. Cooler color temperatures (greater than 3,000 K) shall be reserved for instances where there are special requirements or regulations that necessitate higher values.
2.
Due to the large range of allowable color temperatures in LZ-3, care should be taken to prevent harsh transitions between cool and warm color temperatures in neighboring areas. As a general rule of thumb, the difference in CCT values should not be greater than 1,000 K when transitioning between areas of differing color temperatures.
a. 
Automatic Switching Requirements: Controls shall be provided that automatically extinguish all outdoor lighting when sufficient daylight is available using a control device or system such as a photoelectric switch, astronomic time switch or equivalent functions from a programmable lighting controller, building automation system or lighting energy management system, all with battery or similar backup power or device.
1. 
Exceptions: Automatic lighting controls are not required for the following:
(a) 
Lighting under canopies.
(b) 
Lighting for tunnels, parking garages, garage entrances, and similar conditions.
b. 
Automatic Lighting Reduction Requirements: The Borough shall establish curfew time(s), after which total outdoor lighting lumens shall be reduced by at least 30% or extinguished.
1. 
Exceptions: Lighting reductions are not required for any of the following:
(a) 
With the exception of landscape lighting, lighting for residential properties including multiple residential properties not having common areas.
(b) 
When the outdoor lighting consists of only one luminaire.
(c) 
Code-required lighting for steps, stairs, walkways, and building entrances.
(d) 
When, in the opinion of the Authority, lighting levels must be maintained.
(e) 
Motion-activated lighting.
(f) 
Lighting governed by special use permit in which times of operation are specifically identified.
(g) 
Businesses that operate on a twenty-four-hour basis.
For all nonresidential properties, and for multiple residential properties of seven domiciles or more and having common outdoor areas, all outdoor lighting shall comply either with Subsection a or b of this section.
a. 
Prescriptive method. An outdoor lighting installation complies with this section if it meets the requirements of Subsections a1 and 2, below.
1. 
Total site lumen limit: The total installed initial luminaire lumens of all outdoor lighting shall not exceed the total site lumen limit. The total site lumen limit shall be determined using either the parking space method (Figure 5) or the hardscape area method (Figure 6). Only one method shall be used per permit application, and for sites with existing lighting, existing lighting shall be included in the calculation of total installed lumens. The total installed initial luminaire lumens are calculated as the sum of the initial luminaire lumens for all luminaires.
Figure 5 - Allowed Total Initial Luminaire Lumens per Site for Nonresidential Outdoor Lighting, Per Parking Space Method
May only be applied to properties up to 10 parking spaces (including handicapped accessible spaces).
LZ-0
LZ-1
LZ-2
LZ-3
LZ-4
350 lumens/space
490 lumens/space
630 lumens/space
840 lumens/space
1,050 lumens/space
Figure 6 - Allowed Total Initial Lumens per Site for Nonresidential Outdoor Lighting, Hardscape Area Method
May be used for any project. When lighting intersections of site drives and public streets or road, a total of 600 square feet for each intersection may be added to the actual site hardscape area to provide for intersection lighting.
LZ-0
LZ-1
LZ-2
LZ-3
LZ-4
Base Allowance
0.5 lumens per square foot of hardscape
1.25 lumens per square foot of hardscape
2.5 lumens per square foot of hardscape
5.0 lumens per square foot of hardscape
7.5 lumens per square foot of hardscape
Lumen Allowances, in Addition to Base Allowance
LZ-0
LZ-1
LZ-2
LZ-3
LZ-4
Additional allowances for sales and service facilities. No more than two additional allowances per site, "Use it or Lose it".
Outdoor sales lots. This allowance is lumens per square foot of uncovered sales lots used exclusively for the display of vehicles or other merchandise for sale, and may not include driveways, parking or other non-sales areas. To use this allowance, luminaires must be within 2 mounting heights of sales lot area.
0
4 lumens per square foot
8 lumens per square foot
16 lumens per square foot
16 lumens per square foot
Outdoor sales frontage. This allowance is for lineal feet of sales frontage immediately adjacent to the principal viewing location(s) and unobstructed for its viewing length. A corner sales lot may include two adjacent sides provided that a different principal viewing location exists for each side. In order to use this allowance, luminaires must be located between the principal viewing location and the frontage outdoor sales area
0
0
1,000 per linear foot
1,500 per linear foot
2,000 per linear foot
Drive-up windows. In order to use this allowance, luminaires must be within 20 feet horizontal distance of the center of the window.
0
2,000 lumens per drive-up window
4,000 lumens per drive-up window
8,000 lumens per drive-up window
8,000 lumens per drive-up window
Vehicles service station. This allowance is lumens per installed fuel pump.
0
4,000 lumens per pump (based on 5 fc horiz)
8,000 lumens per pump (based on 5 fc horiz)
16,000 lumens per pump (based on 5 fc horiz)
24,000 lumens per pump (based on 5 fc horiz)
b. 
Performance method.
1. 
Total site lumen limit: The total installed initial luminaire lumens of all lighting systems on the site shall not exceed the allowed total initial site lumens. The allowed total initial site lumens shall be determined using Figures 8 and 9. For sites with existing lighting, existing lighting shall be included in the calculation of total installed lumens. The total installed initial luminaire lumens of all is calculated as the sum of the initial luminaire lumens for all luminaires.
2. 
All luminaires shall be rated and installed using either Option A or Option B. Only one option may be used per permit application.
(a) 
Option A: All luminaires shall be rated and installed according to Figure 7.
(b) 
Option B: The entire outdoor lighting design shall be analyzed using industry standard lighting software including interreflections in the following manner:
(1) 
Input data shall describe the lighting system including luminaire locations, mounting heights, aiming directions, and employing photometric data tested in accordance with IES guidelines. Buildings or other physical objects on the site within three object heights of the property line must be included in the calculations.
(2) 
Analysis shall utilize an enclosure comprised of calculation planes with zero reflectance values around the perimeter of the site. The top of the enclosure shall be no less than 33 feet (10 meters) above the tallest luminaire. Calculations shall include total lumens upon the inside surfaces of the box top and vertical sides and maximum vertical illuminance (footcandles and/or lux) on the sides of the enclosure. The design complies if:
[a] 
The total lumens on the inside surfaces of the virtual enclosure are less than 15% of the total site lumen limit; and
[b] 
The maximum vertical illuminance on any vertical surface is less than the allowed maximum illuminance per Figure 10.
Figure 7a - Maximum Allowable Backlight, Uplight and Glare (BUG) Ratings
May be used for any project. A luminaire may be used if it is rated for the lighting zone of the site or lower in number for all ratings B, U and G. Luminaires equipped with adjustable mounting devices permitting alteration of luminaire aiming in the field shall not be permitted.
LZ-0
LZ-1
LZ-2
LZ-3
LZ-4
Allowed Backlight Rating
Greater than 2 mounting heights from property line
B1
B3
B4
B5
B5
1 to less than 2 mounting heights from property line and ideally oriented**
B1
B2
B3
B4
B4
0.5 to 1 mounting heights from property line and ideally oriented**
B0
B1
B2
B3
B3
Less than 0.5 mounting height to property line and properly oriented**
B0
B0
B0
B1
B2
*
For property lines that abut public walkways, bikeways, plazas, and parking lots, the property line may be considered to be five feet beyond the actual property line for purpose of determining compliance with this section. For property lines that abut public roadways and public transit corridors, the property line may be considered to be the centerline of the public roadway or public transit corridor for the purpose of determining compliance with this section. NOTE: This adjustment is relative to Figure 7a and 7c only and shall not be used to increase the lighting area of the site.
**
To be considered "ideally oriented," the luminaire must be mounted with the backlight portion of the light output oriented perpendicular and towards the property line of concern.
Figure 7b Maximum Allowable Uplight (BUG) Ratings - Continued
LZ-0
LZ-1
LZ-2
LZ-3
LZ-4
Allowed uplight rating
U0
U1
U2
U3
U4
Allowed % light emission above 90° for street or area lighting
0%
0%
0%
0%
0%
Figure 7c Maximum Allowable Glare (BUG) Ratings - Continued
LZ-0
LZ-1
LZ-2
LZ-3
LZ-4
Allowed Glare Rating
G0
G1
G2
G3
G4
Any luminaire not ideally oriented*** with 1 to less than 2 mounting heights to any property line of concern
G0
G0
G1
G1
G2
Any luminaire not ideally oriented*** with 0.5 to 1 mounting height to any property line of concern
G0
G0
G0
G1
G1
Any luminaire not ideally oriented*** with less than 0.5 mounting height to any property line of concern
G0
G0
G0
G0
G1
***
Any luminaire that cannot be mounted with its backlight perpendicular to any property line within two times the mounting heights of the luminaire location shall meet the reduced allowed glare rating in Figure 7c.
Figure 8 Performance Method Allowed Total Initial Site Lumens
May be used on any project.
LZ-0
LZ-1
LZ-2
LZ-3
LZ-4
Allowed lumens per square foot
0.5
1.25
2.5
5.0
7.5
Allowed base lumens per site
0
3,500
7,000
14,000
21,000
Figure 9 Performance Method Additional Initial Luminaire Lumen Allowances. All of the following are "use it or lose it" allowances.
All area and distance measurements in plan view unless otherwise noted.
LZ-0
LZ-1
LZ-2
LZ-3
LZ-4
Additional lumens allowances for all buildings except service stations and outdoor sales facilities. A maximum of three allowances are permitted. These allowances are "use it or lose it."
Building entrances or exits. This allowance is per door. In order to use this allowance, luminaires must be within 20 feet of the door.
400
1,000
2,000
4,000
6,000
Building facades. This allowance is lumens per unit area of building facade that are illuminated. To use this allowance, luminaires must be aimed at the facade and capable of illuminating it without obstruction.
0
0
8 lumens per square foot
16 lumens per square foot
24 lumens per square foot
Sales or non-sales canopies. This allowance is lumens per unit area for the total area within the drip line of the canopy. In order to qualify for this allowance, luminaires must be located under the canopy.
0
3 lumens per square foot
6 lumens per square foot
12 lumens per square foot
18 lumens per square foot
Sales or non-sales canopies. This allowance is lumens per unit area for the total area within the drip line of the canopy. In order to qualify for this allowance, luminaires must be located under the canopy.
0
6 lumens per square foot
12 lumens per square foot
24 lumens per square foot
36 lumens per square foot
Outdoor dining. This allowance is lumens per unit area for the total illuminated hardscape of outdoor dining. In order to use this allowance, luminaires must be within 2 mounting heights of the hardscape area of outdoor dining
0
1 lumen per square foot
5 lumens per square foot
10 lumens per square foot
15 lumens per square foot
Drive-up windows. This allowance is lumens per window. In order to use this allowance, luminaires must be within 20 feet of the center of the window.
0
2,000 lumens per drive-up window
4,000 lumens per drive-up window
8,000 lumens per drive-up window
8,000 lumens per drive-up window
Additional lumens allowances for service stations only. Service stations may not use any other additional allowances.
Vehicle service station hardscape. This allowance is lumens per unit area for the total illuminated hardscape area less area of buildings, area under canopies, area off property, or areas obstructed by signs or structures. In order to use this allowance, luminaires must be illuminating the hardscape area and must not be within a building, below a canopy, beyond property lines, or obstructed by a sign or other structure.
0
4 lumens per square foot
8 lumens per square foot
16 lumens per square foot
24 lumens per square foot
Vehicle service station canopies. This allowance is lumens per unit area for the total area within the drip line of the canopy. In order to use this allowance, luminaires must be located under the canopy.
0
8 lumens per square foot
16 lumens per square foot
32 lumens per square foot
32 lumens per square foot
Additional lumens allowances for outdoor sales facilities only. Outdoor sales facilities may not use any other additional allowances. NOTICE: lighting permitted by these allowances shall employ controls extinguishing this lighting after a curfew time to be determined by the Authority.
Outdoor sales lots. This allowance is lumens per square foot of uncovered sales lots used exclusively for the display of vehicles or other merchandise for sale, and may not include driveways, parking or other non-sales areas and shall not exceed 25% of the total hardscape area. To use this allowance, luminaires must be within 2 mounting heights of the sales lot area.
0
4 lumens per square foot
8 lumens per square foot
12 lumens per square foot
18 lumens per square foot
Outdoor sales frontage. This allowance is for lineal feet of sales frontage immediately adjacent to the principal viewing location(s) and unobstructed for its viewing length. A corner sales lot may include two adjacent sides provided that a different principal viewing location exists for each side. In order to use this allowance, luminaires must be located between the principal viewing location and the frontage outdoor sales area.
0.0
0
1,000 lumens per linear foot
1,500 lumens per linear foot
2,000 lumens per linear foot
Figure 10 Maximum Vertical Illuminance at any point in the plane of the property line
LZ-0
LZ-1
LZ-2
LZ-3
LZ-4
0.05 footcandle or 0.5 Lux
0.1 footcandle or 1.0 Lux
0.3 footcandle or 3.0 Lux
0.8 footcandle or 8.0 Lux
1.5 footcandles or 15.0 Lux
a. 
General Requirements: For residential properties, including multiple residential properties not having common areas, all outdoor luminaires shall be fully shielded and shall not exceed the allowed lumen output in Figure 11, Row 2.
1. 
Exceptions.
(a) 
One partly shielded or unshielded luminaire at the main entry, not exceeding the allowed lumen output in Figure 11, Row 1.
(b) 
Any other partly shielded or unshielded luminaires not exceeding the allowed lumen output in Figure 11, Row 3.
(c) 
Low-voltage landscape lighting aimed away from adjacent properties and not exceeding the allowed lumen output in Figure 11, Row 4.
(d) 
Shielded directional flood lighting aimed so that direct glare is not visible from adjacent properties and not exceeding the allowed lumen output in Figure 11, Row 5.
(e) 
Open flame gas lamps.
(f) 
Lighting installed with a vacancy sensor, where the sensor extinguishes the lights no more than 15 minutes after the area is vacated.
(g) 
Lighting exempt per § 30-510.1.
2. 
Requirements for residential landscape lighting.
(a) 
Shall comply with Figure 11.
(b) 
Shall not be aimed onto adjacent properties.
Figure 11 - Residential Lighting Limits
LZ-0
LZ-1
LZ-2
LZ-3
LZ-4
Row 1 Maximum allowed luminaire lumens* for unshielded luminaries at one entry only
Not allowed
420 lumens
630 lumens
630 lumens
630 lumens
Row 2 Maximum allowed luminaire lumens* for each fully shielded luminaire
630 lumens
1,260 lumens
1,260 lumens
1,260 lumens
1,260 lumens
Row 3 Maximum allowed luminaire lumens* for each unshielded luminaire excluding main entry
Not allowed
315 lumens
315 lumens
315 lumens
315 lumens
Row 4 Maximum allowed luminaire lumens* for each landscape lighting
Not allowed
Not allowed
1,050 lumens
2,100 lumens
2,100 lumens
Row 5 Maximum allowed luminaire lumens* for each shielded directional flood lighting
Not allowed
Not allowed
1,260 lumens
2,100 lumens
2,100 lumens
Row 6 Maximum allowed luminaire lumens* for each low-voltage landscape lighting
Not allowed
Not allowed
525 lumens
525 lumens
525 lumens
*
Luminaire lumens equals initial lamp lumens for a lamp, multiplied by the number of lamps in the luminaire.
[New]
All residential developments must comply with the most recent addition of the New Jersey Residential Site Improvement Standards (RSIS) and all its amendments. Where the RSIS do not address a specific design standard then the relevant standard established in this section shall apply.
Storm sewers, open channels, bridges and culverts shall be designed for minimum flow capacities as follows:
Design Capacity
Drainage system*
25 years
Drainage structures**
100 years
Open channels
As determined by the Borough Engineer
*Editor's Note: The term drainage system refers to the composite of all drainage infrastructure improvements.
**Editor's Note: The term drainage structures refers to particular drainage infrastructure improvements such as bridges, culverts, detention and retention facilities.
a. 
As required, approval for drainage systems of facilities shall be obtained from the appropriate municipal, County, State and Federal agencies and offices or such approval shall be a condition of preliminary approval. When required, each applicant shall make application to the State Division of Water Policy and Supply of the Department of Environmental Protection, to the County Engineering Department and to the Borough Engineer. Letters of approval from the appropriate governmental authorities shall be furnished to the Board Secretary, with copies to the Borough Engineer.
b. 
Where a lot or a tract is traversed by a watercourse, surface or underground drainage system, channel or stream carrying water from an adjacent tract of land, there shall be provided and dedicated a drainage right-of-way easement to the Borough conforming substantially with the lines of such watercourse, and such further width or construction or both as will be adequate to accommodate expected stormwater runoff in the future, based upon reasonable growth potential in the Borough and in any event, meeting the minimum widths and locations shown on an adopted Official Map or element of the Master Plan for the Borough, or where not so shown having a minimum width of twenty (20) feet.
c. 
The system shall be adequate to carry off or store the stormwater and natural drainage which originates not only within the lot or tract boundaries, but also that which originates beyond the lot or tract boundaries and traverses the site. No stormwater runoff or natural drainage shall be diverted so as to overload existing drainage systems or create flooding or the need for additional drainage structures on other private properties or public lands without adequate provision for off-tract improvements to accommodate the condition(s). Final disposition of stormwater shall be to an existing natural watercourse.
d. 
Street and off-site drainage facilities must be provided with sufficient catch basins, storm sewers, culverts, swales, and/or other drainage appurtenances for the proper drainage of the area in light of existing conditions and the proposed construction of buildings and paved areas.
e. 
Lots shall be graded to secure proper drainage away from buildings and into drainage facilities. Additionally, drainage shall be provided in a manner which will prevent the collection of stormwater in pools or other unauthorized concentrations of flow. To the extent possible, grading shall not divert water to flow across property lines.
a. 
All sump pumps, roof leaders and foundation drains shall be connected to the stormwater system, if available. No connections shall be permitted into any sanitary sewer.
[Amended 7-16-2019 by Ord. No. 13-2019]
b. 
To prevent water from entering basements or cellars in areas where a high water table exists or is anticipated, as determined from secondary sources, the Board shall require the applicant to provide adequate subsurface drainage facilities before any basements or cellars are approved for construction.
Storm sewers and culverts shall be constructed of reinforced concrete pipe, corrugated metal pipe, or aluminum culvert pipe as hereinafter specified.
a. 
Reinforced concrete pipe shall conform to the requirements of "Standard Specifications for Reinforced Concrete Pipes, A.S.T.M. designation C-76" of the year of last revision.
b. 
Corrugated metal pipe shall conform to the requirements of current A.A.S.H.O. specifications, designation M-36, for corrugated metal culvert pipe, and, in addition shall be provided with an exterior bituminous lining applied by a centrifugal method, extending not less than one-eighth (1/8) inch beyond the rest of the corrugations forming the entire inner circumference of the pipe. After application of the lining, the internal diameter of twelve (12) to twenty-four (24) inch pipe shall not vary more than one and one-half (1.5%) percent from the nominal diameter. The internal diameter of larger pipe after application of the lining shall not vary more than one (1%) percent or three-eights (3/8) inch whichever is greater, from the nominal diameter. Material for lining shall conform to the requirements of Article 8.1.3 of the New Jersey State Highway Department Standard Specifications for Road and Bridge Construction for 1961 as amended.
c. 
Where adequate to accommodate stormwater runoff, six (6) inch PVC may be used to connect yard drains, leaders, etc. However, adequate cleanouts shall be provided to allow for maintenance of the system.
Editor's Note: Ord. No. 19-2021 amended § 30-512 in entirety. Prior history includes Ord. No. 10-2006 and ORd. No. 26-2006.
[Added 7-27-2021 by Ord. No. 19-2021]
a. 
Policy Statement. Flood control, groundwater recharge, and pollutant reduction shall be achieved through the use of stormwater management measures, including green infrastructure Best Management Practices (GI BMPs) and nonstructural stormwater management strategies. GI BMPs and low impact development (LID) should be utilized to meet the goal of maintaining natural hydrology to reduce stormwater runoff volume, reduce erosion, encourage infiltration and groundwater recharge, and reduce pollution. GI BMPs and LID should be developed based upon physical site conditions and the origin, nature and the anticipated quantity, or amount, of potential pollutants. Multiple stormwater management BMPs may be necessary to achieve the established performance standards for water quality, quantity, and groundwater recharge.
b. 
Purpose. The purpose of this section is to establish minimum stormwater management requirements and controls for "major development," as defined below in § 30-512.2.
c. 
Applicability.
1. 
This section shall be applicable to the following major developments:
(a) 
Non-residential major developments; and
(b) 
Aspects of residential major developments that are not pre-empted by the Residential Site Improvement Standards at N.J.A.C. 5:21.
2. 
This section shall also be applicable to all major developments undertaken by the Borough of Roseland.
d. 
Compatibility with Other Permit and Ordinance Requirements. Development approvals issued pursuant to this section are to be considered an integral part of development approvals and do not relieve the applicant of the responsibility to secure required permits or approvals for activities regulated by any other applicable code, rule, act, or ordinance. In their interpretation and application, the provisions of this section shall be held to be the minimum requirements for the promotion of the public health, safety, and general welfare.
This section is not intended to interfere with, abrogate, or annul any other ordinances, rule or regulation, statute, or other provision of law except that, where any provision of this section imposes restrictions different from those imposed by any other ordinance, rule or regulation, or other provision of law, the more restrictive provisions or higher standards shall control.
[Added 7-27-2021 by Ord. No. 19-2021]
For the purpose of this section, the following terms, phrases, words and their derivations shall have the meanings stated herein unless their use in the text of this section clearly demonstrates a different meaning. When not inconsistent with the context, words used in the present tense include the future, words used in the plural number include the singular number, and words used in the singular number include the plural number. The word "shall" is always mandatory and not merely directory. The definitions below are the same as or based on the corresponding definitions in the Stormwater Management Rules at N.J.A.C. 7:8-1.2.
CAFRA CENTERS, CORES OR NODES
Means those areas with boundaries incorporated by reference or revised by the Department in accordance with N.J.A.C. 7:7-13.16.
CAFRA PLANNING MAP
Means the map used by the Department to identify the location of Coastal Planning Areas, CAFRA centers, CAFRA cores, and CAFRA nodes. The CAFRA Planning Map is available on the Department's Geographic Information System (GIS).
COMMUNITY BASIN
Means an infiltration system, sand filter designed to infiltrate, standard constructed wetland, or wet pond, established in accordance with N.J.A.C. 7:8-4.2(c)14, that is designed and constructed in accordance with the New Jersey Stormwater Best Management Practices Manual, or an alternate design, approved in accordance with N.J.A.C. 7:8-5.2(g), for an infiltration system, sand filter designed to infiltrate, standard constructed wetland, or wet pond and that complies with the requirements of this section.
COMPACTION
Means the increase in soil bulk density.
CONTRIBUTORY DRAINAGE AREA
Means the area from which stormwater runoff drains to a stormwater management measure, not including the area of the stormwater management measure itself.
CORE
Means a pedestrian-oriented area of commercial and civic uses serving the surrounding municipality, generally including housing and access to public transportation.
COUNTY REVIEW AGENCY
Means an agency designated by the Board of County Commissioners of Essex County to review municipal stormwater management plans and implementing ordinance(s). The county review agency may either be:
a. 
A county planning agency; or
b. 
A county water resource association created under N.J.S.A. 58:16A-55.5, if the ordinance or resolution delegates authority to approve, conditionally approve, or disapprove municipal stormwater management plans and implementing ordinances.
DEPARTMENT
Means the Department of Environmental Protection.
DESIGN ENGINEER
Means a person professionally qualified and duly licensed in New Jersey to perform engineering services that may include, but not necessarily be limited to, development of project requirements, creation and development of project design and preparation of drawings and specifications.
DESIGNATED CENTER
Means a State Development and Redevelopment Plan Center as designated by the State Planning Commission such as urban, regional, town, village, or hamlet.
DEVELOPMENT
Means the division of a parcel of land into two or more parcels, the construction, reconstruction, conversion, structural alteration, relocation or enlargement of any building or structure, any mining excavation or landfill, and any use or change in the use of any building or other structure, or land or extension of use of land, for which permission is required under the Municipal Land Use Law, N.J.S.A. 40:55D-1 et seq.
In the case of development of agricultural land, development means: any activity that requires a State permit, any activity reviewed by the County Agricultural Board (CAB) and the State Agricultural Development Committee (SADC), and municipal review of any activity not exempted by the Right to Farm Act, N.J.S.A. 4:1C-1 et seq.
DISTURBANCE
Means the placement or reconstruction of impervious surface or motor vehicle surface, or exposure and/or movement of soil or bedrock or clearing, cutting, or removing of vegetation. Milling and repaving is not considered disturbance for the purposes of this definition.
DRAINAGE AREA
Means a geographic area within which stormwater, sediments, or dissolved materials drain to a particular receiving waterbody or to a particular point along a receiving waterbody.
EMPOWERMENT NEIGHBORHOODS
Means neighborhoods designated by the Urban Coordinating Council "in consultation and conjunction with" the New Jersey Redevelopment Authority pursuant to N.J.S.A. 55:19-69.
ENVIRONMENTALLY CONSTRAINED AREA
Means the following areas where the physical alteration of the land is in some way restricted, either through regulation, easement, deed restriction or ownership such as: wetlands, floodplains, threatened and endangered species sites or designated habitats, and parks and preserves. Habitats of endangered or threatened species are identified using the Department's Landscape Project as approved by the Department's Endangered and Nongame Species Program.
ENVIRONMENTALLY CRITICAL AREA
Means an area or feature which is of significant environmental value, including but not limited to: stream corridors, natural heritage priority sites, habitats of endangered or threatened species, large areas of contiguous open space or upland forest, steep slopes, and well head protection and groundwater recharge areas. Habitats of endangered or threatened species are identified using the Department's Landscape Project as approved by the Department's Endangered and Nongame Species Program.
EROSION
Means the detachment and movement of soil or rock fragments by water, wind, ice, or gravity.
GREEN INFRASTRUCTURE
Means a stormwater management measure that manages stormwater close to its source by:
a. 
Treating stormwater runoff through infiltration into subsoil;
b. 
Treating stormwater runoff through filtration by vegetation or soil; or
c. 
Storing stormwater runoff for reuse.
HUC 14 or HYDROLOGIC UNIT CODE 14
Means an area within which water drains to a particular receiving surface water body, also known as a subwatershed, which is identified by a fourteen-digit hydrologic unit boundary designation, delineated within New Jersey by the United States Geological Survey.
IMPERVIOUS SURFACE
Means a surface that has been covered with a layer of material so that it is highly resistant to infiltration by water.
INFILTRATION
The process by which water seeps into the soil from precipitation.
LEAD PLANNING AGENCY
Means one or more public entities having stormwater management planning authority designated by the regional stormwater management planning committee pursuant to N.J.A.C. 7:8-3.2, that serves as the primary representative of the committee.
MAJOR DEVELOPMENT
Means an individual "development," as well as multiple developments that individually or collectively result in:
a. 
The disturbance of one or more acres of land since February 2, 2004;
b. 
The creation of one-quarter acre or more of "regulated impervious surface" since February 2, 2004;
c. 
The creation of one-quarter acre or more of "regulated motor vehicle surface" since March 2, 2021; or
d. 
A combination of paragraphs b and c above that totals an area of one-quarter acre or more. The same surface shall not be counted twice when determining if the combination area equals one-quarter acre or more.
Major development includes all developments that are part of a common plan of development or sale (for example, phased residential development) that collectively or individually meet any one or more of paragraphs a, b, c or d above. Projects undertaken by any government agency that otherwise meet the definition of "major development" but which do not require approval under the Municipal Land Use Law, N.J.S.A. 40:55D-1 et seq., are also considered "major development."
MOTOR VEHICLE
Means land vehicles propelled other than by muscular power, such as automobiles, motorcycles, autocycles, and low speed vehicles. For the purposes of this definition, motor vehicle does not include farm equipment, snowmobiles, all-terrain vehicles, motorized wheelchairs, go-carts, gas buggies, golf carts, ski-slope grooming machines, or vehicles that run only on rails or tracks.
MOTOR VEHICLE SURFACE
Means any pervious or impervious surface that is intended to be used by "motor vehicles" and/or aircraft, and is directly exposed to precipitation including, but not limited to, driveways, parking areas, parking garages, roads, racetracks, and runways.
MUNICIPALITY
Means any city, borough, town, township, or village.
NEW JERSEY STORMWATER BEST MANAGEMENT PRACTICES (BMP) MANUAL or BMP MANUAL
Means the manual maintained by the Department providing, in part, design specifications, removal rates, calculation methods, and soil testing procedures approved by the Department as being capable of contributing to the achievement of the stormwater management standards specified in this section. The BMP Manual is periodically amended by the Department as necessary to provide design specifications on additional best management practices and new information on already included practices reflecting the best available current information regarding the particular practice and the Department's determination as to the ability of that best management practice to contribute to compliance with the standards contained in this section. Alternative stormwater management measures, removal rates, or calculation methods may be utilized, subject to any limitations specified in this section, provided the design engineer demonstrates to the municipality, in accordance with § 30-512.4f and N.J.A.C. 7:8-5.2(g), that the proposed measure and its design will contribute to achievement of the design and performance standards established by this section.
NODE
Means an area designated by the State Planning Commission concentrating facilities and activities which are not organized in a compact form.
NUTRIENT
Means a chemical element or compound, such as nitrogen or phosphorus, which is essential to and promotes the development of organisms.
PERSON
Means any individual, corporation, company, partnership, firm, association, political subdivision of this State and any state, interstate or Federal agency.
POLLUTANT
Means any dredged spoil, solid waste, incinerator residue, filter backwash, sewage, garbage, refuse, oil, grease, sewage sludge, munitions, chemical wastes, biological materials, medical wastes, radioactive substance (except those regulated under the Atomic Energy Act of 1954, as amended (42 U.S.C. §§ 2011 et seq.)), thermal waste, wrecked or discarded equipment, rock, sand, cellar dirt, industrial, municipal, agricultural, and construction waste or runoff, or other residue discharged directly or indirectly to the land, ground waters or surface waters of the State, or to a domestic treatment works. Includes both hazardous and nonhazardous pollutants.
RECHARGE
Means the amount of water from precipitation that infiltrates into the ground and is not evapotranspired.
REGULATED IMPERVIOUS SURFACE
Means any of the following, alone or in combination:
a. 
A net increase of impervious surface;
b. 
The total area of impervious surface collected by a new stormwater conveyance system (for the purpose of this definition, a "new stormwater conveyance system" is a stormwater conveyance system that is constructed where one did not exist immediately prior to its construction or an existing system for which a new discharge location is created);
c. 
The total area of impervious surface proposed to be newly collected by an existing stormwater conveyance system; and/or
d. 
The total area of impervious surface collected by an existing stormwater conveyance system where the capacity of that conveyance system is increased.
REGULATED MOTOR VEHICLE SURFACE
Means any of the following, alone or in combination:
a. 
The total area of motor vehicle surface that is currently receiving water;
b. 
A net increase in motor vehicle surface; and/or quality treatment either by vegetation or soil, by an existing stormwater management measure, or by treatment at a wastewater treatment plant, where the water quality treatment will be modified or removed.
SEDIMENT
Means solid material, mineral or organic, that is in suspension, is being transported, or has been moved from its site of origin by air, water or gravity as a product of erosion.
SITE
Means the lot or lots upon which a major development is to occur or has occurred.
SOIL
Means all unconsolidated mineral and organic material of any origin.
STATE DEVELOPMENT AND REDEVELOPMENT PLAN METROPOLITAN PLANNING AREA (PA1)
Means an area delineated on the State Plan Policy Map and adopted by the State Planning Commission that is intended to be the focus for much of the State's future redevelopment and revitalization efforts.
STATE PLAN POLICY MAP
The geographic application of the State Development and Redevelopment Plan's goals and statewide policies, and the official map of these goals and policies.
STORMWATER
Means water resulting from precipitation (including rain and snow) that runs off the land's surface, is transmitted to the subsurface, or is captured by separate storm sewers or other sewage or drainage facilities, or conveyed by snow removal equipment.
STORMWATER MANAGEMENT BMP
Means an excavation or embankment and related areas designed to retain stormwater runoff. A stormwater management BMP may either be normally dry (that is, a detention basin or infiltration system), retain water in a permanent pool (a retention basin), or be planted mainly with wetland vegetation (most constructed stormwater wetlands).
STORMWATER MANAGEMENT MEASURE
Means any practice, technology, process, program, or other method intended to control or reduce stormwater runoff and associated pollutants, or to induce or control the infiltration or groundwater recharge of stormwater or to eliminate illicit or illegal non-stormwater discharges into stormwater conveyances.
STORMWATER MANAGEMENT PLANNING AGENCY
Means a public body authorized by legislation to prepare stormwater management plans.
STORMWATER MANAGEMENT PLANNING AREA
Means the geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.
STORMWATER RUNOFF
Means water flow on the surface of the ground or in storm sewers, resulting from precipitation.
TIDAL FLOOD HAZARD AREA
Means a flood hazard area in which the flood elevation resulting from the two-, ten-, or 100-year storm, as applicable, is governed by tidal flooding from the Atlantic Ocean. Flooding in a tidal flood hazard area may be contributed to, or influenced by, stormwater runoff from inland areas, but the depth of flooding generated by the tidal rise and fall of the Atlantic Ocean is greater than flooding from any fluvial sources. In some situations, depending upon the extent of the storm surge from a particular storm event, a flood hazard area may be tidal in the 100-year storm, but fluvial in more frequent storm events.
URBAN COORDINATING COUNCIL EMPOWERMENT NEIGHBORHOOD
Means a neighborhood given priority access to State resources through the New Jersey Redevelopment Authority.
URBAN ENTERPRISE ZONES
Means a zone designated by the New Jersey Enterprise Zone Authority pursuant to the New Jersey Urban Enterprise Zones Act, N.J.S.A. 52:27H-60 et. seq.
URBAN REDEVELOPMENT AREA
Previously developed portions of areas:
a. 
Delineated on the State Plan Policy Map (SPPM) as the Metropolitan Planning Area (PA1), Designated Centers, Cores or Nodes;
b. 
Designated as CAFRA Centers, Cores or Nodes;
c. 
Designated as Urban Enterprise Zones; and
d. 
Designated as Urban Coordinating Council Empowerment Neighborhoods.
WATER CONTROL STRUCTURE
Means a structure within, or adjacent to, a water, which intentionally or coincidentally alters the hydraulic capacity, the flood elevation resulting from the two-, ten-, or 100-year storm, flood hazard area limit, and/or floodway limit of the water. Examples of a water control structure may include a bridge, culvert, dam, embankment, ford (if above grade), retaining wall, and weir.
WATERS OF THE STATE
Means the ocean and its estuaries, all springs, streams, wetlands, and bodies of surface or groundwater, whether natural or artificial, within the boundaries of the State of New Jersey or subject to its jurisdiction.
WETLANDS or WETLAND
Means an area that is inundated or saturated by surface water or ground water at a frequency and duration sufficient to support, and that under normal circumstances does support, a prevalence of vegetation typically, adapted for life in saturated soil conditions, commonly known as hydrophytic vegetation.
[Added 7-27-2021 by Ord. No. 19-2021]
a. 
Stormwater management measures for major development shall be designed to provide erosion control, groundwater recharge, stormwater runoff quantity control, and stormwater runoff quality treatment as follows:
1. 
The minimum standards for erosion control are those established under the Soil and Sediment Control Act, N.J.S.A. 4:24-39 et seq., and implementing rules at N.J.A.C. 2:90.
2. 
The minimum standards for groundwater recharge, stormwater quality, and stormwater runoff quantity shall be met by incorporating green infrastructure.
b. 
The standards in this section apply only to new major development and are intended to minimize the impact of stormwater runoff on water quality and water quantity in receiving water bodies and maintain groundwater recharge. The standards do not apply to new major development to the extent that alternative design and performance standards are applicable under a regional stormwater management plan or Water Quality Management Plan adopted in accordance with Department rules.
[Added 7-27-2021 by Ord. No. 19-2021]
a. 
The development shall incorporate a maintenance plan for the stormwater management measures incorporated into the design of a major development in accordance with § 30-512.10.
b. 
Stormwater management measures shall avoid adverse impacts of concentrated flow on habitat for threatened and endangered species as documented in the Department's Landscape Project or Natural Heritage Database established under N.J.S.A. 13:1B-15.147 through 15.150, particularly Helonias bullata (swamp pink) and/or Clemmys muhlenbergii (bog turtle).
c. 
The following linear development projects are exempt from the groundwater recharge, stormwater runoff quality, and stormwater runoff quantity requirements of § 30-512.4p, q and r:
1. 
The construction of an underground utility line provided that the disturbed areas are revegetated upon completion;
2. 
The construction of an aboveground utility line provided that the existing conditions are maintained to the maximum extent practicable; and
3. 
The construction of a public pedestrian access, such as a sidewalk or trail with a maximum width of 14 feet, provided that the access is made of permeable material.
d. 
A waiver from strict compliance from the green infrastructure, groundwater recharge, stormwater runoff quality, and stormwater runoff quantity requirements of § 30-512.4o, p, q and r may be obtained for the enlargement of an existing public roadway or railroad; or the construction or enlargement of a public pedestrian access, provided that the following conditions are met:
1. 
The applicant demonstrates that there is a public need for the project that cannot be accomplished by any other means;
2. 
The applicant demonstrates through an alternatives analysis, that through the use of stormwater management measures, the option selected complies with the requirements of § 30-512.4o, p, q and r to the maximum extent practicable;
3. 
The applicant demonstrates that, in order to meet the requirements of § 30-512.4,o, p, q and r, existing structures currently in use, such as homes and buildings, would need to be condemned; and
4. 
The applicant demonstrates that it does not own or have other rights to areas, including the potential to obtain through condemnation lands not falling under § 30-512.4d3 above within the upstream drainage area of the receiving stream, that would provide additional opportunities to mitigate the requirements of § 30-512.4o, p, q and r that were not achievable onsite.
e. 
Tables 1 through 3 below summarize the ability of stormwater best management practices identified and described in the New Jersey Stormwater Best Management Practices Manual to satisfy the green infrastructure, groundwater recharge, stormwater runoff quality and stormwater runoff quantity standards specified in § 30-512.4o, p, q and r. When designed in accordance with the most current version of the New Jersey Stormwater Best Management Practices Manual, the stormwater management measures found at N.J.A.C. 7:8-5.2 (f) Tables 5-1, 5-2 and 5-3 and listed below in Tables 1, 2 and 3 are presumed to be capable of providing stormwater controls for the design and performance standards as outlined in the tables below. Upon amendments of the New Jersey Stormwater Best Management Practices to reflect additions or deletions of BMPs meeting these standards, or changes in the presumed performance of BMPs designed in accordance with the New Jersey Stormwater BMP Manual, the Department shall publish in the New Jersey Registers a notice of administrative change revising the applicable table. The most current version of the BMP Manual can be found on the Department's website at: https://njstormwater.org/bmp_manual2.htm.
f. 
Where the BMP tables in the NJ Stormwater Management Rule are different due to updates or amendments with the tables in this section the BMP Tables in the Stormwater Management rule at N.J.A.C. 7:8-5.2(f) shall take precedence.
Table 1
Green Infrastructure BMPs for Groundwater Recharge, Stormwater Runoff Quality, and/or Stormwater Runoff Quantity
Best Management Practice
Stormwater Runoff Quality TSS Removal Rate
(percent)
Stormwater Runoff Quantity
Groundwater Recharge
Minimum Separation from Seasonal High Water Table
(feet)
Cistern
0
Yes
No
—
Dry well(a)
0
No
Yes
2
Grass swale
50 or less
No
No
2(e)
1(f)
Green roof
0
Yes
No
—
Manufactured treatment device(a)(g)
50 or 80
No
No
Dependent upon the device
Pervious paving system(a)
80
Yes
Yes(b)
No(c)
2(b)
1(c)
Small-scale bioretention basin(a)
80 or 90
Yes
Yes(b)
No(c)
2(b)
1(c)
Small-scale infiltration basin(a)
80
Yes
Yes
2
Small-scale sand filter
80
Yes
Yes
2
Vegetative filter strip
60 to 80
No
No
—
(Notes corresponding to annotations (a) through (g) are found under Table 3.)
Table 2
Green Infrastructure BMPs for Stormwater Runoff Quantity
(or for Groundwater Recharge and/or Stormwater Runoff Quality with a Waiver or Variance from N.J.A.C. 7:8-5.3)
Best Management Practice
Stormwater Runoff Quality TSS Removal Rate
(percent)
Stormwater Runoff Quantity
Groundwater Recharge
Minimum Separation from Seasonal High Water Table
(feet)
Bioretention system
80 or 90
Yes
Yes(b)
No(c)
2(b)
1(c)
Infiltration basin
80
Yes
Yes
2
Sand filter(b)
80
Yes
Yes
2
Standard constructed wetland
90
Yes
No
N/A
Wet pond(d)
50 to 90
Yes
No
N/A
(Notes corresponding to annotations (b) through (d) are found under Table 3.)
Table 3
BMPs for Groundwater Recharge, Stormwater Runoff
Quality, and/or Stormwater Runoff Quantity
only with a Waiver or Variance from N.J.A.C. 7:8-5.3
Best Management Practice
Stormwater Runoff Quality TSS Removal Rate
(percent)
Stormwater Runoff Quantity
Groundwater Recharge
Minimum Separation from Seasonal High Water Table
(feet)
Blue roof
0
Yes
No
N/A
Extended detention basin
40 to 60
Yes
No
1
Manufactured treatment device(h)
50 or 80
No
No
Dependent upon the device
Sand filter(c)
80
Yes
No
1
Subsurface gravel wetland
90
No
No
1
Wet pond
50 to 90
Yes
No
N/A
Notes to Tables 1, 2, and 3:
(a)
Subject to the applicable contributory drainage area limitation specified at § 30-512.4o2;
(b)
Designed to infiltrate into the subsoil;
(c)
Designed with underdrains;
(d)
Designed to maintain at least a ten-foot-wide area of native vegetation along at least 50% of the shoreline and to include a stormwater runoff retention component designed to capture stormwater runoff for beneficial reuse, such as irrigation;
(e)
Designed with a slope of less than 2%;
(f)
Designed with a slope of equal to or greater than 2%;
(g)
Manufactured treatment devices that meet the definition of green infrastructure at § 30-512.2;
(h)
Manufactured treatment devices that do not meet the definition of green infrastructure at § 30-512.2.
g. 
An alternative stormwater management measure, alternative removal rate, and/or alternative method to calculate the removal rate may be used if the design engineer demonstrates the capability of the proposed alternative stormwater management measure and/or the validity of the alternative rate or method to the municipality. A copy of any approved alternative stormwater management measure, alternative removal rate, and/or alternative method to calculate the removal rate shall be provided to the Department in accordance with § 30-512.6b. Alternative stormwater management measures may be used to satisfy the requirements at § 30-512.4o only if the measures meet the definition of green infrastructure at § 30-512.2. Alternative stormwater management measures that function in a similar manner to a BMP listed at § 30-512.4o2 are subject to the contributory drainage area limitation specified at § 30-512.4o2 for that similarly functioning BMP. Alternative stormwater management measures approved in accordance with this subsection that do not function in a similar manner to any BMP listed at § 30-512.4o2 shall have a contributory drainage area less than or equal to 2.5 acres, except for alternative stormwater management measures that function similarly to cisterns, grass swales, green roofs, standard constructed wetlands, vegetative filter strips, and wet ponds, which are not subject to a contributory drainage area limitation. Alternative measures that function similarly to standard constructed wetlands or wet ponds shall not be used for compliance with the stormwater runoff quality standard unless a variance in accordance with N.J.A.C. 7:8-4.6 or a waiver from strict compliance in accordance with § 30-512.4d is granted from § 30-512.4o.
h. 
Whenever the stormwater management design includes one or more BMPs that will infiltrate stormwater into subsoil, the design engineer shall assess the hydraulic impact on the groundwater table and design the site, so as to avoid adverse hydraulic impacts. Potential adverse hydraulic impacts include, but are not limited to, exacerbating a naturally or seasonally high water table, so as to cause surficial ponding, flooding of basements, or interference with the proper operation of subsurface sewage disposal systems or other subsurface structures within the zone of influence of the groundwater mound, or interference with the proper functioning of the stormwater management measure itself.
i. 
Design standards for stormwater management measures are as follows:
1. 
Stormwater management measures shall be designed to take into account the existing site conditions, including, but not limited to, environmentally critical areas; wetlands; flood-prone areas; slopes; depth to seasonal high water table; soil type, permeability, and texture; drainage area and drainage patterns; and the presence of solution-prone carbonate rocks (limestone);
2. 
Stormwater management measures shall be designed to minimize maintenance, facilitate maintenance and repairs, and ensure proper functioning. Trash racks shall be installed at the intake to the outlet structure, as appropriate, and shall have parallel bars with one-inch spacing between the bars to the elevation of the water quality design storm. For elevations higher than the water quality design storm, the parallel bars at the outlet structure shall be spaced no greater than one-third the width of the diameter of the orifice or one-third the width of the weir, with a minimum spacing between bars of one inch and a maximum spacing between bars of six inches. In addition, the design of trash racks must comply with the requirements of § 30-512.8c;
3. 
Stormwater management measures shall be designed, constructed, and installed to be strong, durable, and corrosion resistant. Measures that are consistent with the relevant portions of the Residential Site Improvement Standards at N.J.A.C. 5:21-7.3, 7.4, and 7.5 shall be deemed to meet this requirement;
4. 
Stormwater management BMPs shall be designed to meet the minimum safety standards for stormwater management BMPs at § 30-512.8; and
5. 
The size of the orifice at the intake to the outlet from the stormwater management BMP shall be a minimum of 2 1/2 inches in diameter.
j. 
Manufactured treatment devices may be used to meet the requirements of this subchapter, provided the pollutant removal rates are verified by the New Jersey Corporation for Advanced Technology and certified by the Department. Manufactured treatment devices that do not meet the definition of green infrastructure at § 30-512.2 may be used only under the circumstances described at § 30-512.4o4.
k. 
Any application for a new agricultural development that meets the definition of major development at § 30-512.2 shall be submitted to the Soil Conservation District for review and approval in accordance with the requirements at § 30-512.4o, p, q and r and any applicable Soil Conservation District guidelines for stormwater runoff quantity and erosion control. For purposes of this subsection, "agricultural development" means land uses normally associated with the production of food, fiber, and livestock for sale. Such uses do not include the development of land for the processing or sale of food and the manufacture of agriculturally related products.
l. 
If there is more than one drainage area, the groundwater recharge, stormwater runoff quality, and stormwater runoff quantity standards at § 30-512.4p, q and r shall be met in each drainage area, unless the runoff from the drainage areas converge onsite and no adverse environmental impact would occur as a result of compliance with any one or more of the individual standards being determined utilizing a weighted average of the results achieved for that individual standard across the affected drainage areas.
m. 
Any stormwater management measure authorized under the municipal stormwater management plan or ordinance shall be reflected in a deed notice recorded in the Essex County Clerk's Office located at: 465 Dr Martin Luther King Jr Boulevard, Newark, New Jersey 07102. A form of deed notice shall be submitted to the municipality for approval prior to filing. The deed notice shall contain a description of the stormwater management measure(s) used to meet the green infrastructure, groundwater recharge, stormwater runoff quality, and stormwater runoff quantity standards at § 30-512.4o, p, q and r and shall identify the location of the stormwater management measure(s) in NAD 1983 State Plane New Jersey FIPS 2900 US feet or latitude and longitude in decimal degrees. The deed notice shall also reference the maintenance plan required to be recorded upon the deed pursuant to § 30-512.10b5. Prior to the commencement of construction, proof that the above required deed notice has been filed shall be submitted to the municipality. Proof that the required information has been recorded on the deed shall be in the form of either a copy of the complete recorded document or a receipt from the clerk or other proof of recordation provided by the recording office. However, if the initial proof provided to the municipality is not a copy of the complete recorded document, a copy of the complete recorded document shall be provided to the municipality within 180 calendar days of the authorization granted by the municipality.
n. 
A stormwater management measure approved under the municipal stormwater management plan or ordinance may be altered or replaced with the approval of the municipality, if the municipality determines that the proposed alteration or replacement meets the design and performance standards pursuant to § 30-512.4 and provides the same level of stormwater management as the previously approved stormwater management measure that is being altered or replaced. If an alteration or replacement is approved, a revised deed notice shall be submitted to the municipality for approval and subsequently recorded with the Office of the Clerk of the County of Essex and shall contain a description and location of the stormwater management measure, as well as reference to the maintenance plan, in accordance with paragraph m above. Prior to the commencement of construction, proof that the above required deed notice has been filed shall be submitted to the municipality in accordance with paragraph m above.
o. 
Green Infrastructure Standards.
1. 
This subsection specifies the types of green infrastructure BMPs that may be used to satisfy the groundwater recharge, stormwater runoff quality, and stormwater runoff quantity standards.
2. 
To satisfy the groundwater recharge and stormwater runoff quality standards at § 30-512.4p and q, the design engineer shall utilize green infrastructure BMPs identified in Table 1 at § 30-512.4,f and/or an alternative stormwater management measure approved in accordance with § 30-512.4g. The following green infrastructure BMPs are subject to the following maximum contributory drainage area limitations:
Best Management Practice
Maximum Contributory Drainage Area
Dry well
1 acre
Manufactured treatment device
2.5 acres
Pervious pavement systems
Area of additional inflow cannot exceed three times the area occupied by the BMP
Small-scale bioretention systems
2.5 acres
Small-scale infiltration basin
2.5 acres
Small-scale sand filter
2.5 acres
3. 
To satisfy the stormwater runoff quantity standards at § 30-512.4r, the design engineer shall utilize BMPs from Table 1 or from Table 2 and/or an alternative stormwater management measure approved in accordance with § 30-512.4g.
4. 
If a variance in accordance with N.J.A.C. 7:8-4.6 or a waiver from strict compliance in accordance with § 30-512.4d is granted from the requirements of this subsection, then BMPs from Table 1, 2, or 3, and/or an alternative stormwater management measure approved in accordance with § 30-512.4g may be used to meet the groundwater recharge, stormwater runoff quality, and stormwater runoff quantity standards at § 30-512.4p, q and r.
5. 
For separate or combined storm sewer improvement projects, such as sewer separation, undertaken by a government agency or public utility (for example, a sewerage company), the requirements of this subsection shall only apply to areas owned in fee simple by the government agency or utility, and areas within a right-of-way or easement held or controlled by the government agency or utility; the entity shall not be required to obtain additional property or property rights to fully satisfy the requirements of this subsection. Regardless of the amount of area of a separate or combined storm sewer improvement project subject to the green infrastructure requirements of this subsection, each project shall fully comply with the applicable groundwater recharge, stormwater runoff quality control, and stormwater runoff quantity standards at § 30-512.4p, q and r, unless the project is granted a waiver from strict compliance in accordance with § 30-512.4d.
p. 
Groundwater Recharge Standards.
1. 
This subsection contains the minimum design and performance standards for groundwater recharge as follows.
2. 
The design engineer shall, using the assumptions and factors for stormwater runoff and groundwater recharge calculations at § 30-512.5, either:
(a) 
Demonstrate through hydrologic and hydraulic analysis that the site and its stormwater management measures maintain 100% of the average annual pre-construction groundwater recharge volume for the site; or
(b) 
Demonstrate through hydrologic and hydraulic analysis that the increase of stormwater runoff volume from pre-construction to post-construction for the two-year storm is infiltrated.
3. 
This groundwater recharge requirement does not apply to projects within the "urban redevelopment area," or to projects subject to paragraph 4 below.
4. 
The following types of stormwater shall not be recharged:
(a) 
Stormwater from areas of high pollutant loading. High pollutant loading areas are areas in industrial and commercial developments where solvents and/or petroleum products are loaded/unloaded, stored, or applied, areas where pesticides are loaded/unloaded or stored; areas where hazardous materials are expected to be present in greater than "reportable quantities" as defined by the United States Environmental Protection Agency (EPA) at 40 CFR 302.4; areas where recharge would be inconsistent with Department approved remedial action work plan or landfill closure plan and areas with high risks for spills of toxic materials, such as gas stations and vehicle maintenance facilities; and
(b) 
Industrial stormwater exposed to "source material." "Source material" means any material(s) or machinery, located at an industrial facility, that is directly or indirectly related to process, manufacturing or other industrial activities, which could be a source of pollutants in any industrial stormwater discharge to groundwater. Source materials include, but are not limited to, raw materials; intermediate products; final products; waste materials; by-products; industrial machinery and fuels, and lubricants, solvents, and detergents that are related to process, manufacturing, or other industrial activities that are exposed to stormwater.
q. 
Stormwater Runoff Quality Standards.
1. 
This subsection contains the minimum design and performance standards to control stormwater runoff quality impacts of major development. Stormwater runoff quality standards are applicable when the major development results in an increase of one-quarter acre or more of regulated motor vehicle surface.
2. 
Stormwater management measures shall be designed to reduce the post-construction load of total suspended solids (TSS) in stormwater runoff generated from the water quality design storm as follows:
(a) 
Eighty percent TSS removal of the anticipated load, expressed as an annual average shall be achieved for the stormwater runoff from the net increase of motor vehicle surface.
(b) 
If the surface is considered regulated motor vehicle surface because the water quality treatment for an area of motor vehicle surface that is currently receiving water quality treatment either by vegetation or soil, by an existing stormwater management measure, or by treatment at a wastewater treatment plant is to be modified or removed, the project shall maintain or increase the existing TSS removal of the anticipated load expressed as an annual average.
3. 
The requirement to reduce TSS does not apply to any stormwater runoff in a discharge regulated under a numeric effluent limitation for TSS imposed under the New Jersey Pollutant Discharge Elimination System (NJPDES) rules, N.J.A.C. 7:14A, or in a discharge specifically exempt under a NJPDES permit from this requirement. Every major development, including any that discharge into a combined sewer system, shall comply with Paragraph 2 above, unless the major development is itself subject to a NJPDES permit with a numeric effluent limitation for TSS or the NJPDES permit to which the major development is subject exempts the development from a numeric effluent limitation for TSS.
4. 
The water quality design storm is 1.25 inches of rainfall in two hours. Water quality calculations shall take into account the distribution of rain from the water quality design storm, as reflected in Table 4, below. The calculation of the volume of runoff may take into account the implementation of stormwater management measures.
Table 4 - Water Quality Design Storm Distribution
Time
(Minutes)
Cumulative Rainfall
(Inches)
Time
(Minutes)
Cumulative Rainfall
(Inches)
Time
(Minutes)
Cumulative Rainfall
(Inches)
1
0.00166
41
0.1728
81
1.0906
2
0.00332
42
0.1796
82
1.0972
3
0.00498
43
0.1864
83
1.1038
4
0.00664
44
0.1932
84
1.1104
5
0.00830
45
0.2000
85
1.1170
6
0.00996
46
0.2117
86
1.1236
7
0.01162
47
0.2233
87
1.1302
8
0.01328
48
0.2350
88
1.1368
9
0.01494
49
0.2466
89
1.1434
10
0.01660
50
0.2583
90
1.1500
11
0.01828
51
0.2783
91
1.1550
12
0.01996
52
0.2983
92
1.1600
13
0.02164
53
0.3183
93
1.1650
14
0.02332
54
0.3383
94
1.1700
15
0.02500
55
0.3583
95
1.1750
16
0.03000
56
0.4116
96
1.1800
17
0.03500
57
0.4650
97
1.1850
18
0.04000
58
0.5183
98
1.1900
19
0.04500
59
0.5717
99
1.1950
20
0.05000
60
0.6250
100
1.2000
21
0.05500
61
0.6783
101
1.2050
22
0.06000
62
0.7317
102
1.2100
23
0.06500
63
0.7850
103
1.2150
24
0.07000
64
0.8384
104
1.2200
25
0.07500
65
0.8917
105
1.2250
26
0.08000
66
0.9117
106
1.2267
27
0.08500
67
0.9317
107
1.2284
28
0.09000
68
0.9517
108
1.2300
29
0.09500
69
0.9717
109
1.2317
30
0.10000
70
0.9917
110
1.2334
31
0.10660
71
1.0034
111
1.2351
32
0.11320
72
1.0150
112
1.2367
33
0.11980
73
1.0267
113
1.2384
34
0.12640
74
1.0383
114
1.2400
35
0.13300
75
1.0500
115
1.2417
36
0.13960
76
1.0568
116
1.2434
37
0.14620
77
1.0636
117
1.2450
38
0.15280
78
1.0704
118
1.2467
39
0.15940
79
1.0772
119
1.2483
40
0.16600
80
1.0840
120
1.2500
5. 
If more than one BMP in series is necessary to achieve the required 80% TSS reduction for a site, the applicant shall utilize the following formula to calculate TSS reduction:
R = A + B - (A x B)/100
Where:
R
=
total TSS percent load removal from application of both BMPs
A
=
the TSS percent removal rate applicable to the first BMP
B
=
the TSS percent removal rate applicable to the second BMP
6. 
Stormwater management measures shall also be designed to reduce, to the maximum extent feasible, the post-construction nutrient load of the anticipated load from the developed site in stormwater runoff generated from the water quality design storm. In achieving reduction of nutrients to the maximum extent feasible, the design of the site shall include green infrastructure BMPs that optimize nutrient removal while still achieving the performance standards in § 30-512.4p, q and r.
7. 
In accordance with the definition of FW1 at N.J.A.C. 7:9B-1.4, stormwater management measures shall be designed to prevent any increase in stormwater runoff to waters classified as FW1.
8. 
The Flood Hazard Area Control Act Rules at N.J.A.C. 7:13-4.1(c)1 establish 300-foot riparian zones along Category One waters, as designated in the Surface Water Quality Standards at N.J.A.C. 7:9B, and certain upstream tributaries to Category One waters. A person shall not undertake a major development that is located within or discharges into a 300-foot riparian zone without prior authorization from the Department under N.J.A.C. 7:13.
9. 
Pursuant to the Flood Hazard Area Control Act Rules at N.J.A.C. 7:13-11.2(j)3.i, runoff from the water quality design storm that is discharged within a 300-foot riparian zone shall be treated in accordance with this subsection to reduce the post-construction load of total suspended solids by 95% of the anticipated load from the developed site, expressed as an annual average.
10. 
This stormwater runoff quality standards do not apply to the construction of one individual single-family dwelling, provided that it is not part of a larger development or subdivision that has received preliminary or final site plan approval prior to December 3, 2018, and that the motor vehicle surfaces are made of permeable material(s) such as gravel, dirt, and/or shells.
r. 
Stormwater Runoff Quantity Standards.
1. 
This subsection contains the minimum design and performance standards to control stormwater runoff quantity impacts of major development.
2. 
In order to control stormwater runoff quantity impacts, the design engineer shall, using the assumptions and factors for stormwater runoff calculations at § 30-512.5, complete one of the following:
(a) 
Demonstrate through hydrologic and hydraulic analysis that for stormwater leaving the site, post-construction runoff hydrographs for the two-, ten-, and 100-year storm events do not exceed, at any point in time, the pre-construction runoff hydrographs for the same storm events;
(b) 
Demonstrate through hydrologic and hydraulic analysis that there is no increase, as compared to the pre-construction condition, in the peak runoff rates of stormwater leaving the site for the two-, ten- and 100-year storm events and that the increased volume or change in timing of stormwater runoff will not increase flood damage at or downstream of the site. This analysis shall include the analysis of impacts of existing land uses and projected land uses assuming full development under existing zoning and land use ordinances in the drainage area;
(c) 
Design stormwater management measures so that the post-construction peak runoff rates for the two-, ten- and 100-year storm events are 50%, 75% and 80%, respectively, of the pre-construction peak runoff rates. The percentages apply only to the post-construction stormwater runoff that is attributable to the portion of the site on which the proposed development or project is to be constructed; or
(d) 
In tidal flood hazard areas, stormwater runoff quantity analysis in accordance with paragraphs 2(a), 2(b) and 2(c) above is required unless the design engineer demonstrates through hydrologic and hydraulic analysis that the increased volume, change in timing, or increased rate of the stormwater runoff, or any combination of the three will not result in additional flood damage below the point of discharge of the major development. No analysis is required if the stormwater is discharged directly into any ocean, bay, inlet, or the reach of any watercourse between its confluence with an ocean, bay, or inlet and downstream of the first water control structure.
3. 
The stormwater runoff quantity standards shall be applied at the site's boundary to each abutting lot, roadway, watercourse, or receiving storm sewer system.
[Added 7-27-2021 by Ord. No. 19-2021]
a. 
Stormwater runoff shall be calculated in accordance with the following:
1. 
The design engineer shall calculate runoff using one of the following methods:
(a) 
The USDA Natural Resources Conservation Service (NRCS) methodology, including the NRCS Runoff Equation and Dimensionless Unit Hydrograph, as described in Chapters 7, 9, 10, 15 and 16 Part 630, Hydrology National Engineering Handbook, incorporated herein by reference as amended and supplemented. This methodology is additionally described in Technical Release 55 - Urban Hydrology for Small Watersheds (TR-55), dated June 1986, incorporated herein by reference as amended and supplemented. Information regarding the methodology is available from the Natural Resources Conservation Service website at: https://www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/stelprdb1044171.pdf or at United States Department of Agriculture Natural Resources Conservation Service, 220 Davison Avenue, Somerset, New Jersey 08873; or
(b) 
The Rational Method for peak flow and the Modified Rational Method for hydrograph computations. The rational and modified rational methods are described in "Appendix A-9 Modified Rational Method" in the Standards for Soil Erosion and Sediment Control in New Jersey, January 2014. This document is available from the State Soil Conservation Committee or any of the Soil Conservation Districts listed at N.J.A.C. 2:90-1.3(a)3. The location, address, and telephone number for each Soil Conservation District is available from the State Soil Conservation Committee, PO Box 330, Trenton, New Jersey 08625. The document is also available at: http://www.nj.gov/agriculture/divisions/anr/pdf/2014NJSoilErosion_ControlStandardsComplete.pdf.
2. 
For the purpose of calculating runoff coefficients and groundwater recharge, there is a presumption that the pre-construction condition of a site or portion thereof is a wooded land use with good hydrologic condition. The term "runoff coefficient" applies to both the NRCS methodology above at § 30-512.5a1(a) and the Rational and Modified Rational Methods at § 30-512.5a1(b). A runoff coefficient or a groundwater recharge land cover for an existing condition may be used on all or a portion of the site if the design engineer verifies that the hydrologic condition has existed on the site or portion of the site for at least five years without interruption prior to the time of application. If more than one land cover have existed on the site during the five years immediately prior to the time of application, the land cover with the lowest runoff potential shall be used for the computations. In addition, there is the presumption that the site is in good hydrologic condition (if the land use type is pasture, lawn, or park), with good cover (if the land use type is woods), or with good hydrologic condition and conservation treatment (if the land use type is cultivation).
3. 
In computing pre-construction stormwater runoff, the design engineer shall account for all significant land features and structures, such as ponds, wetlands, depressions, hedgerows, or culverts, that may reduce preconstruction stormwater runoff rates and volumes.
4. 
In computing stormwater runoff from all design storms, the design engineer shall consider the relative stormwater runoff rates and/or volumes of pervious and impervious surfaces separately to accurately compute the rates and volume of stormwater runoff from the site. To calculate runoff from unconnected impervious cover, urban impervious area modifications as described in the NRCS Technical Release 55 - Urban Hydrology for Small Watersheds or other methods may be employed.
5. 
If the invert of the outlet structure of a stormwater management measure is below the flood hazard design flood elevation as defined at N.J.A.C. 7:13, the design engineer shall take into account the effects of tailwater in the design of structural stormwater management measures.
b. 
Groundwater recharge may be calculated in accordance with the following: The New Jersey Geological Survey Report GSR-32, A Method for Evaluating Groundwater-Recharge Areas in New Jersey, incorporated herein by reference as amended and supplemented. Information regarding the methodology is available from the New Jersey Stormwater Best Management Practices Manual; at the New Jersey Geological Survey website at: https://www.nj.gov/dep/njgs/pricelst/gsreport/gsr32.pdf or at New Jersey Geological and Water Survey, 29 Arctic Parkway, PO Box 420 Mail Code 29-01, Trenton, New Jersey 08625-0420.
[Added 7-27-2021 by Ord. No. 19-2021]
a. 
Technical guidance for stormwater management measures can be found in the documents listed below, which are available to download from the Department's website at: http://www.nj.gov/dep/stormwater/bmp_manual2.htm.
1. 
Guidelines for stormwater management measures are contained in the New Jersey Stormwater Best Management Practices Manual, as amended and supplemented. Information is provided on stormwater management measures such as, but not limited to, those listed in Tables 1, 2, and 3.
2. 
Additional maintenance guidance is available on the Department's website at: https://www.njstormwater.org/maintenance_guidance.htm.
b. 
Submissions required for review by the Department should be mailed to: The Division of Water Quality, New Jersey Department of Environmental Protection, Mail Code 401-02B, PO Box 420, Trenton, New Jersey 08625-0420.
[Added 7-27-2021 by Ord. No. 19-2021]
a. 
Site design features identified under § 30-512.4f above, or alternative designs in accordance with § 30-512.4g above, to prevent discharge of trash and debris from drainage systems shall comply with the following standard to control passage of solid and floatable materials through storm drain inlets. For purposes of this paragraph, "solid and floatable materials" means sediment, debris, trash, and other floating, suspended, or settleable solids. For exemptions to this standard see § 30-512.7a2 below.
1. 
Design engineers shall use one of the following grates whenever they use a grate in pavement or another ground surface to collect stormwater from that surface into a storm drain or surface water body under that grate:
(a) 
The New Jersey Department of Transportation (NJDOT) bicycle safe grate, which is described in Chapter 2.4 of the NJDOT Bicycle Compatible Roadways and Bikeways Planning and Design Guidelines; or
(b) 
A different grate, if each individual clear space in that grate has an area of no more than seven square inches, or is no greater than 0.5 inch across the smallest dimension.
Examples of grates subject to this standard include grates in grate inlets, the grate portion (non-curb-opening portion) of combination inlets, grates on storm sewer manholes, ditch grates, trench grates, and grates of spacer bars in slotted drains. Examples of ground surfaces include surfaces of roads (including bridges), driveways, parking areas, bikeways, plazas, sidewalks, lawns, fields, open channels, and stormwater system floors used to collect stormwater from the surface into a storm drain or surface water body.
(c) 
For curb-opening inlets, including curb-opening inlets in combination inlets, the clear space in that curb opening, or each individual clear space if the curb opening has two or more clear spaces, shall have an area of no more than seven square inches, or be no greater than two inches across the smallest dimension.
2. 
The standard in paragraph a1 above does not apply:
(a) 
Where each individual clear space in the curb opening in existing curb-opening inlet does not have an area of more than nine square inches;
(b) 
Where the municipality agrees that the standards would cause inadequate hydraulic performance that could not practicably be overcome by using additional or larger storm drain inlets;
(c) 
Where flows from the water quality design storm as specified in N.J.A.C. 7:8 are conveyed through any device (e.g., end of pipe netting facility, manufactured treatment device, or a catch basin hood) that is designed, at a minimum, to prevent delivery of all solid and floatable materials that could not pass through one of the following:
(1) 
A rectangular space 4.625 inches long and 1.5 inches wide (this option does not apply for outfall netting facilities); or
(2) 
A bar screen having a bar spacing of 0.5 inch.
Note that these exemptions do not authorize any infringement of requirements in the Residential Site Improvement Standards for bicycle safe grates in new residential development (N.J.A.C. 5:21-4.18(b)2 and 7.4(b)1).
(d) 
Where flows are conveyed through a trash rack that has parallel bars with one-inch spacing between the bars, to the elevation of the Water Quality Design Storm as specified in N.J.A.C. 7:8; or
(e) 
Where the New Jersey Department of Environmental Protection determines, pursuant to the New Jersey Register of Historic Places Rules at N.J.A.C. 7:4-7.2(c), that action to meet this standard is an undertaking that constitutes an encroachment or will damage or destroy the New Jersey Register listed historic property.
[Added 7-27-2021 by Ord. No. 19-2021]
a. 
This section sets forth requirements to protect public safety through the proper design and operation of stormwater management BMPs. This section applies to any new stormwater management BMP.
b. 
The provisions of this section are not intended to preempt more stringent municipal or county safety requirements for new or existing stormwater management BMPs. Municipal and county stormwater management plans and ordinances may, pursuant to their authority, require existing stormwater management BMPs to be retrofitted to meet one or more of the safety standards in § 30-512.8c1, § 30-512.8c2, and § 30-512.8c3 for trash racks, overflow grates, and escape provisions at outlet structures.
c. 
Requirements for Trash Racks, Overflow Grates and Escape Provisions.
1. 
A trash rack is a device designed to catch trash and debris and prevent the clogging of outlet structures. Trash racks shall be installed at the intake to the outlet from the Stormwater management BMP to ensure proper functioning of the BMP outlets in accordance with the following:
(a) 
The trash rack shall have parallel bars, with no greater than six-inch spacing between the bars;
(b) 
The trash rack shall be designed so as not to adversely affect the hydraulic performance of the outlet pipe or structure;
(c) 
The average velocity of flow through a clean trash rack is not to exceed 2.5 feet per second under the full range of stage and discharge. Velocity is to be computed on the basis of the net area of opening through the rack; and
(d) 
The trash rack shall be constructed of rigid, durable, and corrosion resistant material and designed to withstand a perpendicular live loading of 300 pounds per square foot.
2. 
An overflow grate is designed to prevent obstruction of the overflow structure. If an outlet structure has an overflow grate, such grate shall meet the following requirements:
(a) 
The overflow grate shall be secured to the outlet structure but removable for emergencies and maintenance.
(b) 
The overflow grate spacing shall be no less than two inches across the smallest dimension.
(c) 
The overflow grate shall be constructed and installed to be rigid, durable, and corrosion resistant, and shall be designed to withstand a perpendicular live loading of 300 pounds per square foot.
3. 
Stormwater management BMPs shall include escape provisions as follows:
(a) 
If a stormwater management BMP has an outlet structure, escape provisions shall be incorporated in or on the structure. Escape provisions include the installation of permanent ladders, steps, rungs, or other features that provide easily accessible means of egress from stormwater management BMPs. With the prior approval of the municipality pursuant to § 30-512.8c, a free-standing outlet structure may be exempted from this requirement;
(b) 
Safety ledges shall be constructed on the slopes of all new stormwater management BMPs having a permanent pool of water deeper than 2 1/2 feet. Safety ledges shall be comprised of two steps. Each step shall be four to six feet in width. One step shall be located approximately 2 1/2 feet below the permanent water surface, and the second step shall be located one to 1 1/2 feet above the permanent water surface. See § 30-512.8e for an illustration of safety ledges in a stormwater management BMP; and
(c) 
In new stormwater management BMPs, the maximum interior slope for an earthen dam, embankment, or berm shall not be steeper than three horizontal to one vertical.
d. 
Variance or Exemption from Safety Standard. A variance or exemption from the safety standards for stormwater management BMPs may be granted only upon a written finding by the municipality that the variance or exemption will not constitute a threat to public safety.
e. 
Safety Ledge Illustration.
Elevation View - Basin Safety Ledge Configuration
30Elevationview.tif
[Added 7-27-2021 by Ord. No. 19-2021]
a. 
Submission of Site Development Stormwater Plan.
1. 
Whenever an applicant seeks municipal approval of a development subject to this section, the applicant shall submit all of the required components of the Checklist for the Site Development Stormwater Plan at § 30-512.9c below as part of the submission of the application for approval.
2. 
The applicant shall demonstrate that the project meets the standards set forth in this section.
3. 
The applicant shall submit 18 copies of the materials listed in the checklist for site development stormwater plans in accordance with § 30-512.9c.
b. 
Site Development Stormwater Plan Approval. The applicant's Site Development project shall be reviewed as a part of the review process by the municipal board or official from which municipal approval is sought. That municipal board or official shall consult the municipality's review engineer to determine if all of the checklist requirements have been satisfied and to determine if the project meets the standards set forth in this section.
c. 
Submission of Site Development Stormwater Plan. The following information shall be required:
1. 
Topographic Base Map. The reviewing engineer may require upstream tributary drainage system information as necessary. It is recommended that the topographic base map of the site be submitted which extends a minimum of 200 feet beyond the limits of the proposed development, at a scale of one inch equals 200 feet or greater, showing two-foot contour intervals. The map as appropriate may indicate the following: existing surface water drainage, shorelines, steep slopes, soils, erodible soils, perennial or intermittent streams that drain into or upstream of the Category One waters, wetlands and flood plains along with their appropriate buffer strips, marshlands and other wetlands, pervious or vegetative surfaces, existing man-made structures, roads, bearing and distances of property lines, and significant natural and manmade features not otherwise shown.
2. 
Environmental Site Analysis. A written and graphic description of the natural and man-made features of the site and its surroundings should be submitted. This description should include a discussion of soil conditions, slopes, wetlands, waterways and vegetation on the site. Particular attention should be given to unique, unusual, or environmentally sensitive features and to those that provide particular opportunities or constraints for development.
3. 
Project Description and Site Plans. A map (or maps) at the scale of the topographical base map indicating the location of existing and proposed buildings roads, parking areas, utilities, structural facilities for stormwater management and sediment control, and other permanent structures. The map(s) shall also clearly show areas where alterations will occur in the natural terrain and cover, including lawns and other landscaping, and seasonal high groundwater elevations. A written description of the site plan and justification for proposed changes in natural conditions shall also be provided.
4. 
Land Use Planning and Source Control Plan. This plan shall provide a demonstration of how the goals and standards of § 30-512.3 through § 30-512.5 are being met. The focus of this plan shall be to describe how the site is being developed to meet the objective of controlling groundwater recharge, stormwater quality and stormwater quantity problems at the source by land management and source controls whenever possible.
5. 
Stormwater Management Facilities Map. The following information, illustrated on a map of the same scale as the topographic base map, shall be included:
(a) 
Total area to be disturbed, paved or built upon, proposed surface contours, land area to be occupied by the stormwater management facilities and the type of vegetation thereon, and details of the proposed plan to control and dispose of stormwater.
(b) 
Details of all stormwater management facility designs, during and after construction, including discharge provisions, discharge capacity for each outlet at different levels of detention and emergency spillway provisions with maximum discharge capacity of each spillway.
6. 
Calculations.
(a) 
Comprehensive hydrologic and hydraulic design calculations for the pre-development and post-development conditions for the design storms specified in § 30-512.4.
(b) 
When the proposed stormwater management control measures depend on the hydrologic properties of soils or require certain separation from the seasonal high water table, then a soils report shall be submitted. The soils report shall be based on onsite boring logs or soil pit profiles. The number and location of required soil borings or soil pits shall be determined based on what is needed to determine the suitability and distribution of soils present at the location of the control measure.
7. 
Maintenance and Repair Plan. The design and planning of the stormwater management facility shall meet the maintenance requirements of § 30-512.10.
8. 
Waiver from Submission Requirements. The municipal official or board reviewing an application under this section may, in consultation with the municipality's review engineer, waive submission of any of the requirements in § 30-512.9c1 through § 30-512.9c6 when it can be demonstrated that the information requested is impossible to obtain or it would create a hardship on the applicant to obtain and its absence will not materially affect the review process.
[Added 7-27-2021 by Ord. No. 19-2021]
a. 
Applicability. Projects subject to review as in § 30-512.1c of this section shall comply with the requirements of § 30-512.10b and § 30-512.10c.
b. 
General Maintenance.
1. 
The design engineer shall prepare a maintenance plan for the stormwater management measures incorporated into the design of a major development.
2. 
The maintenance plan shall contain specific preventative maintenance tasks and schedules; cost estimates, including estimated cost of sediment, debris, or trash removal; and the name, address, and telephone number of the person or persons responsible for preventative and corrective maintenance (including replacement). The plan shall contain information on BMP location, design, ownership, maintenance tasks and frequencies, and other details as specified in Chapter 8 of the NJ BMP Manual, as well as the tasks specific to the type of BMP, as described in the applicable chapter containing design specifics.
3. 
If the maintenance plan identifies a person other than the property owner (for example, a developer, a public agency or homeowners' association) as having the responsibility for maintenance, the plan shall include documentation of such person's or entity's agreement to assume this responsibility, or of the owner's obligation to dedicate a stormwater management facility to such person under an applicable ordinance or regulation.
4. 
Responsibility for maintenance shall not be assigned or transferred to the owner or tenant of an individual property in a residential development or project, unless such owner or tenant owns or leases the entire residential development or project. The individual property owner may be assigned incidental tasks, such as weeding of a green infrastructure BMP, provided the individual agrees to assume these tasks; however, the individual cannot be legally responsible for all of the maintenance required.
5. 
If the party responsible for maintenance identified under § 30-512.10b3 above is not a public agency, the maintenance plan and any future revisions based on § 30-512.10b7 below shall be recorded upon the deed of record for each property on which the maintenance described in the maintenance plan must be undertaken.
6. 
Preventative and corrective maintenance shall be performed to maintain the functional parameters (storage volume, infiltration rates, inflow/outflow capacity, etc.). of the stormwater management measure, including, but not limited to, repairs or replacement to the structure; removal of sediment, debris, or trash; restoration of eroded areas; snow and ice removal; fence repair or replacement; restoration of vegetation; and repair or replacement of non-vegetated linings.
7. 
The party responsible for maintenance identified under § 30-512.10b3 above shall perform all of the following requirements:
(a) 
Maintain a detailed log of all preventative and corrective maintenance for the structural stormwater management measures incorporated into the design of the development, including a record of all inspections and copies of all maintenance-related work orders;
(b) 
Evaluate the effectiveness of the maintenance plan at least once per year and adjust the plan and the deed as needed; and
(c) 
Retain and make available, upon request by any public entity with administrative, health, environmental, or safety authority over the site, the maintenance plan and the documentation required by § 30-512.10b6 and b7 above.
8. 
The requirements of § 30-512.10b3 and b4 do not apply to stormwater management facilities that are dedicated to and accepted by the municipality or another governmental agency, subject to all applicable municipal stormwater general permit conditions, as issued by the Department.
9. 
In the event that the stormwater management facility becomes a danger to public safety or public health, or if it is in need of maintenance or repair, the municipality shall so notify the responsible person in writing. Upon receipt of that notice, the responsible person shall have 14 days to effect maintenance and repair of the facility in a manner that is approved by the municipal engineer or his designee. The municipality, in its discretion, may extend the time allowed for effecting maintenance and repair for good cause. If the responsible person fails or refuses to perform such maintenance and repair, the municipality or County may immediately proceed to do so and shall bill the cost thereof to the responsible person. Nonpayment of such bill may result in a lien on the property.
c. 
Nothing in this subsection shall preclude the municipality in which the major development is located from requiring the posting of a performance or maintenance guarantee in accordance with N.J.S.A. 40:55D-53.
[Added 7-27-2021 by Ord. No. 19-2021]
Any person(s) who erects, constructs, alters, repairs, converts, maintains, or uses any building, structure or land in violation of this section shall be subject to a civil fine and penalty not exceeding $2,000 or such other penalties consistent with N.J.S.A. § 40:49-5. Each and every day that the building, structure or land remains in violation of the provisions of this section after the deadline for compliance set forth in the notice of violation issued by the enforcing officer(s) shall be considered a continuing violation punishable as a separate and distinct offense. The Municipal Court or Superior Court shall have jurisdiction to hear and decide any action(s) brought to enforce the provisions of this section, and any final order imposing fines and penalties for a violation of this section shall be enforceable in the Municipal Court or Superior Court and collectible as a lien against the property of the violator in accordance with the Penalty Enforcement Law of 1999, N.J.S.A. 2A:58-10 to -12.
[Added 7-27-2021 by Ord. No. 19-2021]
This section shall be enforced by the Borough Property Maintenance Officer, Zoning Officer, or the Borough Engineer or their designee.
[Added 7-27-2021 by Ord. No. 19-2021]
Each section, subsection, sentence, clause and phrase of this section is declared to be an independent section, subsection, sentence, clause and phrase, and the finding or holding of any such portion of this section to be unconstitutional, void, or ineffective for any cause, or reason, shall not affect any other portion of this section.
[Added 7-27-2021 by Ord. No. 19-2021]
This section shall be in full force and effect from and after its adoption and any publication as required by law.
All sewage disposal shall utilize public sewers, designed in accordance with the requirements of the applicable sewage authority.
Where public water is accessible, water mains shall be constructed in such a manner as to make adequate water service available to each lot or building within the development. The entire system shall be designed in accordance with the requirements and standards of the agency having approval authority and shall be subject to its approval provided, however, that the system shall not include treatment or storage facilities to service off-tract development. The system shall be designed with adequate capacity and sustained pressure in a looped system with no dead-end lines.
Where no public water is accessible, water shall be furnished on an individual lot basis, or, if controlled by a homeowners association or similar organization, one (1) well may service multiple lots. If wells are installed on each lot and the lot also contains its own sewage disposal facilities, the wells shall be of the drilled type with a minimum of fifty (50) feet of casing. Well installation, sealing and testing shall be in accordance with the New Jersey Standards for Construction of Water Supply Systems in Realty Improvements (Chapter 199 of the Public Laws of 1954), as amended, and shall be certified by the well driller. Before being placed in consumer use, it shall be disinfected by the use of sodium hypochlorite or other acceptable solution and a sample collected by a County or State Health Department representative for bacteriological examination as well as a certificate from the Health Officer that the owner has complied with the applicable local and State health regulations shall be submitted to the Borough before the issuance of building permits in connection with each individual lot.
a. 
In areas served by public water, fire hydrants shall be located as approved by the Chief of the Fire Department.
Where there is a public water system, no portion of a structure shall be more than three hundred (300) feet from a fire hydrant.
b. 
Where no public water exists or will be provided, and where streams or ponds exist or are proposed on lands to be developed, facilities shall be provided to draft water for firefighting purposes. This shall include access to a public street suitable for use by firefighting equipment and construction of or improvements to ponds, dams or similar on-site or off-site development, where feasible. Such facilities shall be constructed to the satisfaction of the Borough Engineer, Fire Inspector and Fire Insurance Rating Organization Standards.
a. 
All developments shall be served by telephone and electric service, and, where available, gas service, public water in accordance with Section 30-514, public sanitary sewerage in accordance with Section 30-513 and cable T.V.
b. 
Each such service shall be connected to an approved public utilities system where one exists.
a. 
All utility services shall be below ground, except that terminal boxes may be located above ground. If located within a street, the utilities shall be outside of the cartway except for required crossings. Lots which abut existing streets where overhead electric or telephone distribution supply lines and service connections have heretofore been installed may be supplied with electric and telephone service from these overhead lines, but any new service connections from the utilities' overhead lines shall be installed underground. In the case of existing overhead utilities, however, should a road widening or an extension of service or other such condition occur as a result of the development and necessitate the replacement or relocation of such utilities, such replacement or relocation shall be underground, if in accordance with current PUC regulations.
b. 
The developer shall arrange with the servicing utility for the underground installation of the utilities' distribution supply lines and service connections in accordance with the provisions of the applicable Standard Terms and Conditions incorporated as part of the servicing utility's tariff and on file with the State of New Jersey Board of Public Utility Commissioners. The developer shall submit prior to the granting of final approval, a written instrument from each servicing utility which shall evidence full compliance or intended full compliance with the provisions of this section.
The developer shall provide the Borough with at least four (4) copies of a final "as built" plan showing the installed location(s) of all utilities.
The entire development shall be landscaped in accordance with an approved landscaping plan. Landscaping shall include items having an effect on project safety, habitability and appearance such as:
a. 
Grading and water features.
b. 
Plantings and grassed areas.
c. 
Surfacing and finishes.
d. 
Walls and fences.
e. 
Area lighting.
f. 
Signs and street and site furniture.
g. 
Preservation of natural features.
The project shall be landscaped so as to best adapt the site to the intended use, to control the project's environmental impact and to enhance the appearance of the project, both on-site and from the surrounding area.
Plantings shall be in accordance with the following standards:
a. 
Plant Material. American Association of Nurserymen's American Standard for Nursery Stock, current edition.
b. 
Grassing. New Jersey State Soil Conservation Committee's Standards for Soil Erosion and Sedimentation Control in New Jersey, current edition.
[Amended 12-15-2020 by Ord. No. 25-2020]
Each development plan shall provide for shade trees having a maximum spacing of fifty (50) feet along each side of all streets, public or private, existing or new. In determining the need for new shade trees, the location of existing shade trees shall be considered, and if existing shade trees will remain, new shade trees will not be required in such areas. Additionally, shade trees shall be provided within parking areas containing eight thousand (8,000) or more square feet and shall be planted at a minimum ratio of one (1) shade tree for every ten (10) parking spaces. Shade trees shall be a minimum caliper of two and one-half (2 1/2) inches (D.B.H.). The Board may consult with the Borough Arborist concerning the adequacy and appropriateness of the proposed shade trees.
Screening shall be accomplished through the use of landscape plantings, and shall include as a minimum fifteen (15) conifers and five (5) deciduous trees per one hundred (100) linear feet. Plantings shall be a minimum of six (6) feet in height and have a minimum diameter of two and one-half (2 1/2) inches (D.B.H.).
Landscaping of required buffers and screens shall take into account the opportunities presented by existing site features. Screening, where required, shall be achieved by fencing, earth forms and plantings applied singly or in combination, as necessary. Landscaping used for buffering purposes shall be compatible in scale and character with the surrounding prevailing landscape and project features and shall be designed as part of the overall landscaping plan.
The landscaping plan shall be compatible with the soil erosion and sedimentation control plan.
Soil removal shall be in accordance with provisions of Chapter XX, of the Revised General Ordinances of the Borough of Roseland.
a. 
All development plans shall include a grading plan which provides for a minimum amount of soil to be removed from or brought to the site.
b. 
No topsoil shall be removed from any lot or lots unless certified as excess (more than four (4) inches) in writing by the Borough Engineer. All topsoil so removed shall be placed elsewhere within the Borough.
a. 
All graded or stripped areas shall be stabilized by four (4) inches of topsoil and seeding or other landscaping. Exposed rock may be left in its natural state if it can be demonstrated that the rock face will remain stable.
b. 
All areas shown on the plan shall be graded to ensure that surface water flow is away from buildings and pedestrian walkways in accordance with the approved drainage plan.
c. 
Surfaces shall be designed to reduce maintenance requirements and allow the cutting of grass and cleaning of drainage swales and ditches without special equipment.
d. 
Wherever a change in final grade results in slopes in excess of 2:1 (other than a stable rock face) or wherever it is determined that slopes will not be stable or that erosion will occur, retaining walls shall be used which shall be of a permanent, maintenance free design.
Prior to the issuance of a construction permit, detailed grading plans shall be provided for review by the Borough Engineer. No certificate of occupancy shall be issued until the Borough Engineer is satisfied that final grading has been completed in accordance with the detailed grading plans.
a. 
No tree with a diameter in excess of six (6) inches (D.B.H.) shall be removed if located a distance greater than twenty-five (25) feet from any construction unless approved by the Board.
b. 
All areas of tree removal shall be indicated on the development plan.
c. 
All provisions of any other applicable ordinance of the Borough of Roseland regulating the removal of trees shall be complied with.
a. 
Treed areas to remain shall be protected physically during construction, the method of protection to be approved by the Board.
b. 
Wherever grading results in fill being placed around the base of any tree that is to remain, a tree well shall be provided.
a. 
When a development plan incorporates open space, the applicant may, if both the applicant and the Borough agree, deed the open space to the Borough. If the development plan incorporates multiple ownership such as a cooperative or a condominium, any open space not deeded to the Borough shall be owned and maintained by an Association.
b. 
As part of the application for any site plan incorporating open space, a maintenance agreement shall be submitted to the Board for review and approval.
a. 
The use of land for active recreation shall be limited to those areas where topographic features will allow such use without extensive grading and removal of natural vegetation. While the specific usage shall be determined by the applicant, the recreational facilities provided should be suitable for use by the anticipated occupants of the development and should augment and not duplicate existing Borough recreational facilities in the vicinity of the tract if such facilities adequately serve the proposed development.
b. 
Passive open space should be left in its natural state, augmented for erosion control and aesthetic value by landscaping. Particular effort should be made to reduce future maintenance requirements. Improvements should be limited to pedestrian circulation, picnic areas, and similar uses.
c. 
Plans, specifications and manufacturers' catalogue cuts of any proposed recreational improvements or equipment shall be included for the Board's review prior to final approval of the site plan.
[Ord. No. 07-2017 § 4]
a. 
The development plan shall show the total number of off-street parking spaces required for the use or combination of uses indicated in the application. The schedule below represents standards acceptable to the Borough. Since a specific use or combination of uses may generate a parking demand different from those enumerated below, documentation and testimony may be presented to the Board as to the anticipated parking demand. Based upon such documentation and testimony, the Board may:
1. 
Allow construction of a lesser number of spaces, provided that adequate provision is made for construction of the required spaces in the future.
2. 
In the case of nonresidential uses, require that provision be made for the construction of spaces in excess of those required hereinbelow, to ensure that the parking demand will be accommodated by off-street spaces.
3. 
Allow the joint or shared use of parking for multiple uses with different peak parking demands.
b. 
Residential Uses.
Residential Uses
Required Spaces
1.
Detached residential
2 spaces per dwelling unit
2.
Attached residential:
Studio, one bedroom
1.8 spaces per unit
Two-bedroom
2.2 spaces per unit
Three bedroom
2.5 spaces per unit
Affordable, senior citizen
2.0 spaces per unit, maximum (Total to be rounded to next higher number.)
c. 
Nonresidential Uses.
Nonresidential Uses
Required Spaces
1.
Retail sales, service
1 space for every 200 square feet of gross floor area or a part thereof
2.
Office
Under 49,999 sq. ft. GFA
5 per 1,000 sq. ft. GFA
50,000 — 99,000 sq. ft. GFA
4 per 1,000 sq. ft. GFA
100,000+ sq. ft. GFA
4.5 per 1,000 sq. ft. GFA or a part thereof
3.
Industrial Manufacturing
1 per 500 sq. ft. GFA or a part thereof
4.
Warehouse — Storage
1 per 500 sq. ft. GFA or a part thereof
5.
Schools and appurtenant structures with grades up to 10th
1 per 400 sq. ft. GFA or a part thereof
6.
Schools and appurtenant structures with grades 10 through 12
1 per 200 sq. ft. GFA or a part thereof
7.
Churches and other places of worship
1 space for every 3 seats in sanctuary plus 1 space for every 250 sq. ft. of remaining floor area or a part thereof
8.
Municipal and Board of Education uses
1 space for every 200 sq. ft. of floor area or a part thereof
9.
Traditional full service restaurants
1 space for each 3 patron seats
10.
Convenience stores
1 space per 100 sq. ft. GFA or a part thereof
11.
Parks
1 space for each employee plus user spaces as deemed necessary
12.
Business luncheon clubs
1 space for every 5 patron seats
13.
Public garages or gasoline service stations
1 space per employee plus 4 per bay
14.
Nursing homes and sanitariums
1 space for every 2 beds
d. 
General Requirements.
1. 
For each dwelling unit in a nonresidential district, two (2) off-street parking spaces shall be provided.
2. 
Permitted nonresidential uses in all residential districts shall be provided with one (1) off-street parking space for every two hundred (200) square feet of floor area, or any fraction thereof, of any building area so used.
3. 
Any building containing more than one (1) use shall meet the combined parking space requirements for all uses in the building, except as provided in paragraph a. above.
4. 
No change in use within a building shall be allowed unless it can be shown sufficient parking is available for the new use on the site.
5. 
For each use, handicapped parking shall be required as a portion of the required parking in accordance with the Barrier-Free Design Regulations, as amended, promulgated by the State of New Jersey.
[Ord. No. 23-1997 § IV]
[Ord. No. 5-2008]
a. 
Residential Zones.
1. 
Off-street parking is permitted in any side or rear yard provided said spaces shall not be closer than five (5) feet from the property line.
2. 
For the purpose of administering this provision, any driveway that connects the abutting street with a garage servicing a detached or single-family attached dwelling can be used to meet the required off-street parking provision.
b. 
Nonresidential Zones.
1. 
All required off-street parking shall be located on the same lot as the use requiring the parking except as allowed below and as specifically approved by the Board.
2. 
In the B-1 Zone only, the applicant may request the Borough, and the Borough may agree, to construct the required parking, whether on or off-site, provided that the applicant pay the full cost of the construction, and further provided that all parking spaces will be located within five hundred (500) feet of the building to be served.
3. 
Any owner or group of owners of two (2) or more nonresidential buildings or uses located in the same block in a B-1 Zone may jointly sponsor the construction of off-street parking facilities, whether on or off-site, provided that: all other applicable requirements of this subsection are met; and further provided that the parking facilities, the buildings and the uses are located in the same block; and further provided that the parking facilities are located on the same side of the street and are not separated by any street; and further provided that no participating use is further than three hundred (300) feet from the edge of the parking area serving it.
4. 
Off-street parking is permitted in any front, side and rear yard pursuant to a plan approved by the Board.
The provisions of Section 30-520 above shall not apply to the continuation of any lawfully nonconforming building or use in existence as of May 29, 1979, so long as its current use is not substantially changed. If the building or use shall be substantially changed to the extent that this chapter requires more parking, then the applicant shall provide that additional parking equal to the differential between that required by the proposed use or building in existence when this chapter was enacted. No additional parking requirements shall prevent or preclude the repair, reconstruction or rebuilding of existing nonconforming off-street parking facilities.
If any applicant can clearly demonstrate to the Planning Board that because of the nature of his operation or use the parking requirements of this subsection are unnecessary or excessive, the Planning Board shall have the power to approve a site plan showing less paved parking area than is required by this subsection; provided, however, that a landscaped area of sufficient size to meet the deficiency shall be set aside and reserved for the purposes of meeting future off-street parking requirements in the event that a change of use of the premises shall make such additional off-street parking space necessary. Anything in this subsection to the contrary notwithstanding no certificate of occupancy shall be valid except for the particular use for which it was issued, and any change on any premises previously improved under this paragraph shall only be permitted after a new site plan shall have been submitted to and reviewed and approved by the Board. All parts of any yards not used for off-street parking area shall be adequately landscaped, subject to approval by the Board and maintained in good condition.
a. 
Number of Spaces. In all zone districts, for every building, or part thereof, hereafter erected, which is to be occupied for manufacturing, storage, display of goods, retail sales, wholesale or warehouse, market, hospital for humans, laundry, dry cleaning establishment, or other use requiring the receipt or distribution by vehicles of materials or merchandise, there shall be provided and maintained on the same premises with such use, at least, one off-street loading space.
b. 
Location. Loading areas shall be located in side or rear yards only and shall be designed so that no portion of a vehicle shall extend over a public right-of-way during loading or unloading activities.
c. 
No part of an off-street loading space shall be nearer than 25 feet to any property line.
The following agreements shall be provided by the applicant for review and comment or approval by the Board. These agreements shall be part of the final site plan submission, but may be submitted for discussion prior to the final submission.
The applicant shall prepare a Developer's Agreement in a form acceptable to the Borough. This agreement shall set forth the bonding and inspection fee requirements, the period required for the completion of public improvements, and any conditions set forth in the resolutions of preliminary and final approval.
For property to be transferred to the Borough and for all easements shown on the site plan and requested by the Board, the applicant shall prepare all necessary deeds of transfer of title and/or easements in a form acceptable to the Borough. These deed(s) shall be accompanied by a map drawn to the scale of the Borough's tax maps showing proposed lot lines, easements and lot numbers.
If any site plan is approved which involves lands in common ownership, or common elements, the applicant shall establish an organization(s) to own and maintain such common lands and elements. Those documents establishing said organization(s) shall include the following provisions:
a. 
Membership in any created organization by all property owners with the right of enjoyment of all common lands and/or common elements shall be mandatory. Such required membership in any created organization and the responsibilities upon the members shall be in writing between the organization and the individual in the form of a covenant with each member agreeing to his liability for his pro rata share of the organization's costs and providing that the Borough shall be a third party beneficiary to such covenant entitled to enforce its provisions. The terms and conditions of said covenant shall be reviewed by both the Borough Attorney and the Planning Board Attorney prior to final approval.
b. 
Executed deeds transferring title of common land and/or common elements to the organization shall be tendered to the Borough simultaneously with the granting or as a condition of final approval stating that the prescribed use(s) of the lands in common ownership shall be absolute and not subject to reversion for possible future development for the Board's review. Final approval of the site plan shall expire ninety-five (95) days from the date of decision unless within such period the plat and all related deeds and easements shall have been duly filed by the developer with the County Recording Officer.
c. 
The organization shall be responsible for liability insurance, municipal taxes, maintenance of land and any facilities that may be erected on any land deeded to the organization and shall hold the Borough harmless from any liability relating to other common lands or common elements.
d. 
Any assessment levied by the organization may become a lien on the private properties in the development. The duly created organization shall be allowed to adjust the assessment to meet changing needs and any deeded lands may be sold, donated or in any other way conveyed to the Borough for public purposes only, but only if agreed to by the Borough.
e. 
The organization initially created by the developer shall clearly describe in its bylaws the rights and obligations of any owner and tenant in the development, along with the covenant and model deeds and the articles of incorporation of the association, prior to or as a condition of final approval by the Borough.
f. 
Part of the development proposals submitted to and approved by the Borough shall be the provisions to insure that control of the organization will be transferred to the individual owners in the development based on a percentage of the dwelling units sold and/or occupied, together with assurances in the bylaws that the organization shall have the maintenance responsibilities for all lands to which they hold title in accordance with subsection 30-521.4 below.
a. 
Any site plan which incorporates open space and/or private roads entirely owned by the individual, partnership or corporation (other than a homeowner's, cooperative or condominium association) shall enter into a Maintenance Agreement with the Borough subject to the conditions set forth below.
b. 
Any site plan which incorporates open space, land in common ownership or common elements shall establish an organization to maintain such common lands and elements in accordance with law. Such organization shall not be dissolved, nor shall it sell or otherwise dispose of said common lands or elements except to another organization which is conceived and established to own and maintain said common lands and elements. Said organization shall enter into a Maintenance Agreement with the Borough subject to the conditions set forth below.
c. 
In the event that the owner or organization shall fail to maintain the open space or common elements in reasonable order and condition, the Borough Council may serve written notice upon such organization or upon the owners of the development setting forth the manner in which the organization or owners have failed to maintain the open space in reasonable condition, and demanding that any deficiencies be remedied within thirty-five (35) days. This notice shall also state the date and the place of a hearing thereon which shall be held within fifteen (15) days of the date of the notice. At such hearing, the Borough Council may modify the terms of the original notice as to deficiencies and may give an extension of time within which they shall be corrected. If the deficiencies set forth in the original notice or in the modification thereof shall not be corrected within thirty-five (35) days of the date of the notice or within the period of any extension granted, the municipality, in order to preserve the open space or common elements and maintain the same for a period of one (1) year, may enter upon and maintain such land. Said entry and maintenance shall not vest in the public any rights to use the open space or common elements except when the same is voluntarily dedicated to the public by the organization or owners. Before the expiration of said year, the Borough Council shall, upon the request of the organization therefore responsible for the maintenance of the open space or common elements, call a public hearing upon fifteen (15) days notice to such organization or owners of the development, to be held by the Borough Council at which hearing such organization or owners of the development shall show cause why such maintenance by the municipality shall not, at the discretion of the municipality, continue for a succeeding year. If the Borough Council shall determine that such organization is ready and able to maintain such open space or common elements in reasonable condition, the municipality shall cease to maintain said open space or common elements at the end of said year. If the Borough Council shall determine such organization is not ready and able to maintain said open space or common elements in a reasonable condition, the municipality may, in its discretion, continue to maintain said open space or common elements during the next succeeding year and, subject to a similar hearing and determination, in each year thereafter. The decision of the Borough Council in any such case shall constitute a final administrative decision subject to judicial review.
The cost of such maintenance by the municipality shall be assessed ratable against the properties within the development that have a right of enjoyment of the open space or common elements, and shall become a tax lien on said properties. The municipality, at the time of entering upon said open space or common elements for the purpose of maintenance, shall file a notice of such lien in the office of the County Clerk upon the properties affected by such lien within the development and the same shall be discharged by the municipality upon payment as with other liens.