[Added 12-19-2005 by Ord.
2005-004]
A. Policy statement. Flood control, groundwater recharge, and pollutant
reduction through nonstructural or low impact techniques shall be
explored before relying on structural Best Management Practices (BMPs).
Structural BMPs should be integrated with nonstructural stormwater
management measures and proper maintenance plans. Nonstructural measures
include both environmentally sensitive site design and source controls
that prevent pollutants from being placed on the site. Source control
plans should be developed based upon physical site conditions and
the origin, nature, and the anticipated loading of potential pollutants.
Multiple stormwater management BMPs may be necessary to achieve the
established performance standards for water quality, quantity, and
groundwater recharge.
B. Purpose. It is the purpose of this Article
V to establish minimum stormwater management requirements and controls for development.
C. Applicability.
(1) This Article
V shall be applicable to:
(a)
Any site plan or subdivision that requires preliminary or final
site plan review.
(b)
All grading applications for development or redevelopment at
a site for earth disturbance greater than 5,000 square feet in area.
(c)
Redevelopment that includes the creation, addition, or replacement
of 5,000 square feet or more of impervious surface cover, or involves
land development activities of one or more acres.
(d)
Any new development or redevelopment, regardless of size, that
is defined by the Municipal Engineer to be a hotspot land use, as
further defined in Section 30-134F(1)(b)[3][c] herein; or,
(e)
Land development activities that are smaller than the minimum
applicability criteria set forth in paragraphs (b) and (c) above if
such activities are part of a larger common plan of development, even
though multiples, separate and distinct land development activities
may take place at different times on different time schedules.
(2) The following activities are exempt from this Article
V:
(a)
Agricultural or silvicultural land management activities within
areas zoned for these activities, and;
(b)
Repairs to any stormwater management facility or practice deemed
necessary by the Borough.
D. Compatibility with other permit and ordinance requirements. Development approvals issued pursuant to this Article
V are to be considered an integral part of development approvals under the subdivision and site plan review process and do not relieve the applicant of the responsibility to secure required permits or approvals for activities regulated by any other applicable code, rule, act, or ordinance. In their interpretation and application, the provisions of this Article
V shall be held to be the minimum requirements for the promotion of the public health, safety, and general welfare. This Article
V is not intended to interfere with, abrogate, or annul any other ordinances, rule or regulation, statute, or other provision of law except that, where any provision of this Article
V imposes restrictions different from those imposed by any other ordinance, rule or regulation, or other provision of law, the more restrictive provisions or higher standards shall control.
[Added 12-19-2005 Ord.
No. 2005-004]
A. Design and performance standards for stormwater management measures.
(1) Stormwater management measures shall be developed to meet the erosion
control, groundwater recharge, stormwater runoff quantity, and stormwater
runoff quality standards in this section. To the maximum extent feasible,
these standards shall be met by incorporating nonstructural stormwater
management strategies into the design. If these strategies alone are
not sufficient to meet these standards, structural stormwater management
measures necessary to meet these standards shall be incorporated into
the design.
(2) The standards in this Article
V apply to development as defined within Section
30-132C and are intended to minimize the impact of stormwater runoff on water quality and water quantity in receiving water bodies and maintain groundwater recharge. The standards do not apply to new development to the extent that alternative design and performance standards are applicable under a regional stormwater management plan or Water Quality Management Plan adopted in accordance with Department of Environmental Protection rules. Such alternative standards shall provide at least as much protection from stormwater-related loss of groundwater recharge, stormwater quantity and water quality impacts of development projects as would be provided under the standards in this Article
V.
(3) For site improvements regulated under the Residential Site Improvement Standards (RSIS) at N.J.A.C. 5:21, the RSIS shall apply in addition to this Article
V except to the extent the RSIS are superseded by this Article
V or alternative standards applicable under a regional stormwater management plan or Water Quality Management Plan adopted in accordance with Department rules.
[Added 12-19-2005 by Ord.
No. 2005-004]
A. Maintenance plan. The development shall incorporate a maintenance
plan for the stormwater management measures incorporated into the
design of the development.
B. Adverse impacts. Stormwater management measures shall avoid adverse
impacts of concentrated flow on habitat for threatened and endangered
species as documented in the Department's Landscape Project or
Natural Heritage Database established under N.J.S.A. 13:1B-15.147
through 15.150, particularly Helonias bullata (swamp pink) and/or
Clemmys muhlenbergi (bog turtle).
C. Linear development projects. The following linear development projects are exempt from the groundwater recharge, stormwater runoff quantity, and stormwater runoff quality requirements at Sections
30-134F and
30-134G:
(1) The construction of an underground utility line provided that the
disturbed areas are revegetated upon completion;
(2) The construction of an aboveground utility line provided that the
existing conditions are maintained to the maximum extent practicable;
and
(3) The construction of a public pedestrian access, such as a sidewalk
or trail with a maximum width of 14 feet, provided that the access
is made of permeable material.
D. Waivers. A waiver from strict compliance from the groundwater recharge, stormwater runoff quantity, and stormwater runoff quality requirements at Sections
30-134F and
30-134G may be obtained for the enlargement of an existing public roadway or railroad; or the construction or enlargement of a public pedestrian access, provided that the following conditions are met, where applicable:
(1) The applicant demonstrates that there is a public need for the project
that cannot be accomplished by any other means;
(2) The applicant demonstrates through an alternatives analysis, that through the use of nonstructural and structural stormwater management strategies and measures, the option selected complies with the requirements of Sections
30-134F and
30-134G to the maximum extent practicable;
(3) The applicant demonstrates that, in order to meet the requirements at Sections
30-134F and
30-134G, existing structures currently in use, such as homes and buildings would need to be condemned; and
(4) The applicant demonstrates that it does not own or have other rights to areas, including the potential to obtain through condemnation lands not falling under paragraph D(3) above within the upstream drainage area of the receiving stream, which would provide additional opportunities to mitigate for requirements of Sections
30-134F and
30-134G that were not achievable on site.
E. Nonstructural stormwater management strategies.
(1) To the maximum extent practicable, the standards in Sections
30-134F and
30-134G shall be met by incorporating nonstructural stormwater management strategies at Section
30-134E into the design. The applicant shall identify the nonstructural measures incorporated into the design of the project. If the applicant contends that it is not feasible for engineering, environmental, or safety reasons to incorporate any nonstructural stormwater management measures identified in Section
30-134E(2) below into the design of a particular project, the applicant shall identify the strategy considered and provide a basis for the contention.
(2) Nonstructural stormwater management measures incorporated into site
design shall:
(a)
Protect areas that provide water quality benefits or areas particularly
susceptible to erosion and sediment loss;
(b)
Minimize impervious surfaces and break up or disconnect the
flow of runoff over impervious surfaces;
(c)
Maximize the protection of natural drainage features and vegetation;
(d)
Minimize the decrease in the "time of concentration" from pre-construction
to post construction. "Time of concentration" is defined as the time
it takes for runoff to travel from the hydraulically most distant
point of the watershed to the point of interest within a watershed;
(e)
Minimize land disturbance including clearing and grading;
(f)
Minimize soil compaction;
(g)
Provide low-maintenance landscaping that encourages retention
and planting of native vegetation and minimizes the use of lawns,
fertilizers and pesticides;
(h)
Provide vegetated open-channel conveyance systems discharging
into and through stable vegetated areas;
(i)
Provide other source controls to prevent or minimize the use
or exposure of pollutants at the site in order to prevent or minimize
the release of those pollutants into stormwater runoff. These source
controls include, but are not limited to:
[1]
Site design features that help to prevent accumulation of trash
and debris in drainage systems;
[2]
Site design features that help to prevent discharge of trash
and debris from drainage systems;
[3]
Site design features that help to prevent and/or contain spills
or other harmful accumulations of pollutants at industrial or commercial
developments; and
[4]
When establishing vegetation after land disturbance, applying
fertilizer in accordance with the requirements established under the
Soil Erosion and Sediment Control Act, N.J.S.A. 4:24-39 et seq., and
implementing rules.
(3) Any land area used as a nonstructural stormwater management measure to meet the performance standards in Sections
30-134F and
30-134G shall be subjected to a conservation restriction filed with the County Clerk's Office, or subject to an approved equivalent restriction that ensures that measure or an equivalent stormwater management measure approved by the reviewing agency is maintained in perpetuity or, if requested, dedicated to the Borough.
(4) Guidance for nonstructural stormwater management measures is available
in the New Jersey Stormwater Best Management Practices Manual. The
manual is available on the Department of Environmental Protection's
stormwater web page at http://www.njstormwater.org (or successor website).
F. Erosion control, groundwater recharge and runoff quantity standards.
(1) This paragraph F. contains minimum design and performance standards
to control erosion, encourage and control infiltration and groundwater
recharge, and control stormwater runoff quantity impacts of development.
(a)
The minimum design and performance standards for erosion control
are those established under the Soil Erosion and Sediment Control
Act, N.J.S.A. 4:24-39 et seq. and implementing rules.
(b)
The minimum design and performance standards for groundwater
recharge are as follows:
[1]
The design engineer shall, using the assumptions and factors for stormwater runoff and groundwater recharge calculations at Section
30-135, either:
[a] Demonstrate through hydrologic and hydraulic analysis
that the site and its stormwater management measures maintain 100%
of the average annual pre-construction groundwater recharge volume
for the site; or
[b] Demonstrate through hydrologic and hydraulic analysis
that the increase of stormwater runoff volume from preconstruction
to post-construction for the 2-year storm is infiltrated.
[2]
This groundwater recharge requirement does not apply to projects
within the "urban redevelopment" area, or projects subject to paragraph
F(1)(b)[3] below.
[3]
The following types of stormwater shall not be recharged:
[a] Stormwater from Areas of High Pollutant Loading.
High pollutant loading areas are areas in industrial and commercial
developments where solvents and/or petroleum products are loaded/unloaded,
stored, or applied, areas where pesticides are loaded/unloaded or
stored; areas where hazardous materials are expected to be present
in greater than "reportable quantities" as defined by the United States
Environmental Protection Agency (EPA) at 40 CFR 302.4; areas where
recharge would be inconsistent with Department approved remedial action
work plan or landfill closure plan and areas with high risks for spills
of toxic materials, such as gas stations and vehicle maintenance facilities;
and
[b] Industrial Stormwater Exposed to "Source Material."
"Source material" means any material(s) or machinery, located at an
industrial facility that is directly or indirectly related to process,
manufacturing or other industrial activities, which could be a source
of pollutants in any industrial stormwater discharge to groundwater.
Source materials include, but are not limited to, raw materials; intermediate
products; final products; waste materials; by-products; industrial
machinery and fuels, and lubricants, solvents, and detergents that
are related to process, manufacturing, or other industrial activities
that are exposed to stormwater.
[c] Stormwater Hotspots — Below is a list of
examples of designated hotspots. If a site is designated as a hotspot,
it has important implications for how stormwater is managed. First
and foremost, untreated stormwater runoff from hotspots shall not
be allowed to recharge into groundwater where it may contaminate water
supplies. Second, a greater level of stormwater treatment shall be
required at hotspot sites to prevent pollutant washoff after construction.
The Environmental Protection Agency's (EPA) NPDES stormwater
program requires some industrial sites to prepare and implement a
stormwater pollution prevention plan.
The following is a list of designated hotspots:
Vehicle salvage yards and recycling facilities
|
Vehicle fueling stations
|
Vehicle service and maintenance facilities
|
Vehicle and equipment cleaning facilities
|
Fleet storage areas (bus, truck, etc.)
|
Industrial sites as defined under the Industrial Site Recovery
Act (ISRA) (N.J.S.A. 13:1K and N.J.A.C. 7:26B)
|
Marinas (service and maintenance)
|
Outdoor liquid container storage
|
Outdoor loading/unloading facilities
|
Public works storage areas
|
Facilities that generate or store hazardous materials
|
Commercial container nursery
|
Other land uses and activities as designated by the Municipal
Engineer.
|
The following land uses and activities shall not be considered
hotspots:
|
Residential streets and rural highways
|
Residential development
|
Institutional development
|
Office developments
|
Nonindustrial rooftops
|
Pervious areas, (i.e.) nurseries (which may need an integrated
pest management (IPM) plan).
|
[4]
The design engineer shall assess the hydraulic impact on the
groundwater table and design the site so as to avoid adverse hydraulic
impacts. Potential adverse hydraulic impacts include, but are not
limited to, exacerbating a naturally or seasonally high water table
so as to cause surficial ponding, flooding of basements, or interference
with the proper operation of subsurface sewage disposal systems and
other subsurface structures in the vicinity or downgradient of the
groundwater recharge area.
(c)
In order to control stormwater runoff quantity impacts, the design engineer shall, using the assumptions and factors for stormwater runoff calculations at Section
30-135, complete one of the following:
[1]
Demonstrate through hydrologic and hydraulic analysis that for
stormwater leaving the site, post-construction runoff hydrographs
for the 2, 10, and 100 year storm events do not exceed, at any point
in time, the preconstruction runoff hydrographs for the same storm
events;
[2]
Demonstrate through hydrologic and hydraulic analysis that there
is no increase, as compared to the pre-construction condition, in
the peak runoff rates of stormwater leaving the site for the 2, 10,
and 100 year storm events and that the increased volume or change
in timing of stormwater runoff will not increase flood damage at or
downstream of the site. This analysis shall include the analysis of
impacts of existing land uses and projected land uses assuming full
development under existing zoning and land use ordinances in the drainage
area;
[3]
Design stormwater management measures so that the post-construction
peak runoff rates for the 2, 10 and 100 year storm events are 50,
75 and 80 percent, respectively, of the preconstruction peak runoff
rates. The percentages apply only to the post-construction stormwater
runoff that is attributable to the portion of the site on which the
proposed development or project is to be constructed. The percentages
shall not be applied to post-construction stormwater runoff into tidal
flood hazard areas if the increased volume of stormwater runoff will
not increase flood damages below the point of discharge; or
[4]
In tidal flood hazard areas, stormwater runoff quantity analysis
in accordance with paragraphs F(1)(c)[1], [2] and [3] above shall
only be applied if the increased volume of stormwater runoff could
increase flood damages below the point of discharge.
(2) Any application for a new agricultural development that meets the definition of a development at Section
30-143 shall be submitted to the appropriate Soil Conservation District for review and approval in accordance with the requirements of this section and any applicable Soil Conservation District guidelines for stormwater runoff quantity and erosion control. For the purposes of this section, "agricultural development" means land uses normally associated with the production of food, fiber and livestock for sale. Such uses do not include the development of land for the processing or sale of food and the manufacturing of agriculturally related products.
G. Stormwater runoff quality standards.
(1) Stormwater management measures shall be designed to reduce the post-construction
load of total suspended solids (TSS) in stormwater runoff by 80% of
the anticipated load from the developed site, expressed as an annual
average. Stormwater management measures shall only be required for
water quality control if an additional 1/4 acre of impervious surface
is being proposed on a development site. The requirement to reduce
TSS does not apply to any stormwater runoff in a discharge regulated
under a numeric effluent limitation for TSS imposed under the New
Jersey Pollution Discharge Elimination System (NJPDES) rules, N.J.A.C.
7:14A, or in a discharge specifically exempt under a NJPDES permit
from this requirement. The water quality design storm is 1.25 inches
of rainfall in two hours. Water quality calculations shall take into
account the distribution of rain from the water quality design storm,
as reflected in Table 1. The calculation of the volume of runoff may
take into account the implementation of non-structural and structural
stormwater management measures.
Time
(minutes)
|
Cumulative Rainfall
(inches)
|
---|
0
|
0.0000
|
5
|
0.0083
|
10
|
0.0166
|
15
|
0.0250
|
20
|
0.0500
|
25
|
0.0750
|
30
|
0.1000
|
35
|
0.1330
|
40
|
0.1660
|
45
|
0.2000
|
50
|
0.2583
|
55
|
0.3583
|
60
|
0.6250
|
65
|
0.8917
|
70
|
0.9917
|
75
|
1.0500
|
80
|
1.0840
|
85
|
1.1170
|
90
|
1.1500
|
95
|
1.1750
|
100
|
1.2000
|
105
|
1.2250
|
110
|
1.2334
|
115
|
1.2417
|
120
|
1.2500
|
(2) For purposes of TSS reduction calculations, Table 2 below presents the presumed removal rates for certain BMPs designed in accordance with the New Jersey Stormwater Best Management Practices Manual. The BMP Manual may be obtained from the address identified in Section
30-137, or found on the Department's website at www.njstormwater.org (or successor website). The BMP Manual and other sources of technical guidance are listed in Section
30-137. TSS reduction shall be calculated based on the removal rates for the BMPs in Table 2 below. Alternative removal rates and methods of calculating removal rates may be used if the design engineer provides documentation demonstrating the capability of these alternative rates and methods to the review agency. A copy of any approved alternative rate or method of calculating the removal rate shall be provided to the Department at the following address: Division of Watershed Management, New Jersey Department of Environmental Protection, PO Box 418, Trenton, New Jersey, 08625-0418 (or successor address).
(3) If more than one BMP in series is necessary to achieve the required
80% TSS reduction for a site, the applicant shall utilize the following
formula to calculate TSS reduction:
R = A + B – (AXB)/100
Where
R = total TSS percent load removal from application of both
BMPs, and
A = the TSS percent removal rate applicable to the first BMP
B = the TSS percent removal rate applicable to the second BMP.
Table 2: TSS Removal Rates for Best Management Practices (BMPs)
|
---|
Best Management
|
Practice TSS %
|
---|
Bioretention Systems
|
90
|
Constructed Stormwater Wetland
|
90
|
Extended Detention Basin
|
40-60
|
Infiltration Structure
|
80
|
Manufactured Treatment Device
|
|
Sand Filter
|
80
|
Vegetative Filter Strip
|
60-80
|
Wet Pond
|
50-90
|
(4) If there is more than one onsite drainage area, the 80% TSS removal
rate shall apply to each drainage area, unless the runoff from the
subareas converge on site in which case the removal rate can be demonstrated
through a calculation using a weighted average.
(5) Stormwater management measures shall also be designed to reduce, to the maximum extent feasible, the post-construction nutrient load of the anticipated load from the developed site in stormwater runoff generated from the water quality design storm. In achieving reduction of nutrients to the maximum extent feasible, the design of the site shall include nonstructural strategies and structural measures that optimize nutrient removal while still achieving the performance standards in Sections
30-134F and
30-134G.
(6) Additional information and examples are contained in the New Jersey Stormwater Best Management Practices Manual, which may be obtained from the address identified in Section
30-137.
(7) In accordance with the definition of FW1 at N.J.A.C. 7:9B-1.4, stormwater
management measures shall be designed to prevent any increase in stormwater
runoff to waters classified as FW 1.
(8) Special water resource protection areas shall be established along
all waters designated Category One at N.J.A.C. 7:9B and perennial
or intermittent streams that drain into or upstream of the Category
One waters as shown on the USGS Quadrangle Maps or in the County Soil
Surveys, within the associated HUC14 drainage. These areas shall be
established for the protection of water quality, aesthetic value,
exceptional ecological significance, exceptional recreational significance,
exceptional water supply significance, and exceptional fisheries significance
of those established Category One waters. These areas shall be designated
and protected as follows:
(a)
The applicant shall preserve and maintain a special water resource
protection area in accordance with one of the following:
[1]
A 300-foot special water resource protection area shall be provided
on each side of the waterway, measured perpendicular to the waterway
from the top of the bank outwards or from the centerline of the waterway
where the bank is not defined, consisting of existing vegetation or
vegetation allowed to follow natural succession is provided.
[2]
Encroachment within the designated special water resource protection
area under paragraph [1] above shall only be allowed where previous
development or disturbance has occurred (for example, active agricultural
use, parking area or maintained lawn area). The encroachment shall
only be allowed where applicant demonstrates that the functional value
and overall condition of the special water resource protection area
will be maintained to the maximum extent practicable. In no case shall
the remaining special water resource protection area be reduced to
less than 150 feet as measured perpendicular to the top of bank of
the waterway or centerline of the waterway where the bank is undefined.
All encroachments proposed under this subparagraph shall be subject
to review and approval by the Department.
(b)
All stormwater shall be discharged outside of and flow through
the special water resource protection area and shall comply with the
Standard For Off-Site Stability in the "Standards for Soil Erosion
and Sediment Control in New Jersey," established under the Soil Erosion
and Sediment Control Act, N.J.S.A. 4:24-39 et seq.
(c)
If stormwater discharged outside of and flowing through the
special water resource protection area cannot comply with the Standard
For Off-Site Stability in the "Standards for Soil Erosion and Sediment
Control in New Jersey," established under the Soil Erosion and Sediment
Control Act, N.J.S.A. 4:24-39 et seq., then the stabilization measures
in accordance with the requirements of the above standards may be
placed within the special water resource protection area, provided
that:
[1]
Stabilization measures shall not be placed within 150 feet of
the Category One waterway;
[2]
Stormwater associated with discharges allowed by this section
shall achieve a 95% TSS post construction removal rate;
[3]
Temperature shall be addressed to ensure no impact on receiving
waterway;
[4]
The encroachment shall only be allowed where the applicant demonstrates
that the functional value and overall condition of the special water
resource protection area will be maintained to the maximum extent
practicable;
[5]
A conceptual project design meeting shall be held with the appropriate
Department staff and Soil Conservation District staff to identify
necessary stabilization measures; and
[6]
All encroachments proposed under this section shall be subject
to review and approval by the Department.
(d)
A stream corridor protection plan may be developed by a regional stormwater management planning committee as an element of a regional stormwater management plan, or by a municipality through an adopted municipal stormwater management plan. If a stream corridor protection plan for a waterway subject to Section
30-134G(8) has been approved by the Department of Environmental Protection, then the provisions of the plan shall be the applicable special water resource protection area requirements for that waterway. A stream corridor protection plan for a waterway subject to Section
30-134G(8) shall maintain or enhance the current functional value and overall condition of the special water resource protection area as defined in Section
30-134G(8)(a)[1] above. In no case shall a stream corridor protection plan allow the reduction of the Special Water Resource Protection Area to less than 150 feet as measured perpendicular to the waterway subject to this subsection.
[Added 12-19-2005 by Ord.
No. 2005-004]
A. Calculation of stormwater runoff. Stormwater runoff shall be calculated
in accordance with the following:
(1) The design engineer shall calculate runoff using one of the following
methods:
(a)
The USDA Natural Resources Conservation Service (NRCS) methodology,
including the NRCS Runoff Equation and Dimensionless Unit Hydrograph,
as described in the NRCS National Engineering Handbook Section 4 —
Hydrology and Technical Release 55 — Urban Hydrology for Small
Watersheds; or
(b)
The Rational Method for peak flow and the Modified Rational
Method for hydrograph computations.
(2) For the purpose of calculating runoff coefficients and groundwater
recharge, there is a presumption that the preconstruction condition
of a site or portion thereof is a wooded land use with good hydrologic
condition. The term "runoff coefficient" applies to both the NRCS
methodology at paragraph A(1)(a) and the Rational and Modified Rational
Methods at paragraph A(1)(b). A runoff coefficient or a groundwater
recharge land cover for an existing condition may be used on all or
a portion of the site if the design engineer verifies that the hydrologic
condition has existed on the site or portion of the site for at least
five years without interruption prior to the time of application.
If more than one land cover have existed on the site during the five
years immediately prior to the time of application, the land cover
with the lowest runoff potential shall be used for the computations.
In addition, there is the presumption that the site is in good hydrologic
condition (if the land use type is pasture, lawn, or park), with good
cover (if the land use type is woods), or with good hydrologic condition
and conservation treatment (if the land use type is cultivation).
(3) In computing pre-construction stormwater runoff, the design engineer
shall account for all significant land features and structures, such
as ponds, wetlands, depressions, hedgerows, or culverts, that may
reduce pre-construction stormwater runoff rates and volumes.
(4) In computing stormwater runoff from all design storms, the design
engineer shall consider the relative stormwater runoff rates and/or
volumes of pervious and impervious surfaces separately to accurately
compute the rates and volume of stormwater runoff from the site. To
calculate runoff from unconnected impervious cover, urban impervious
area modifications as described in the NRCS Technical Release-55,
Urban Hydrology for Small Watersheds and other methods may be employed.
(5) If the invert of the outlet structure of a stormwater management
measure is below the flood hazard design flood elevation as defined
at N.J.A.C. 7:13, the design engineer shall take into account the
effects of tailwater in the design of structural stormwater management
measures.
B. Calculation of groundwater recharge. Groundwater recharge may be
calculated in accordance with the following:
(1) The New Jersey Geological Survey Geological Survey Report GSR-32
A Method for Evaluating Ground-Water Recharge Areas in New Jersey,
incorporated herein by reference as amended and supplemented. Information
regarding the methodology is available from the New Jersey Stormwater
Best Management Practices Manual; at http://www.state.nj.us/dep/njgs/
(or successor website), or at New Jersey Geological Survey, 29 Arctic
Parkway, P.O. Box 427, Trenton, New Jersey 08625-0427; (609) 984-6587
(or successor address).
[Added 12-19-2005 by Ord.
No. 2005-04]
A. Standards. Standards for structural stormwater management measures
are as follows:
(1) Structural stormwater management measures shall be designed to take
into account the existing site conditions, including, for example,
environmentally critical areas, wetlands; flood-prone areas; slopes;
depth to seasonal high water table; soil type, permeability and texture;
drainage area and drainage patterns; and the presence of solution-prone
carbonate rocks (limestone).
(2) Structural stormwater management measures shall be designed to minimize maintenance, facilitate maintenance and repairs, and ensure proper functioning. Trash racks shall be installed at the intake to the outlet structure as appropriate, and shall have parallel bars with one-inch spacing between the bars to the elevation of the water quality design storm. For elevations higher than the water quality design storm, the parallel bars at the outlet structure shall be spaced no greater than 1/3 the width of the diameter of the orifice or 1/3 the width of the weir, with a minimum spacing between bars of one inch and a maximum spacing between bars of six inches. In addition, the design of trash racks must comply with the requirements of Section
30-138C.
(3) Structural stormwater management measures shall be designed, constructed,
and installed to be strong, durable, and corrosion resistant. Measures
that are consistent with the relevant portions of the Residential
Site Improvement Standards at N.J.A.C. 5:21-7.3, 7.4, and 7.5 shall
be deemed to meet this requirement.
(4) At the intake to the outlet from the stormwater management basin,
the orifice size shall be a minimum of two and one-half inches in
diameter.
(5) Stormwater management basins shall be designed to meet the minimum safety standards for stormwater management basins at Section
30-138.
B. Guidelines. Stormwater management measure guidelines are available in the New Jersey Stormwater Best Management Practices Manual. Other stormwater management measures may be utilized provided the design engineer demonstrates that the proposed measure and its design will accomplish the required water quantity, groundwater recharge and water quality design and performance standards established by this Article
V.
C. Manufactured devices. Manufactured treatment devices may be used to meet the requirements of this Article
V, provided the pollutant removal rates are verified by the New Jersey Corporation for Advanced Technology and certified by the Department.
[Added 12-19-2005 by Ord.
No. 2005-004]
A. Technical guidance. Technical guidance for stormwater management
measures can be found in the documents listed at paragraphs A(1) and
A(2) below, which are available from Maps and Publications, Department
of Environmental Protection, 428 East State Street, P.O. Box 420,
Trenton, New Jersey, 08625 (or successor address); telephone (609)
777-1038 (or successor telephone number).
(1) Guidelines for stormwater management measures are contained in the
New Jersey Stormwater Best Management Practices Manual, as amended.
Information is provided on stormwater management measures such as:
bioretention systems, constructed stormwater wetlands, dry wells,
extended detention basins, infiltration structures, manufactured treatment
devices, pervious paving, sand filters, vegetative filter strips,
and wet ponds.
(2) The New Jersey Department of Environmental Protection Stormwater
Management Facilities Maintenance Manual, as amended.
B. Additional guidance.. Additional technical guidance for stormwater
management measures can be obtained from the following:
(1) The "Standards for Soil Erosion and Sediment Control in New Jersey"
promulgated by the State Soil Conservation Committee and incorporated
into N.J.A.C. 2:90. Copies of these standards may be obtained by contacting
the State Soil Conservation Committee or any of the Soil Conservation
Districts listed in N.J.A.C. 2:90-1.3(a)4. The location, address,
and telephone number of each Soil Conservation District may be obtained
from the State Soil Conservation Committee, P.O. Box 330, Trenton,
New Jersey 08625; (609) 292-5540 (or successor address and telephone
number);
(2) The Rutgers Cooperative Extension Service, (732) 932-9306; and
(3) The Soil Conservation Districts listed in N.J.A.C. 2:90-1.3(a)4.
The location, address, and telephone number of each Soil Conservation
District may be obtained from the State Soil Conservation Committee,
P.O. Box 330, Trenton, New Jersey, 08625, (609) 292-5540 (or successor
address and telephone number).
[Added 12-19-2005 by Ord.
No. 2005-004]
A. Purpose. This section sets forth requirements to protect public safety
through the proper design and operation of stormwater management basins.
This section applies to any new stormwater management basin.
B. Intent. The provisions of this section are not intended to preempt more stringent municipal or county safety requirements for new or existing stormwater management basins. Other existing municipal and county stormwater management plans and ordinances may, pursuant to their authority, require existing stormwater management basins to be retrofitted to meet one or more of the safety standards in Section
30-138 C(1), C(2) and C(3) for trash racks, overflow grates, and escape provisions at outlet structures.
C. Requirements for trash racks, overflow grates and escape provisions.
(1) A trash rack is a device designed to catch trash and debris and prevent
the clogging of outlet structures. Trash racks shall be installed
at the intake to the outlet from the stormwater management basin to
ensure proper functioning of the basin outlets in accordance with
the following:
(a)
The trash rack shall have parallel bars, with no greater than
six inch spacing between the bars.
(b)
The trash rack shall be designed so as not to adversely affect
the hydraulic performance of the outlet pipe or structure.
(c)
The average velocity of flow through a clean trash rack is not
to exceed two and one-half feet per second under the full range of
stage and discharge. Velocity is to be computed on the basis of the
net area of opening through the rack.
(d)
The trash rack shall be constructed and installed to be rigid,
durable, and corrosion resistant, and shall be designed to withstand
a perpendicular live loading of 300 lbs./ft. sq.
(2) An overflow grate is designed to prevent obstruction of the overflow
structure. If an outlet structure has an overflow grate, such grate
shall meet the following requirements:
(a)
The overflow grate shall be secured to the outlet structure
but removable for emergencies and maintenance.
(b)
The overflow grate spacing shall be no less than two inches
across the smallest dimension.
(c)
The overflow grate shall be constructed and installed to be
rigid, durable, and corrosion resistant, and shall be designed to
withstand a perpendicular live loading of 300 lbs./ft. sq.
(3) For purposes of this subsection, escape provisions means the permanent
installation of ladders, steps, rungs, or other features that provide
easily accessible means of egress from stormwater management basins.
Stormwater management basins shall include escape provisions as follows:
(a)
If a stormwater management basin has an outlet structure, escape provisions shall be incorporated in or on the structure. With the prior approval of the reviewing agency identified in Section
30-138D, a freestanding outlet structure may be exempted from this requirement.
(b)
Safety ledges shall be constructed on the slopes of all new stormwater management basins having a permanent pool of water deeper than two and one-half feet. Such safety ledges shall be comprised of two steps. Each step shall be four to six feet in width. One step shall be located approximately two and one-half feet below the permanent water surface, and the second step shall be located one to one and one-half feet above the permanent water surface. See Section
30-138E for an illustration of safety ledges in a stormwater management basin.
(c)
In new stormwater management basins, the maximum interior slope
for an earthen dam, embankment, or berm shall not be steeper than
3 horizontal to 1 vertical.
D. Variance or exemption from safety standards.
(1) When considering a waiver from the safety standards for stormwater
management basins, the Planning Board shall consider, among all other
pertinent factors, whether granting the request will constitute a
threat to public safety.
E. Illustration
of safety ledges in a new stormwater management basin.
[Added 12-19-2005 by Ord.
No. 2005-004]
A. Submission of stormwater control plan.
(1) Whenever an applicant seeks municipal approval of a development subject to this Article
V, the applicant shall submit all of the required components of the Checklist for the Stormwater Control Plan at Section
30-139C below as part of the submission of the applicant's application for subdivision or site plan approval.
(2) The applicant shall demonstrate that the project meets the standards set forth in this Article
V.
(3) The applicant shall submit five copies of the materials listed in the Checklist for Stormwater Control Plans in accordance with Section
30-139C, unless this submission is part of a subdivision or land development application, in which case the applicant shall submit 12 copies of the materials in the Checklist for Stormwater Control Plans in accordance with Section
30-139C.
B. Stormwater control plan approval. The applicant's site development project shall be reviewed as a part of the subdivision or site plan review process by the municipal board or official from which municipal approval is sought. That municipal board or official shall consult the Borough Engineer retained by the Planning Board to determine if all the checklist requirements have been satisfied and to determine if the project meets the standards set forth in this Article
V.
C. Checklist requirements. The following information shall be required:
(1) Topographic Base Map.
The reviewing engineer may require upstream tributary drainage
system information as necessary. It is recommended that the topographic
base map of the site be submitted which extends a minimum of 200 feet
beyond the limits of the proposed development, at a scale of 1"=200'
or greater, showing 2- foot contour intervals. The map as appropriate
may indicate the following: existing surface water drainage, shorelines,
steep slopes, soils, erodible soils, perennial or intermittent streams
that drain into or upstream of the Category 1 waters, wetlands and
flood plains along with their appropriate buffer strips, marshlands
and other wetlands, pervious or vegetative surfaces, existing manmade
structures, roads, bearing and distances of property lines, and significant
natural and manmade features not otherwise shown.
(2) Environmental Site Analysis.
A written and graphic description of the natural and manmade
features of the site and its environs.
This description should include a discussion of soil conditions,
slopes, wetlands, waterways and vegetation on the site. Particular
attention should be given to unique, unusual, or environmentally sensitive
features and to those that provide particular opportunities or constraints
for development.
(3) Project Description and Site Plan(s).
A map (or maps) at the scale of the topographical base map indicating
the location of existing and proposed buildings, roads, parking areas,
utilities, structural facilities for stormwater management and sediment
control, and other permanent structures. The map(s) shall also clearly
show areas where alterations occur in the natural terrain and cover,
including lawns and other landscaping, and seasonal high ground water
elevations. A written description of the site plan and justification
of proposed changes in natural conditions may also be provided.
(4) Land Use Planning and Source Control Plan.
This plan shall provide a demonstration of how the goals and standards of Sections
30-133 through
30-136 are being met. The focus of this plan shall be to describe how the site is being developed to meet the objective of controlling groundwater recharge, stormwater quality and stormwater quantity problems at the source by land management and source controls whenever possible.
(5) Stormwater Management Facilities Map.
The following information, illustrated on a map of the same
scale as the topographic base map, shall be included:
(a)
Total area to be paved or built upon, proposed surface contours,
land area to be occupied by the stormwater management facilities and
the type of vegetation thereon, and details of the proposed plan to
control and dispose of stormwater.
(b)
Details of all stormwater management facility designs, during
and after construction, including discharge provisions, discharge
capacity for each outlet at different levels of detention and emergency
spillway provisions with maximum discharge capacity of each spillway.
(6) Calculations.
(a)
Comprehensive hydrologic and hydraulic design calculations for the pre-development and post development conditions for the design storms specified in Section
30-134 of this Article
V.
(b)
When the proposed stormwater management control measures (e.g.
infiltration basins) depends on the hydrologic properties of soils,
then a soils report shall be submitted. The soils report shall be
based on on-site boring logs or soil pit profiles. The number and
location of required soil borings or soil pits shall be determined
based on what is needed to determine the suitability and distribution
of soil types present at the location of the control measure.
(7) Maintenance and Repair Plan.
The design and planning of the stormwater management facility shall meet the maintenance requirements of Section
30-143.
(8) Waiver from Submission Requirements.
The municipal official or board reviewing an application under this Article
V may, in consultation with the Borough Engineer, waive submission of any of the requirements in Sections
30-139C(1) through
30-139C(6) when it can be demonstrated that the information requested is impossible to obtain or it would create a hardship on the applicant to obtain and its absence will not materially affect the review process.
[Added 12-19-2005 by Ord.
No. 2005-004]
A. The Borough Engineer or his municipal designee shall inspect all
phases of the installation of the permanent BMPs and/or stormwater
management facilities as deemed appropriate by the Borough Engineer.
B. During any stage of the work, if the Borough Engineer or his municipal designee determines that the permanent BMPs and/or stormwater management facilities are not being installed in accordance with the approved stormwater management plan, the Borough shall revoke any existing permits or other approvals and issue a cease and desist order until a revised drainage plan is submitted and approved, as specified in Article
V in its entirety, and until the deficiencies are corrected.
C. A final inspection of all BMPs and/or stormwater management facilities
shall be conducted by the Borough Engineer or his municipal designee
to confirm compliance with the approved drainage plan prior to the
issuance of any occupancy permit.
[Added 12-19-2005 by Ord.
No. 2005-004]
A. Application procedures. Every application for Stormwater Control
Plan approval shall be accompanied by a check payable to the Borough
of Millstone, in accordance with the schedule set forth within this
section. Applications for development requiring a combination of approvals
(e.g., subdivision, site plan, and/or hardship variances) shall pay
an amount equal to the sum of the amounts of the separate elements
of relief requested, including an amount for each variance. In no
case shall the escrow deposit required at the time of the application
exceed $30,000. The amount of any unexpected escrow deposits for review
shall be a credit toward fees for review of the application for stormwater
control. The application shall be deemed incomplete if the fees and
deposits are not paid. Whether or not specifically stated in the resolution
of memorialization, payment in a timely manner of all escrow fees
which shall become due, shall become a condition of approval of any
application.
B. Fees to cover expenses. The application charge is a flat fee to cover
direct administrative expenses and is non-refundable. The escrow deposit
is established to cover the costs of professional services, including:
(1) The review of the drainage plan by the Borough Engineer and such
other professionals as the Borough chooses, the Planning Board and
its professionals.
(3) The inspection of stormwater management facilities and drainage improvements
during construction.
(4) The final inspection upon completion of the stormwater management
facilities and drainage improvements presented in the drainage plan.
(5) Any additional work required to enforce any permit provisions regulated by this Article
V, correct violations, and assure proper completion of stipulated remedial actions.
Sums not utilized in the review process shall be returned to the developer. Insufficient funds and municipal remedies thereof shall be administered in accordance with Section
30-151C. Periodic accounting of the escrow account shall be administered in accordance with Section
30-151D. Closeout procedures shall be administered in accordance with Section
30-151E.
C. Fee schedule. The attached fee schedule for a Stormwater Control
Plan is hereby established with respect to development projects within
the Borough of Millstone, County of Somerset.
|
Filing Fee
|
Escrow Deposit
|
---|
A stormwater management plan per Section 30-139: Stormwater Control Plan
|
$250
|
$1,500 per the first acre or less, and $1,000 per each acre
or portion thereafter.
|
[Added 12-19-2005 by Ord.
No. 2005-004]
A. Guarantee. For all stormwater improvements, the applicant shall provide
a financial guarantee to the Borough for the timely installation and
proper construction of all stormwater management controls.
(1) Performance guarantees shall be in accordance with regulations set forth in Article
III, Section
30-125C and
30-125D herein.
[Added 12-19-2005 by Ord.
No. 2005-004]
A. Applicability.
(1) Projects subject to review as in Section
30-132C of this Article
V shall comply with the requirements of Section
30-143B and 30-143C.
B. General maintenance.
(1) The design engineer shall prepare a maintenance plan for the stormwater
management measures incorporated into the design of the development.
(2) The maintenance plan shall contain specific preventative maintenance
tasks and schedules; cost estimates, including estimated cost of sediment,
debris, or trash removal; and the name, address, and telephone number
of the person or persons responsible for preventative and corrective
maintenance (including replacement). Maintenance guidelines for stormwater
management measures are available in the New Jersey Stormwater Best
Management Practices Manual. If the maintenance plan identifies a
person other than the developer (for example, a public agency or homeowners'
association) as having the responsibility for maintenance, the plan
shall include documentation of such person's agreement to assume
this responsibility, or of the developer's obligation to dedicate
a stormwater management facility to such person under an applicable
ordinance or regulation.
(3) Responsibility for maintenance shall not be assigned or transferred
to the owner or tenant of an individual property in a residential
development or project, unless such owner or tenant owns or leases
the entire residential development or project.
(4) If the person responsible for maintenance identified under Section
30-143B(2) above is not a public agency, the deed of record shall refer to the maintenance plan on file with the Borough of Millstone.
(5) Preventative and corrective maintenance shall be performed to maintain
the function of the stormwater management measure, including repairs
or replacement to the structure; removal of sediment, debris, or trash;
restoration of eroded areas; snow and ice removal; fence repair or
replacement; restoration of vegetation; and repair or replacement
of nonvegetated linings.
(6) The person responsible for maintenance identified under Section
30-143B(2) above shall maintain a detailed log of all preventative and corrective maintenance for the structural stormwater management measures incorporated into the design of the development, including a record of all inspections and copies of all maintenance-related work orders.
(7) The person responsible for maintenance identified under Section
30-143B(2) above shall evaluate the effectiveness of the maintenance plan at least once per year and adjust the plan and the deed as needed.
(8) The person responsible for maintenance identified under Section
30-143B(2) above shall retain and make available, upon request by any public entity with administrative, health, environmental, or safety authority over the site, the maintenance plan and the documentation required by Section
30-143B(6) and
30-143B(7) above.
(9) The requirements of Sections
30-143B(3) and
30-143B(4) do not apply to stormwater management facilities that are dedicated to and accepted by the Borough or another governmental agency.
(10)
In the event that the stormwater management facility becomes
a danger to public safety or public health, or if it is in need of
maintenance, the Borough shall so notify the responsible person in
writing. Upon receipt of that notice, the responsible person shall
have 14 days to affect maintenance and repair of the facility in a
manner that is approved by the Borough Engineer or his designee. If
the responsible person fails or refuses to perform such maintenance
and repair, the Borough or County may immediately proceed to do so
and shall bill the cost thereof to the responsible person.
[Added 12-19-2005 by Ord.
No. 2005-004]
A. Prohibited discharges.
(1) No person in the Borough shall allow, or cause to allow, stormwater discharges into the Borough's separate storm sewer system which are not composed entirely of stormwater, except 1) as provided in Section
30-144A(2) below, and 2) discharges allowed under a State or Federal permit.
(2) Discharges that may be allowed based on a finding by the Borough
that the discharge(s) do not significantly contribute to pollution
to surface waters of the State are:
(a)
Discharges from fire fighting activities.
(b)
Potable water sources including dechlorinated water line and
fire hydrant flushings.
(d)
Routine external building washdown (which does not use detergents
or other compounds).
(e)
Air conditioning condensate.
(f)
Water from individual residential car washing.
(g)
Spring water from crawl space pumps.
(h)
Uncontaminated water from foundation or from footing drains.
(i)
Flows from riparian habitats and wetlands.
(k)
Pavement washwaters where spills or leaks of toxic or hazardous
materials have not occurred (unless all spill material has been removed)
and where detergents are not used.
(l)
Dechlorinated swimming pool discharges.
(m)
Uncontaminated groundwater.
(3) In the event that the Borough determines that any of the discharges identified in Section
30-144A(2) significantly contribute to pollution of waters of the State, or is so notified by NJDEP, the Borough will notify the responsible person to cease the discharge.
(4) Upon notice provided by the Borough under Section
30-144A(3), the discharger will have a reasonable time, as determined by the Borough, to cease the discharge consistent with the degree of pollution caused by the discharge.
(5) Nothing in this section shall affect a discharger's responsibilities
under State law.
B. Prohibited connections.
(1) The following connections are prohibited, except as provided in Section
30-144A(2) above:
(a)
Any drain or conveyance, whether on the surface or subsurface,
which allows any nonstormwater discharge including sewage, process
wastewater, and wash water to enter the separate storm sewer system
and any connections to the storm drain system from indoor drains and
sinks; and
(b)
Any drain or conveyance connected from a commercial or industrial
land use to the separate storm sewer system which has not been documented
in plans, maps, or equivalent records and approved by the Borough.
C. Roof drains.
(1) Roof drains shall not be connected to streets, sanitary or storm
sewers, or roadside ditches in order to promote overland flow and
infiltration/percolation of stormwater where advantageous to do so.
(2) When it is more advantageous to connect directly to streets or storm
sewers, connections of roof drains to streets or roadside ditches
may be permitted on a case by case basis as determined by the Borough.
Roof drains shall discharge to infiltration areas or vegetative
BMPs to the maximum extent practicable.
D. Alteration of bmps.
(1) No person shall modify, remove, fill, landscape, or alter any existing
stormwater control or BMP unless it is part of an approved maintenance
program without the written approval of the Borough.
(2) No person shall place any structure, fill, landscaping, or vegetation
into a stormwater control or BMP or within a drainage easement which
would limit or alter the functioning of the stormwater control or
BMP without the written approval of the Borough.
[Added 12-19-2005 by Ord.
No. 2005-004]
A. Right-of-entry.
(1) Upon presentation of proper credentials, duly authorized representatives of the Borough may enter at reasonable times upon any property within the Borough to inspect the implementation, condition, or operation and maintenance of the stormwater controls or BMPs in regard to any aspect governed by this Article
V.
(2) Stormwater control and BMP owners and operators shall allow persons working on behalf of the Borough ready access to all parts of the premises for the purposes of determining compliance with this Article
V.
(3) Persons working on behalf of the Borough shall have the right to
temporarily locate on any stormwater control or BMP in the Borough
such devices as are necessary to conduct monitoring and/or sampling
of the discharges from such stormwater control or BMP.
(4) Unreasonable delays in allowing the Borough access to a stormwater control or BMP is a violation of this Article
V.
B. Municipal implementation of maintenance.
(1) The Borough or its designee shall have the authority to perform maintenance
if the applicant fails to do so, in which case it may charge the owner
therefor.
C. Enforcement generally.
(1) Whenever the Borough finds that a person has violated a prohibition or failed to meet a requirement of this Article
V the Borough may order compliance by written notice to the responsible person. Such notice may, without limitation, require the following remedies:
(a)
Performance of monitoring, analyses, and reporting;
(b)
Elimination of prohibited connections or discharges;
(c)
Cessation of any violating discharges, practices, or operations;
(d)
Abatement or remediation of stormwater pollution or contamination
hazards and the restoration of any affected property;
(e)
Payment of a fine to cover administrative and remediation costs;
(f)
Implementation of stormwater controls and BMPs; and
(g)
Operation and maintenance of stormwater controls and BMPs.
(2) Failure to comply within the time specified shall also subject such person to the penalty provisions of this Article
V. All such penalties shall be deemed cumulative and shall not prevent the Borough from pursuing any and all other remedies available in law or equity.
D. Suspension and revocation of permits and approvals.
(1) Any building, land development, or other permit or approval issued
by the Borough may be suspended or revoked by the Borough for:
(a)
Noncompliance with or failure to implement any provision of
the permit;
(b)
A violation of any provision of this Article
V; or
(c)
The creation of any condition or the commission of any act during
construction or development which constitutes or creates a hazard
or nuisance, pollution, or which endangers the life, health, or property
of others.
(2) A suspended permit or approval shall be reinstated by the Borough
when:
(a)
The Borough Engineer or designee has inspected and approved
the corrections to the stormwater controls and BMPs or the elimination
of the hazard or nuisance, and/or
(b)
The Borough is satisfied that the violation of this Article
V, law, or rule and regulation has been corrected.
(3) A permit or approval that has been revoked by the Borough cannot be reinstated. The applicant may apply for a new permit under the procedures outlined in this Article
V.
E. Penalties.
(1) Any person violating the provisions of this Article
V shall be subject to a fine of not less than $100 nor more than $1,000 for each violation, recoverable with costs; each day that the violation continues shall constitute a separate offense and the applicable fines are cumulative, as outlined in Section
30-153 herein.
(2) In addition, the Borough, through its Attorney, may institute injunctive, or any other appropriate action or proceeding at law or in equity for the enforcement of this Article
V.
F. Notification. In the event that a person fails to comply with the requirements of this Article
V or fails to conform to the requirements of any permit issued hereunder, the Borough shall provide written notification of the violation. Such notification shall state the nature of the violation(s) and establish a time limit for correction of these violation(s). Said notice may further advise that, if applicable, should the violator fail to take the required action within the established deadline, the work will be done by the Borough or designee, and the expense thereof shall be charged to the violator. Failure to comply within the time specified shall subject such person to the penalty provisions of this Article
V. All such penalties shall be deemed cumulative and shall not prevent the Borough from pursuing any and all remedies. It shall be the responsibility of the owner of the real property on which any regulated activity is proposed to occur, is occurring, or has occurred to comply with the terms and conditions of this Article
V.
[Added 12-19-2005 by Ord.
No. 2005-004]
Unless specifically defined below, words or phrases used in this Article
V shall be interpreted so as to give them the meaning they have in common usage and to give this Article
V its most reasonable application.
BMP
The Best Management Practices.
COUNTY REVIEW AGENCY
An agency designated by the County Board of Chosen Freeholders
to review municipal stormwater management plans and implementing ordinance(s).
The County Review Agency may either be a county planning agency; or
a county water resource association created under N.J.S.A. 58:16A-55.5,
if the ordinance or resolution delegates authority to approve, conditionally
approve, or disapprove municipal stormwater management plans and implementing
ordinances.
DEPARTMENT
The New Jersey Department of Environmental Protection.
DESIGNATED CENTER
A State Development and Redevelopment Plan Center as designated
by the State Planning Commission such as urban, regional, town, village,
or hamlet.
DESIGN ENGINEER
A person professionally qualified and duly licensed in New
Jersey to perform engineering services that may include, but not necessarily
be limited to, development of project requirements, creation and development
of project design and preparation of drawings and specifications.
DEVELOPMENT
In this section, means the division of a parcel of land into
two or more parcels, the construction, reconstruction, conversion,
structural alteration, relocation or enlargement of any building or
structure, any mining excavation or landfill, and any use or change
in the use of any building or other structure, or land or extension
of use of land, for which permission is required under the Municipal
Land Use Law, N.J.S.A. 40:55D-1 et seq., or any "development" that
provides for ultimately disturbing one or more acres of land or increasing
impervious surface by one-quarter acre or more. In the case of development
of agricultural lands, development means: any activity that requires
a State permit; any activity reviewed by the County Agricultural Board
(CAB) and the State Agricultural Development Committee (SADC), and
municipal review of any activity not exempted by the Right to Farm
Act, N.J.S.A. 4:1C-1 et seq. Projects undertaken by any government
agency which do not require approval under the Municipal Land Use
Law, N.J.S.A. 40:55D-1 et seq. are also considered "development."
DISTURBANCE
The placement of impervious surface or exposure and/or movement
of soil or bedrock or clearing, cutting, or removing of vegetation.
DRAINAGE AREA
A geographic area within which stormwater, sediments, or
dissolved materials drain to a particular receiving waterbody or to
a particular point along a receiving waterbody.
ENVIRONMENTALLY CONSTRAINED AREA
The following areas where the physical alteration of the
land is in some way restricted, either through regulation, easement,
deed restriction or ownership such as: wetlands, floodplains, threatened
and endangered species sites or designated habitats, and parks and
preserves. Habitats of endangered or threatened species are identified
using the Department's Landscape Project as approved by the Department's
Endangered and Nongame Species Program.
ENVIRONMENTALLY CRITICAL AREAS
An area or feature which is of significant environmental
value, including but not limited to: stream corridors; natural heritage
priority sites; habitat of endangered or threatened species; large
areas of contiguous open space or upland forest; steep slopes; and
well head protection and groundwater recharge areas. Habitats of endangered
or threatened species are identified using the Department's Landscape
Project as approved by the Department's Endangered and Nongame
Species Program.
EROSION
The detachment and movement of soil or rock fragments by
water, wind, ice or gravity.
HOTSPOT
An area where land use or activities generate highly contaminated
runoff, with concentrations of pollutants in excess of those typically
found in stormwater, as defined herein.
IMPERVIOUS SURFACE
A surface that has been covered with a layer of material
so that it is highly resistant to infiltration by water.
INFILTRATION
The process by which water that seeps into the soil from
precipitation.
NUTRIENT
A chemical element or compound, such as nitrogen or phosphorus,
which is essential to and promotes the development of organisms.
PERSON
Any individual, corporation, company, partnership, firm,
association, or political subdivision of this State and any State,
Interstate or Federal agency.
POLLUTANT
Any dredged spoil, solid waste, incinerator residue, filter
backwash, sewage, garbage, refuse, oil, grease, sewage sludge, munitions,
chemical wastes, biological materials, medical wastes, radioactive
substance (except those regulated under the Atomic Energy Act of 1954,
as amended (42 U.S.C. 2011 et seq.), thermal waste, wrecked or discarded
equipment, rock, sand, cellar dirt, industrial, municipal, agricultural,
and construction waste or runoff, or other residue discharged directly
or indirectly to the land, ground waters or surface waters of the
State, or to a domestic treatment works. Pollutant includes both hazardous
and nonhazardous pollutants.
RECHARGE
The amount of water from precipitation that infiltrates into
the ground and is not evapotranspired.
SEDIMENT
Solid material, mineral or organic, that is in suspension,
is being transported, or has been moved from its site of origin by
air, water or gravity as a product of erosion.
SITE
The lot or lots upon which the development is to occur or
has occurred.
SOIL
All unconsolidated mineral and organic material of any origin.
STORMWATER
Water resulting from precipitation (including rain and snow)
that runs off the land's surface, is transmitted to the subsurface,
or is captured by separate storm sewers or other sewage or drainage
facilities.
STORMWATER MANAGEMENT BASIN
An excavation or embankment and related areas designed to
retain stormwater runoff. A stormwater management basin may either
be normally dry (that is, a detention basin or infiltration basin),
retain water in a permanent pool (a retention basin), or be planted
mainly with wetland vegetation (most constructed stormwater wetlands).
STORMWATER MANAGEMENT MEASURE
Any structural or nonstructural strategy, practice, technology,
process, program, or other method intended to control or reduce stormwater
runoff and associated pollutants, or to induce or control the infiltration
or groundwater recharge of stormwater or to eliminate illicit or illegal
non-stormwater discharges into stormwater conveyances.
STORMWATER RUNOFF
Water flow on the surface of the ground or in storm sewers,
resulting from precipitation.
TSS
Total suspended solids.
WETLANDS OR WETLAND
An area that is inundated or saturated by surface water or
ground water at a frequency and duration sufficient to support, and
that under normal circumstances does support, a prevalence of vegetation
typically adapted for life in saturated soil conditions, commonly
known as hydrophytic vegetation.